[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-651607-105":59,"doc-detail-651607-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","vancouver-hospital-health-sciences-centre-mechanical-systems-operating-and-maintenance-manual","VANCOUVER HOSPITAL & HEALTH SCIENCES CENTRE - MECHANICAL SYSTEMS OPERATING AND MAINTENANCE MANUAL","","Operating and maintenance manual for the mechanical systems installed in the VANCOUVER HOSPITAL & HEALTH SCIENCES CENTRE Centennial Pavilion. Provides guidance for maintenance personnel on operation, routine maintenance, minor troubleshooting, repairs, and adjustments to extend equipment life, prevent breakdowns, and support fuel and power efficiency. Includes schedules, certificates and reports framework, supplier and subcontractor listings, and system descriptions such as fan systems, heat pump FC-1, and the existing supply air system extension.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":35,"@type":76,"position":81},"https://docshare.wps.com/document/healthcare/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/vancouver-hospital-health-sciences-centre-mechanical-systems-operating-and-maintenance-manual/651607/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/vancouver-hospital-health-sciences-centre-mechanical-systems-operating-and-maintenance-manual/651607.png","ImageObject",300,407,{"name":92,"@type":93},"miaandmiso","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-11-10","2026-10-24",true,{"@type":102,"interactionType":103,"userInteractionCount":34},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What is the purpose of this mechanical operating and maintenance manual?","Question",{"text":112,"@type":113},"It familiarizes maintenance personnel with operation, routine maintenance, and minor troubleshooting for mechanical systems in the building, including minor repairs and adjustments guidelines.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"Which systems are described in the manual’s Systems Description section?",{"text":117,"@type":113},"It includes fan systems, Heat Pump FC-1, and the existing supply air system addition for the Foundation Office renovations.",{"name":119,"@type":110,"acceptedAnswer":120},"How is Heat Pump FC-1 controlled?",{"text":121,"@type":113},"Heat Pump FC-1 is controlled by a local wall-mounted thermostat to maintain room temperature at the setpoint.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},651607,1793078531,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":34,"category_name":35,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":34,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":144,"read_time":145,"preview_page_count":4},7971478544854,"https://ap-avatar.wpscdn.com/davatar_994ba38a5ba835b3df7d355c54d3ed8d","# VANCOUVER HOSPITAL&HEALTH SCIENCES CENTRECENTENNIAL PAVILION\n\nFOUNDATION OFFICE RENOVATION  \nVANCOUVER,B.C.  \n# MECHANICAL SYSTEMSOPERATING AND MAINTENANCE MANUAL\n\nOWNER:  \nARCHITEC  \nENGINEER:  \nGENERAL CONTRACTOR:  \nMECHANICAL CONTRACTOR:  \nMANUALS PREPARED BY:  \nVHHSC  \n855 West 12thAvenueVancouver,B.C.V5Z 1M9  \nCEI  \nDBAl3ctwrateras ling Interiors  \nVarmcouver,B.C.  6B 4M3.898 Fax:604-682-5398  \nEarth Tech (Canada)Inc.300-4170 Still Creek DriveBurnaby,B.C.V5C 6C6Phone:604-298-6181 Fax:604-294-8597  \nJenwest Construction(1983)Ltd.1747 Shannon CourtCoquitlam,B.C.V3J6C7Phone:604-931-7345 Fax:604-939-3050  \nKerrisdale Heating and Sheet Metal(1971)Ltd.  \n5445 West BoulevardVancouver,B.C.V6M 3W5Phone:604-266-2720 Fax:604-266-7441  \nK.D.Engineering Co.239 East 6th AvenueVancouver,B.C.V5T 1J7  \nPhone:604-872-8651 Fax:604-872-0281E-mail:Manuals@teamKD.com  \n## OPERATING AND MAINTENANCE MANUAL\n\nINTRODUCTION  \nThe intent of this manual is to familiarize the maintenance personnel with theoperation,routine maintenance,and minor troubleshooting of the various mechanicalsystems installed in the building.  \nIncluded are the minor repairs and adjustments guidelines necessary to maintain themechanical systems operating in a satisfactory manner.Used properly,theinstructions included in this manual willextend the useful life of the mechanicalequipment in the building,prevent breakdowns and maintain fuel and power efficiency.  \nNo attempt has been made concerninq instructions for maintenance or repair oforecialized t chnicians and the useContact your locae,ui alancing Agency toobtain information on specialized maintenance literature,tools and service provided.  \nSCHEDULES,CERTIFICATES AND REPORTS  \nLIST OF EQUIPMENT SUPPLIERS AND SUB-CONTRACTORSSYSTEMS DESCRIPTION  \nMAINTENANCE AND LUBRICATION SCHEDULESBALANCING REPORTMISCELLANEOUS CERTIFICATES,PERMITS,WARRANTIES,AND REPORTS  \nMANUFACTURERS'EQUIPMENT DATA  \nAIR TERMINALS(Grilles,Diffusers,Registers,Louvers,Dampers)CONTROL SYSTEMSFANSHEAT PUMPS  \nPLUMBINGFIXTUF S AND PIPNDBA  \nSECTION  \nA  \nB  \nC  \nD  \nE  \nG  \nH  \n## SUPPLIERS &SUB CONTRACTORS LIST\n\nAIR TERMINALS,FANS:E.H.Price Ltd.  \n\\#118-7400 MacPherson AvenueBurnaby,B.C.V5J 5B6Phone:454-0551 Fax:454-9144PLUMBING FIXTURES AND PIPINGCronkhite Supply Ltd.EQUIPMENT:1234 Napier StreetVancouver,B.C.V6A 2H6  \nPhone:604-254-5131 Fax:604-254-1041INSULATION:AARC-West Mechanical Insulation Inc.109-42 Fawcett RoadCoquitlam,B.C.V3K 6X9  \nPhone:604-524-4855 Fax:604-524-4857Vipond Fire Protection Inc.2441 United BoulevardCoquitlam,B.C.V3K 6A8  \n## FIRE PROTECTION SYSTEM:\n\nPhone:604-464-3473 Fax:604-464-3471CONTROLS:Energrated Systems Consultants Ltd.1785056th Avenue  \nPhone·604-574-7790 ax604-574-7793BALANCING A&MANUALS C  \nvu  I,  .  .vo.IJ7  \nPhone:604-872-8651 Fax:604-872-0281E-mail:Manuals@teamKD.comPLUMBING CONTRACTOR:Alma Plumbing &Heating Ltd.2103 Graveley StreetVancouver,B.C.V5L 3B8  \nPhone:604-251-2824 Fax:604-251-2862SHEET METAL CONTRACTOR:Kerrisdale Heating and Sheet Metal(1971)Ltd.5445 West BoulevardVancouver,B.C.V6M 3W5Phone:604-266-2720 Fax:604-266-7441  \n## SYSTEMS DESCRIPTION\n\nINTRODUCTION  \nThe intent of the following Systems Description is to familiarize the building operators and/ormaintenance personnel with systems and the components of such systems installed in thisproject.  \nThese Systems Description describe the type and purpose of each system along with a list ofthe system components and their locations.  \nThe system operation andoio DIClly uesuIiDeu ur arererence is iven to the controls  \n## A.N\n\nsystem documentation col ained in th     UE t i se_tion(suppli d by the ControlSubcontractor)of the OperaLy alu ViaInenance vanual.  \nNOTE:These Systems Description have been written only as a general quide.Theresponsibility for obtaining additional detailed information regarding specific operationalinformation remains with the building operators and/or maintenance personnel byresearching the documentation contained throughout the Opera","cbCaitDgAWpcgQKR","https://ap.wps.com/l/cbCaitDgAWpcgQKR","pdf",2078155,28,"English","# Operating and Maintenance Manual\n## Introduction\n## Schedules, Certificates and Reports\n## List of Equipment Suppliers and Sub-Contractors\n## Systems Description\n### Fan Systems\n### Heat Pump FC-1 Systems\n### Existing Supply Air System Addition\n## Maintenance and Lubrication Schedules","[{\"question\":\"What is the purpose of this mechanical operating and maintenance manual?\",\"answer\":\"It familiarizes maintenance personnel with operation, routine maintenance, and minor troubleshooting for mechanical systems in the building, including minor repairs and adjustments guidelines.\"},{\"question\":\"Which systems are described in the manual’s Systems Description section?\",\"answer\":\"It includes fan systems, Heat Pump FC-1, and the existing supply air system addition for the Foundation Office renovations.\"},{\"question\":\"How is Heat Pump FC-1 controlled?\",\"answer\":\"Heat Pump FC-1 is controlled by a local wall-mounted thermostat to maintain room temperature at the setpoint.\"}]","VANCOUVER HOSPITAL & HEALTH SCIENCES CENTRE - MECHANICAL SYSTEMS OPERATING AND MAINTENANCE MANUAL | PDF",1792875587,71]