[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-662961-105":59,"doc-detail-662961-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","utility-as-built-specifications-as-built-utility-drawings-survey-and-deliverables","UTILITY AS-BUILT SPECIFICATIONS - As-built Utility Drawings, Survey, and Deliverables","","Specification outlining requirements for contractors to produce and submit as-built utility documentation to Rutgers Utilities. It requires licensed surveying, timely submission of utility drawings and complete as-built document sets, compliance with Rutgers Survey and CADAs-Built Standards, and defined CAD/survey formats in NJ state plane with NAD 83 and NAVD 88. It also mandates red-line change tracking, precision surveying intervals, photographic records before backfill, and defined deliverables including CAD, PDF, signed/sealed hard copies, and utility-specific single-line and plan drawing contents.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/utility-as-built-specifications-as-built-utility-drawings-survey-and-deliverables/662961/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/utility-as-built-specifications-as-built-utility-drawings-survey-and-deliverables/662961.png","ImageObject",300,407,{"name":92,"@type":93},"The UK Girl","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-28",true,{"@type":102,"interactionType":103,"userInteractionCount":14},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"When must contractors submit utility drawings and as-built documents to Rutgers Utilities?","Question",{"text":112,"@type":113},"After installing new underground utilities, contractors must submit utility drawings within 2 weeks for review. Two weeks after completing utility installation, contractors must submit a complete set of As-Built Documents.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What standards and formats must As-Built CAD and survey drawings follow?",{"text":117,"@type":113},"Drawings must comply with Rutgers University CAD and As-Built Standards, use recent AutoCAD DWG format, apply Rutgers utility standard line-types, and be provided in NJ state plane format with NAD 83 Horizontal Datum and NAVD 88 Vertical Datum, without altered coordinate systems or views.",{"name":119,"@type":110,"acceptedAnswer":120},"What deliverables are required for the final utility as-built package?",{"text":121,"@type":113},"Deliverables include electronic CAD files for As-Built drawings and single-line diagrams, a point file of all survey points, PDF copies of the drawings and single-line diagrams, two hard copies signed and sealed by a licensed NJ Land Surveyor, two hard copies of single-line diagrams signed and sealed by a licensed NJ Professional Engineer, plus a photographic record of installations and inspections.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},662961,1793223946,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":14,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":19,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":52},2199028711991,"https://us-avatar.wpscdn.com/davatar_994ba38a5ba835b3df7d355c54d3ed8d","UTILITY AS-BUILT SPECIFICATIONS   \nUTILITY AS-BUILT SPECIFICATIONS  \nA. All contractors installing new underground utilities shall provide, at contractor's cost, a licensed surveyor for performing surveying of the new utilities. Within 2 weeks of installing utilities, contractor shall submit to Rutgers Utilities for review, utility drawings with utility-specific information as indicated below. Two weeks after the completion of utility installation, contractor shall submit a complete set of As-Built Documents. The As-Built Drawings shall comply with the Rutgers Survey and CADAs-Built Standards. If the final As-Built Documents do not meet the standards listed in this specification section, then Rutgers reserves the right to hire a locating service & surveyor to complete the work at the contractor’s sole expense.  \nB. As-Built CAD and Survey Standards  \n1. Drawings shall comply with Rutgers University CAD standards found at:  \n[https://ipo.rutgers.edu/pdd/consultants-cad-standards](https://ipo.rutgers.edu/pdd/consultants-cad-standards)  \n2. Drawings shall be in recent AutoCAD DWG drawing format.  \n3. Drawings shall use Rutgers Utility standard line-types.  \n4. Drawings shall be presented in NJ state plane format without altered coordinate systems or views.  \n5. All As-Built Drawings must be supplied as 2D drawings, and elevation data must be shown via text at critical junctions, supplemented with an ASCII text, tricoordinate point file for all survey points.  \n6. All surveys shall be performed to meet current NGS accuracy standards.  \n7. Drawings shall be drawn in the NJ state plane coordinate system, NAD 83 Horizontal Datum, and NAVD 88 Vertical Datum.  \n8. If the vertical translation is through a Geiod model, then it shall be defined and identified on all submissions.  \n9. Site Survey Control shall be established by contractor and tested by Rutgers during pre-construction.  \nC. Project Red Lines  \n1. Project shall maintain a set ofRed-Line drawings on site showing all changes to the original design as the project progresses and necessitates.  \n2. All changes shall be shown in colored pencil, primarily in red.  \n3. Notes and dimensions shall be added where necessary.  \n4. Red-Line drawings shall be made available upon request and inspected by Rutgers Utilities.  \n5. Red-Line drawings are considered “intermediate drawings” that will be utilized in part to prepare accurate As-Built Drawings but shall not be considered a substitute for As-Built Drawings.  \n6. Field modifications from the original Construction Documents shall be depicted in a manner to alert Rutgers to any changes. These shall be depicted on the Red Line and final As-Built CAD and PDF drawings.  \nD. Survey Requirements  \n1. All installed utilities must be surveyed using precision land survey practices.  \n2. All linear utility features must be surveyed at regular intervals no more than 20 feet on straight runs and at all feature, direction, and elevation changes.  \n3. All utility termination/cap points must be surveyed and labeled clearly on the As-Built Drawings. All removed utility structures and pipes must also be identified. Approximate length of removed pipes must be indicated on the AsBuilt Drawings as well. Connection point, disconnection point, and utility line re-routes must be clearly shown on the As-Built drawings.  \n4. All utilities discovered during excavation that are not previously shown on the survey must be surveyed and documented.  \nE. Photographic Record  \n1. Rutgers requires a photographic record of all utility work and installations. Photographs must be taken at the completion of new installations or repairs, just prior to backfill. Multiple photographs must be taken along the run of each utility from both directions, start to finish. Photographs must be taken in such a way to show the surrounding area features as a background reference. Photographs just showing a utility in an excavation are not acceptable. Photographs must be named and numbered","cbCaipFcADTqYrOs","https://ap.wps.com/l/cbCaipFcADTqYrOs","pdf",162696,"English","# Overview\n# As-Built CAD and Survey Standards\n# Project Red Lines\n# Survey Requirements\n# Photographic Record\n# Deliverables\n# Utility-Specific Information","[{\"question\":\"When must contractors submit utility drawings and as-built documents to Rutgers Utilities?\",\"answer\":\"After installing new underground utilities, contractors must submit utility drawings within 2 weeks for review. Two weeks after completing utility installation, contractors must submit a complete set of As-Built Documents.\"},{\"question\":\"What standards and formats must As-Built CAD and survey drawings follow?\",\"answer\":\"Drawings must comply with Rutgers University CAD and As-Built Standards, use recent AutoCAD DWG format, apply Rutgers utility standard line-types, and be provided in NJ state plane format with NAD 83 Horizontal Datum and NAVD 88 Vertical Datum, without altered coordinate systems or views.\"},{\"question\":\"What deliverables are required for the final utility as-built package?\",\"answer\":\"Deliverables include electronic CAD files for As-Built drawings and single-line diagrams, a point file of all survey points, PDF copies of the drawings and single-line diagrams, two hard copies signed and sealed by a licensed NJ Land Surveyor, two hard copies of single-line diagrams signed and sealed by a licensed NJ Professional Engineer, plus a photographic record of installations and inspections.\"}]","UTILITY AS-BUILT SPECIFICATIONS - As-built Utility Drawings, Survey, and Deliverables | PDF"]