[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-650622-105":3,"detail-sidebar-cat-0-en-105":81,"doc-detail-650622-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","usace-oman-fire-pump-control-panels-field-connections","USACE - OMAN Fire Pump Control Panels - Field Connections","","Electrical wiring schematic and field connection notes for a 3-phase fire pump control system for an Oman project. Includes automatic power transfer switch field connections, hydraulic calculation detail references, pump room requirements per NFPA 20 (heating, neutral-position lighting, emergency lighting, ventilation, drainage, and guards), and fire pump selection criteria aligned with NFPA 13 for extra hazard group 2. Provides equipment list, revision history, piping and joint material specifications, pressure sensing line routing guidance, and sprinkler system legend and general notes.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/usace-oman-fire-pump-control-panels-field-connections/650622/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/usace-oman-fire-pump-control-panels-field-connections/650622.png","ImageObject",300,407,{"name":42,"@type":43},"Ezra","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-30","2026-10-24",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",5,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What document elements cover the automatic power transfer switch field connections?","Question",{"text":63,"@type":64},"The sheet includes field connection references for the automatic power transfer switch and wiring schematic notes for a 3-phase system, including status/terminal references like engine start contacts and transfer switch positions.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"Which NFPA 20 pump room requirements are stated in the document?",{"text":68,"@type":64},"It specifies heating above 40°F/5°C when required, neutral-position artificial lighting, emergency lighting requirements per NFPA 101, ventilation provisions, drainage pitch and floor drain discharge location, and coupling/shaft guard requirements.",{"name":70,"@type":61,"acceptedAnswer":71},"How are fire pump selection criteria and sprinkler system parameters provided?",{"text":72,"@type":64},"The document lists selection criteria referencing NFPA 13 (extra hazard group 2), sprinkler operation area, water density, and total water demand, and it states pump capacity and firewater tank capacity for one-hour operation.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},650622,1792834635,{"code":4,"msg":82,"data":83},"success",[84,88,92,96,100,105,110,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":89,"show_sort_weight":90,"slug":91},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":93,"show_sort_weight":94,"slug":95},"Exam",70,"exam",{"id":55,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},6,"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":107,"show_sort_weight":108,"slug":109},7,"Healthcare",40,"healthcare",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":112,"slug":113},8,30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":55,"slug":129},19,"General","general",{"code":4,"msg":82,"data":131},{"doc_id":79,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":111,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":101,"language":139,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":12,"update_tm":80,"read_time":143},1099514068035,"https://ap-avatar.wpscdn.com/davatar_276721f389ce27ea32af1340a28f341c","FDJP Jockey Pump Controllers-3 Phase  \nFROM FIREWATER TANK  \nElectrical Wiring Schematic-3 Phase  \n# Automatic Power Transfer Switch -Field ConnectionsHYDRAULIC CALC NODE\n\n\n|  | 51   |  | ENGINE START CONTACTS   |\n| --- | --- | --- | --- |\n|  | 52   |  | (SEE NOTE A)   |\n|  | 401   |  |  |\n|  |  |  | TRANSFER SWITCH IN NORMAL   |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  | TRANSFER SWITCH IN EMERGENCY   |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  | TRANSFER SWITCH IN NORMAL   |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  | TRANSFER SWITCH IN EMERGENCY   |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  | MAIN ISOLATING SWITCH OPEN   |\n| OP1   |  |  | (TERMINALS LOCATED ON LMR+I/0 BOARD)   |\n|  |  |  |  |\n\nFIRE PUMP CONTROL PANELSENSING LINESPLAN VIEWSCALE:1:200NOTE A:TERMINALS ARE TO BE CONNECTEDTD REMOTE START CDNT4CTFROM GENERATOR  \nPUMP ROOM REQUIREMENTS PER NFPA 20  \n\n| NO   | EQUIPMENTS   |\n| --- | --- |\n| ①   | ELECTRIC FIRE PUMPS  \u003Cbr>(1000 GPM @8BAR)   |\n| ②   | JOCKEY PUMP  \u003Cbr>(19GPM @8BAR)   |\n| ③   | FIRE PUMP CONTROL PANEL WITHAUTO TRANSFER SWITCH   |\n| ④   | JOCKEY PUMP CONTROL PANEL   |\n| ⑤   | OS &YGATE VALVES   |\n| ⑥   | SWING CHECK VALVE   |\n| ⑦   | FLOW METER   |\n| 8    | HOSE VALVE HEADER WITH 4 NOS.2.5\"HOSE VALVES   |\n| ⑨   | JOCKEY PUMP SUPPLY PIPING   |\n| 10   | JOCKEY PUMP DISCHARGE PIPING   |\n\nA.4.12.3 Heat 4.12.3.1 An approved or listed source ofheat shall be provided for maintaining the temperature ofa pump room or pump house,where required,above  \n40F(5℃).ATS SHDWN WITH SWITCH DE-ENERGIZED,  \nB.4.12.4 Normal Lighting.Artificial light shall be providedIN NEUTRAL POSITIDNin a pump room or pump house.FOR FURTHER DESCRIPTIDN □F □PERATION  \nC.4.12.5 Emergency Lighting.4.12.5.1 Emergency  \nSEE □PERATION MANUAL:IB01602009E or IB01602001Rlighting shall be provided in accordance with NFPA 101,Life Safety Code.4.12.5.2 Emergency lights shall not beconnected to an engine starting battery  \n\n|  |\n| --- |\n|  |\n\n\n|  |\n| --- |\n\n\n|  |\n| --- |\n\n\n|  |  |  |  |  |\n| --- | --- | --- | --- | --- |\n|  |  |  |  |  |\n|  |  |  |  |  |\n|  |  |  |  |  |\n|  |  |  |  |  |\n|  |  |  |  |  |\n|  | 21-11-2011   | GE   | GE   | Revised per FPE review and certification   |\n|  | 20-10-2011   | BALA   | BKT   | Revised as per client's comment   |\n|  | 11-10-2011   | BALA   | BKT   | Revised as per client's comment   |\n| 0   | 15-09-2011   | BALA   | BKT   | Submitted for approval   |\n| Rev.   | Date   | Drawn   | Checked   | Remarks   |\n| REVISIONS:   |  |  |  |  |\n\nD.4.12.6 Ventilation.Provision shall be made forventilation of a pump room or pump house.  \nE.4.12.7*Drainage.4.12.7.1 Floors shall be pitched foradequate drainage of escaping water away from criticalequipment such as the pump,driver,controller,and soforth.4.12.7.2 The pump room or pump house shall beprovided with a floor drain that will discharge to afrost-free location.  \n150mm FIRE SERVICE UNDERGROUND  \nF4.12.8 Guards.Couplings and flexible connectingTO BUILDINGSshafts shall be installed with a coupling guard inaccordance with Section 8 of ANSI B15.1,SafetyStandard for Mechanical Power Transmission Apparatus.ISO DETAIL  \n\n|  | PROJECT NAME:   |  |\n| --- | --- | --- |\n\nFIRE PROTECTION SYSTEMFOR CORROSIION REPAIR BUILDNGSPROJECT OWNER:  \nFIRE PUMP SELECTION CRITERIA  \nDESIGN REFERENCE-NFPA 13-EXTRA HAZARD GROUP 2AREA OF SPRINKLER OPERATION-232 Sq.MWATER DENSITY-16.3 L/SQ.M/MIN  \nUSACEMAIN CONTRACTOR:  \nTOTAL WATER DEMAND FOR THE SPRINKLER SYSTEM-3781.6LPM =999GPMFIRE PUMP CAPACITY=1000 GPMFIREWATER TANK CAPACITY FOR 1 HOUR OPERATION-227M Cu.  \nREVISION DETAILS  \n\n| REV-1   | PUMP ORIENTATION HAS BEEN CHANGED TO AVOID THE BENDS AT THE SUCTION SIDE  \u003Cbr>PIPING ARRANGEMENTAND EQUIPMENTS LOCATIONS MODIFIED TO SUITE THE PUMPORIENTATION  \u003Cbr>THE BURIED HDPE LINE HAS CHANGED TO DUCTILE IRON PIPES   |\n| --- | --- |\n| REV-2   | HOSE TEST HEADER HAS BEEN ADDED TO THE DISCHARGE HEADER   |\n| REV-3   | MODIFICATIONS T","cbCaimJoKUZ9753E","https://ap.wps.com/l/cbCaimJoKUZ9753E","pdf",3529332,"English","# Automatic Power Transfer Switch - Field Connections\n## 3-Phase Electrical Wiring Schematic\n# Pump Room Requirements per NFPA 20\n## Heating, Lighting, Emergency Lighting\n## Ventilation, Drainage, Guards\n# Fire Pump Selection Criteria and System Notes\n## NFPA 13 Reference and Water Demand\n## Equipment and Piping Joint Specifications\n# Sprinkler Legend and General System Notes","[{\"question\":\"What document elements cover the automatic power transfer switch field connections?\",\"answer\":\"The sheet includes field connection references for the automatic power transfer switch and wiring schematic notes for a 3-phase system, including status/terminal references like engine start contacts and transfer switch positions.\"},{\"question\":\"Which NFPA 20 pump room requirements are stated in the document?\",\"answer\":\"It specifies heating above 40°F/5°C when required, neutral-position artificial lighting, emergency lighting requirements per NFPA 101, ventilation provisions, drainage pitch and floor drain discharge location, and coupling/shaft guard requirements.\"},{\"question\":\"How are fire pump selection criteria and sprinkler system parameters provided?\",\"answer\":\"The document lists selection criteria referencing NFPA 13 (extra hazard group 2), sprinkler operation area, water density, and total water demand, and it states pump capacity and firewater tank capacity for one-hour operation.\"}]","USACE - OMAN Fire Pump Control Panels - Field Connections | PDF",15]