[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-662802-105":59,"doc-detail-662802-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","update-pids-for-standard-operating-procedures-sops-and-safety-isolations-rev-00","Update P&IDs for Standard Operating Procedures (SOPs) and Safety Isolations - Rev 00","","Procedure for updating piping and instrument diagrams (P&IDs) used in Kennecott Utah Copper smelter standard operating procedures (SOPs) and safety isolations. Defines purpose, scope, responsibilities, and how P&IDs support health, safety, and environmental compliance by remaining accurate and current as equipment and processes change. Includes requirements to review Management of Change (MOC) status, generate and approve an MOC when needed, and references process safety management and P&ID documentation guidance. Outlines related SOPs, abbreviations, and key reference documents for consistent updates.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":35,"@type":76,"position":81},"https://docshare.wps.com/document/healthcare/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/update-pids-for-standard-operating-procedures-sops-and-safety-isolations-rev-00/662802/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/update-pids-for-standard-operating-procedures-sops-and-safety-isolations-rev-00/662802.png","ImageObject",300,407,{"name":92,"@type":93},"Eliana","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-29","2026-10-28",true,{"@type":102,"interactionType":103,"userInteractionCount":14},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What is the purpose of this procedure?","Question",{"text":112,"@type":113},"It instructs how to update piping and instrument diagrams (P&IDs) for SOPs and safety isolations.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"When is an MOC required before updating a revised P&ID?",{"text":117,"@type":113},"If the change has not already been accounted for in an existing Management of Change (MOC), an MOC must be generated and approved before entering the revised P&ID into Documentum.",{"name":119,"@type":110,"acceptedAnswer":120},"What does the procedure describe in the process overview?",{"text":121,"@type":113},"It explains what P&IDs are, why they are controlled documents, and that P&IDs must be surveyed and marked up to revise or update them to reflect current equipment arrangements.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},662802,1793222514,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":34,"category_name":35,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":14,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":44,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":143},4398048949847,"https://ap-avatar.wpscdn.com/avatar/400002536579ef2da7f?_k=1778318612642679267","KENNECOTT UTAH COPPER CORPORATION  \n\n| \u003Cbr>STANDARD OPERATING PROCEDURE\u003Cbr>Update P&IDs for Standard Operating Procedures (SOPs) and Safety Isolations |  |  |\n| --- | --- | --- |\n| Effective Date: 11/29/07 | Document Number: SMSOP500-0025 | Rev: 00 |\n\nPURPOSE:  \nThe purpose of this procedure is to provide instruction on how to update piping and instrument diagrams (P&IDs) for SOPs and safety isolations.  \nThis procedure is part of the Critical Linkages Training and Management System series of standard operating procedures used to identify, produce, analyze, review, revise, and control critical safety documents.  \nThese related procedures are listed in the “Additional SOPs” section of this document on page 3. The example of an internal inspection of a reactor tank is used throughout this series to illustrate how a specific work task can require critical safety documents.  \nSCOPE:  \nKennecott Utah Copper – Smelter  \nRESPONSIBILITY:  \nOperations: Smelter Standard Operating Procedure and Safety Isolation Writers  \nHEALTH & SAFETY:  \nP&IDs are used, with certain KUCC Health and Safety Standards, to describe equipment and processes for procedures that are safe and current. These standards can be found on the KUCC intranet.  \nReview KUCC Standard No. 14.3, Management of Change (MOC) to see how this standard is applicable to the change you are going to make to the P&ID. Review the MOC files to see if this change has already been accounted for and approved. If this change has not been accounted for in an existing MOC, an MOC must be generated and approved before the revised P&ID can be entered into Documentum .  \nSee 29 CFR 1910.119(d) for P&IDs that are used for conducting process hazard analyses on equipment and processes that are governed by OSHA's Process Safety Management (PSM) standard.  \nENVIRONMENTAL:  \nP&IDs are used to describe systems that are used to achieve compliance with certain KUCC environmental standards, practices, and policies.  \n\n| Page 1 of 9 | Plant: Smelter |\n| --- | --- |\n| PRINTED COPIES ARE UNCONTROLLED |  |\n\nKUC00011.00  \nKENNECOTT UTAH COPPER CORPORATION  \n\n| \u003Cbr>STANDARD OPERATING PROCEDURE\u003Cbr>Update P&IDs for Standard Operating Procedures (SOPs) and Safety Isolations |  |  |\n| --- | --- | --- |\n| Effective Date: 11/29/07 | Document Number: SMSOP500-0025 | Rev: 00 |\n\nDEFINITIONS & ABBREVIATIONS:  \nAG-Agitator  \nCFR-Code of Federal Regulations  \n-CV-Conveyor HV-Hand valve  \n-M Motor (electric)  \nMOC – Management of Change  \nOSHA-Occupational Safety and Health Administration P&IDs – Piping and Instrument Diagrams  \n-PP-Pump  \n-PRW-Process Water  \n-RE-Reactor  \n-SLA-Acidic Slurry  \nSOP – Standard Operating Procedure  \nTRACK – acronym for: Think through the Task  \nRecognize the Hazards Assess the Risks Control the Hazards  \nKeep Safety First in all Tasks  \n-VPB-Vent to SO2 Scrubber  \nREFERENCES:  \nP&IDs:  \n500-66-001, P&ID Piping Legend  \n\n| Page 2 of 9 | Plant: Smelter |\n| --- | --- |\n| PRINTED COPIES ARE UNCONTROLLED |  |\n\nKUC00011.00  \nKENNECOTT UTAH COPPER CORPORATION  \n\n| \u003Cbr>STANDARD OPERATING PROCEDURE\u003Cbr>Update P&IDs for Standard Operating Procedures (SOPs) and Safety Isolations |  |  |\n| --- | --- | --- |\n| Effective Date: 11/29/07 | Document Number: SMSOP500-0025 | Rev: 00 |\n\n500-66-002, Instrumentation Legend and Symbols P&ID  \n500-66-301, Hydrometallurgical Plant P&ID Diagram Piping Legend  \n500-66-302, Hydrometallurgical Plant Instrumentation Legend & Symbols P&ID Equipment Number(s): N/A  \nRisk Analysis: Risk ID\\# -N/A  \nIsolation Procedure: N/A  \nJob Safety Analysis Number: N/A  \nAdditional SOPs:  \nSMSOP500-0001, Control and Revision Procedures for SOPs and JSAs  \nNote: This and the following SOPs are part of the Critical Linkages Training  \nand Management System:  \nSMSOP500-0004, Operation & Safety Document Development Overview SMSOP500-0024, Identifying a Task for a Standard Operating Procedure (SOP) SMSOP500-0026, Evaluate and Revise a Standard Operating Procedure (SOP) SMSOP500-0027, Develop","cbCaio1zTdl8x3MU","https://ap.wps.com/l/cbCaio1zTdl8x3MU","pdf",77214,"English","# Purpose\n# Scope and Responsibility\n# Health & Safety\n## MOC requirements\n## Process Safety Management reference\n# Environmental\n# Definitions & Abbreviations\n# References\n# Process Overview\n## What P&IDs are and why they are controlled\n## When to use the procedure","[{\"question\":\"What is the purpose of this procedure?\",\"answer\":\"It instructs how to update piping and instrument diagrams (P\\u0026IDs) for SOPs and safety isolations.\"},{\"question\":\"When is an MOC required before updating a revised P\\u0026ID?\",\"answer\":\"If the change has not already been accounted for in an existing Management of Change (MOC), an MOC must be generated and approved before entering the revised P\\u0026ID into Documentum.\"},{\"question\":\"What does the procedure describe in the process overview?\",\"answer\":\"It explains what P\\u0026IDs are, why they are controlled documents, and that P\\u0026IDs must be surveyed and marked up to revise or update them to reflect current equipment arrangements.\"}]","Update P&IDs for Standard Operating Procedures (SOPs) and Safety Isolations - Rev 00 | PDF",23]