[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-389214-105":3,"detail-sidebar-cat-0-en-105":81,"doc-detail-389214-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","update-on-contractual-dispute-with-marco-polo-legal-and-arbitration-proceedings","Update on Contractual Dispute with Marco Polo - Legal and Arbitration Proceedings","","This formal announcement details the ongoing contractual dispute between Sembcorp Marine's subsidiary, PPL Shipyard Pte Ltd (PPLS), and Marco Polo Drilling (I) Pte Ltd (MPD). Following the failure of MPD to pay a 10% contract disbursement, PPLS initiated termination of the agreement and subsequent legal action in the Singapore High Court. Despite attempts at mediation, the disagreement remains unresolved, leading both parties to initiate formal arbitration proceedings as of April 2016. Sembcorp Marine confirms that this legal matter is not expected to have a material impact on the company's net tangible assets or earnings per share for the fiscal year ending December 31, 2016. The document serves as a status update for stakeholders and investors, highlighting the commitment of Sembcorp Marine to transparent communication regarding legal developments and the protection of its corporate rights throughout these ongoing arbitration processes.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/update-on-contractual-dispute-with-marco-polo-legal-and-arbitration-proceedings/389214/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/update-on-contractual-dispute-with-marco-polo-legal-and-arbitration-proceedings/389214.png","ImageObject",300,407,{"name":42,"@type":43},"Jasmine","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-11-04","2026-09-25",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",6,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"Why did PPL Shipyard terminate its contract with Marco Polo Drilling?","Question",{"text":63,"@type":64},"The contract was terminated because MPD failed to pay the second disbursement of 10% of the contract price, amounting to US$21.43 million, by the November 30, 2015 deadline.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"What is the current status of the dispute between PPLS and MPD?",{"text":68,"@type":64},"Following failed mediation attempts, both parties have served Notices of Arbitration to commence formal arbitration proceedings against each other.",{"name":70,"@type":61,"acceptedAnswer":71},"Will this legal dispute affect Sembcorp Marine’s financial performance in 2016?",{"text":72,"@type":64},"Sembcorp Marine expects that the matter will not have any material impact on its net tangible assets or earnings per share for the financial year ending December 31, 2016.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},389214,1790794002,{"code":4,"msg":82,"data":83},"success",[84,88,92,96,101,105,110,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":89,"show_sort_weight":90,"slug":91},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":93,"show_sort_weight":94,"slug":95},"Exam",70,"exam",{"id":97,"doc_module":4,"doc_module_name":25,"category_name":98,"show_sort_weight":99,"slug":100},5,"Comic",60,"comic",{"id":55,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":107,"show_sort_weight":108,"slug":109},7,"Healthcare",40,"healthcare",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":112,"slug":113},8,30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":97,"slug":129},19,"General","general",{"code":4,"msg":82,"data":131},{"doc_id":79,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":111,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":22,"language":139,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":12,"update_tm":143,"read_time":30,"preview_page_count":22,"preview_urls":144},2336478487870,"https://ap-avatar.wpscdn.com/davatar_085a072bc5b1113ac321206ff7593b45","Company Registration Number: 196300098Z  \nUPDATE ON CONTRACTUAL DISPUTE WITH MARCO POLO  \nSingapore, 7 April 2016: Sembcorp Marine refers to the announcement it made on 1st December 2015 that its subsidiary PPL Shipyard Pte Ltd (“PPLS”) had on 1st December 2015 served a termination notice on Marco Polo Drilling (I) Pte Ltd (“MPD”) terminating the contract after MPD failed to pay the 2nd disbursement of 10% of the contract price (US$21 .43 million) by 30th November 2015 (the “2nd Disbursement”) . PPLS commenced an action in the Singapore High Court on 1st December 2015 against the parent company of MPD, Marco Polo Marine Ltd (“MPM”), the guarantor, for the amounts due under the Contract.  \nFurther to the earlier announcement, PPLS and MPD referred the dispute to their senior management and to mediation but the dispute between the parties remains unresolved. PPLS has on 7th April 2016 served a Notice of Arbitration to commence arbitration proceedings against MPD.  \nSubsequent to PPLS serving the said Notice of Arbitration on MPD, PPLS has also separately received a Notice of Arbitration from MPD and MPM purporting to commence arbitration proceedings against PPLS. All of PPLS’s rights are hereby reserved.  \nSembcorp Marine will make further announcements as and when necessary.  \nThe matter is not expected to have any material impact on the net tangible assets and earnings per share of Sembcorp Marine for the year ending 31st December, 2016.  \nFor more information, please contact  \nAnalysts’ queries: Ms Lisa Lee  \nHead of Investor Relations Tel No: (65) 6262 7107  \nEmail: [lisa.lee@sembmarine.com](lisa.lee@sembmarine.com)  \nMedia queries: Mr David Wong  \nHead of Corporate Communications Tel No: (65) 6262 8036  \nEmail: [david.wong@sembmarine.com](david.wong@sembmarine.com)","cbCaivd9g4zOS4bh","https://ap.wps.com/l/cbCaivd9g4zOS4bh","pdf",66017,"English","# Termination of Contract and Legal Action\n## Commencement of Arbitration Proceedings\n## Financial Impact and Investor Relations","[{\"question\":\"Why did PPL Shipyard terminate its contract with Marco Polo Drilling?\",\"answer\":\"The contract was terminated because MPD failed to pay the second disbursement of 10% of the contract price, amounting to US$21.43 million, by the November 30, 2015 deadline.\"},{\"question\":\"What is the current status of the dispute between PPLS and MPD?\",\"answer\":\"Following failed mediation attempts, both parties have served Notices of Arbitration to commence formal arbitration proceedings against each other.\"},{\"question\":\"Will this legal dispute affect Sembcorp Marine’s financial performance in 2016?\",\"answer\":\"Sembcorp Marine expects that the matter will not have any material impact on its net tangible assets or earnings per share for the financial year ending December 31, 2016.\"}]","Update on Contractual Dispute with Marco Polo - Legal and Arbitration Proceedings | PDF",1790317250,[145],{"page_no":22,"url":146,"width":147,"height":148},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/ff3395de6a815a03a931753999b1374a.webp",983,1390]