[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-649654-105":59,"doc-detail-649654-en":129},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":122,"head_meta":124,"extra_data":126,"updated_unix":128},105,"en","union-pacific-railroad-industrial-track-specifications-last-revised-april-12-2024","Union Pacific Railroad Industrial Track Specifications - Last Revised April 12, 2024","","Union Pacific Railroad industrial track specifications define guidance for planning, design, and construction of rail-served facilities. The preface emphasizes safety compliance and directs users to follow the latest UP General Conditions and Specifications, engineering track maintenance resources, and standard drawings, while using AREMA as a referenced technical practice source. It outlines responsibilities for the industry’s costs and permitting, required contractor and design firm approvals, and third-party plan review workflows, including conditions for submission timing and comment resolution.",{"@graph":69,"@context":121},[70,84,104],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/union-pacific-railroad-industrial-track-specifications-last-revised-april-12-2024/649654/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":98,"encodingFormat":97,"isAccessibleForFree":99,"interactionStatistic":100},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/union-pacific-railroad-industrial-track-specifications-last-revised-april-12-2024/649654.png","ImageObject",300,407,{"name":92,"@type":93},"pixelkiddo","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-24",true,{"@type":101,"interactionType":102,"userInteractionCount":8},"InteractionCounter",{"@type":103},"ViewAction",{"@type":105,"mainEntity":106},"FAQPage",[107,113,117],{"name":108,"@type":109,"acceptedAnswer":110},"What is the purpose of the Industrial Track Specifications document?","Question",{"text":111,"@type":112},"It guides planning, design, and construction procedures for developing rail-served facilities for industry projects on or impacting Union Pacific owned or maintained property.","Answer",{"name":114,"@type":109,"acceptedAnswer":115},"Who is responsible for safety compliance in these projects?",{"text":116,"@type":112},"All parties involved—including employees, industries, customers, contractors, and others—are responsible for complying with safety requirements.",{"name":118,"@type":109,"acceptedAnswer":119},"What happens if an industry’s track design plans were prepared by a design firm not on the approved list?",{"text":120,"@type":112},"The industry must have a design firm from the approved list review and confirm the plans before the industry consultant submits to UP, and the UP-approved firm must include a comment resolution form with the submitted plans.","https://schema.org",{"og:url":83,"og:type":123,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":125,"canonical":83},"index,follow",{"doc_id":127,"site_id":62},649654,1792832682,{"code":4,"msg":5,"data":130},{"doc_id":127,"user_id":131,"nickname":92,"user_avatar":132,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":133,"file_id":134,"file_url":135,"file_type":136,"file_size":137,"view_count":8,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":138,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":143,"read_time":144},962090883892,"https://ap-avatar.wpscdn.com/avatar/e00115db34f3e0f11b?x-image-process=image/resize,m_fixed,w_180,h_180&k=1790152879550218658","UNION PACIFIC RAILROAD  \nINDUSTRIAL TRACK SPECIFICATIONS  \nLAST REVISED: APRIL 12, 2024  \nPREFACE  \nThe following information is provided to help guide you through the planning, design, and construction procedures for developing a rail-served facility. Union Pacific Railroad (UPRR) is committed to working with you to develop the most efficient and cost-effective rail project to meet your transportation needs.  \nSafety is UPRR’s top priority and all parties involved (employees, industries, customers, contractors, and others) are responsible for compliance with all safety requirements. Safety information can be found in Section 4.00.  \nDesign, materials, and methods of construction for all aspects of proposed improvements impacting UPRR owned or maintained property shall be in accordance with the most current edition of the UPRR General Conditions and Specifications , UPRR Engineering Track Maintenance Field Handbook, and UPRR Standard Drawings. This technical manual provides minimum requirements for Industry owned and maintained property and supplements the aforementioned documents as well as the Checklist for Industry Track Submittals and sample plans/exhibits, which are periodically revised. References made to applicable resources throughout this document are not necessarily exhaustive but have been included to assist with project development and construction. It is the responsibility of the user to update and comply with the most current information, which can be found through the following link:  \n[https://www.up.com/customers/ind-dev/operations/specs/track/index.htm](https://www.up.com/customers/ind-dev/operations/specs/track/index.htm)  \nThe American Railway Engineering and Maintenance-of-Way Association (AREMA) is commonly referenced throughout this document. AREMA provides technical information and recommended practices pertaining to the design, construction, and maintenance of railway infrastructure. AREMA resources and publications may be obtained through the following link:  \n[https://www.arema.org/](https://www.arema.org/)  \nThe Industry and all affiliates shall not take advantage of any apparent errors, omissions, or discrepancies encountered. Upon such discovery, the appropriate UPRR representative shall be immediately notified to provide further interpretation, clarification, or remediation to help fulfill intent or application. In all cases, UPRR specifications shall supersede those supplied by the Industry and, at a minimum, where not otherwise specified, all aspects of design and construction shall meet AREMA specifications. The most restrictive provisions shall govern when there are differences encountered.  \nIf you have any questions concerning project development or require further assistance, please contact the appropriate UPRR Network Economic and Industrial Development (NEID) representative. Contact information can be found through the following link:  \n[https://www.up.com/customers/ind-dev/contacts/index.htm](https://www.up.com/customers/ind-dev/contacts/index.htm)  \nUNION PACIFIC RAILROAD  \n1400 Douglas Street Omaha, Nebraska 68179  \nUnion Pacific Railroad Industrial Track Specifications  \nSECTION 1 – INDUSTRIAL TRACK DEVELOPMENT OVERVIEW  \n1.00 PROCEDURES FOR INDUSTRIAL TRACK DEVELOPMENT  \nPrior to engineering and construction, the Industry shall familiarize themselves with UPRR’s NEID process, which may be found through the following link:  \n[https://www.up.com/customers/ind-dev/index.htm](https://www.up.com/customers/ind-dev/index.htm)  \nAll aspects of project improvements, including design and construction, whether completed by UPRR or others, shall be completed at the Industry’s expense. The Industry is responsible for procurement of contractors, engineering design services, materials , permitting, flagging, rights-of-entry, all incidentals, and shall meet all safety, insurance, and all other requirements necessary for the safe and legal execution of work.  \nAll track design, including all grading","cbCaijJ4q3pyBL8o","https://ap.wps.com/l/cbCaijJ4q3pyBL8o","pdf",420914,27,"English","# Preface\n# Section 1 - Industrial Track Development Overview\n## Procedures for Industrial Track Development\n## Third Party Review Example","[{\"question\":\"What is the purpose of the Industrial Track Specifications document?\",\"answer\":\"It guides planning, design, and construction procedures for developing rail-served facilities for industry projects on or impacting Union Pacific owned or maintained property.\"},{\"question\":\"Who is responsible for safety compliance in these projects?\",\"answer\":\"All parties involved—including employees, industries, customers, contractors, and others—are responsible for complying with safety requirements.\"},{\"question\":\"What happens if an industry’s track design plans were prepared by a design firm not on the approved list?\",\"answer\":\"The industry must have a design firm from the approved list review and confirm the plans before the industry consultant submits to UP, and the UP-approved firm must include a comment resolution form with the submitted plans.\"}]","Union Pacific Railroad Industrial Track Specifications - Last Revised April 12, 2024 | PDF",1792803190,68]