[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-664856-105":59,"doc-detail-664856-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","unicefs-extension-project-demolition-plan-water-supply-revision-1","UNICEF's Extension Project - Demolition plan - Water Supply - Revision 1","","Demolition plan for water supply works within UNICEF's Extension Project, presented with key plan and legend notes. Includes general notes covering units, reading typical details with other architectural/civil/service drawings, prohibition of scaling, and contractor responsibilities for setting out, verification, shop drawings submission, line-out confirmation, and ceiling height/material approvals. Drawing revisions are documented with revision date 08-06-2023, and water supply connections to the main at roof are specified, alongside labeled spaces and pipe sizes.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/unicefs-extension-project-demolition-plan-water-supply-revision-1/664856/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/unicefs-extension-project-demolition-plan-water-supply-revision-1/664856.png","ImageObject",300,407,{"name":92,"@type":93},"asda1da","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-29",true,{"@type":102,"interactionType":103,"userInteractionCount":14},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What units and scaling rules apply to the demolition plan drawings?","Question",{"text":112,"@type":113},"All dimensions are in meters and levels in meters unless otherwise noted, and the drawings shall not be scaled—only written dimensions are used.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What responsibilities does the contractor have before and during the work?",{"text":117,"@type":113},"The contractor is responsible for setting out, checking design accuracy, confirming the line-out prior to commencement, and providing shop drawings for all system departments for consultant approval.",{"name":119,"@type":110,"acceptedAnswer":120},"How is the drawing revision information recorded?",{"text":121,"@type":113},"Revision 1 is listed with revision date 08-06-2023, along with fields for revision description, approved seal date, and designed/drawn/checked by TNEC TEAM and IH.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},664856,1793276520,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":14,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":24,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":143},3985747861852,"https://ap-avatar.wpscdn.com/davatar_155a257f0dc6eb9ab79c44ca47cae57d","| \u003Cbr>\u003Cbr>FD\u003Cbr>WC\u003Cbr>WC\u003Cbr>FD\u003Cbr>coffee\u003Cbr>corner\u003Cbr>breakout room\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>store\u003Cbr>kitchen\u003Cbr>cafeteria space\u003Cbr>EXISTING BUILDING\u003Cbr>\u003Cbr>WP ø50 mm U/T\u003Cbr>WP ø50 mm U/T\u003Cbr>WP ø50 mm U/T\u003Cbr>WP ø75 mm U/T\u003Cbr>WP ø75 mm U/T\u003Cbr>SP ø110 mm U/T\u003Cbr>SP ø110 mm U/T\u003Cbr>SP ø110 mm TO EXISTING DP\u003Cbr>WP ø50 mm U/T\u003Cbr>mm U/T\u003Cbr>WP ø75\u003Cbr>WP ø50\u003Cbr>mm DD TO U/T\u003Cbr>SP ø110 mm U/T\u003Cbr>VP ø75 mm U/T TO HL\u003Cbr>VP ø75 mm U/T\u003Cbr>VP ø75 mm HL\u003Cbr>VP ø110 mm TO EXISTING VP | GENERAL NOTES:-\u003Cbr>1-All dimensions are in meters and levels in meters unless otherwise noted. 2-Typical details shall be read in conjunction with the appropriate architectural/civil and service drawings. 3-The drawings shall not be scaled. Only written dimensions shall be used. 4-The contractor is deemed to have check about the exactness of all dimensions and grid lines and should report immediately in writing to the architect by any discrepancies before the\u003Cbr>commencement of any work.\u003Cbr>5-The contractor will be responsible for all setting out. 6-The contractor is deemed to have checked the design. 7-The contractor is to provide shop drawings of all system departments ( Arch,& Mep) for approval by the consultant before commencing any work. 8-The contractor shall confirm the line out of the design prior to the commencement of work. 9-All ceiling levels show the actual ceiling height. 10-All materials and finishes shall be submitted to the supervising office for before installation. 11-All the curtain walls should be with metal rods one for each panel . 12-The contractor is responsible to ensure the required ceiling height is achieved additional hight requirement for steel beams consideration and ducts installation be obtained from the sandwich panel level to br increased wherever required KEY PLAN:- \u003Cbr>\u003Cbr>LEGEND & NOTES:-\u003Cbr>1 Revision 1 08-06-2023 REVISION Revision Description Revision Date\u003Cbr>Client\u003Cbr>Design Consultant\u003Cbr>Project Title:-\u003Cbr>UNICEF's Extension Project\u003Cbr>Drawing Title\u003Cbr>Demolition plan Drainage\u003Cbr>Approved Seal Date 08-06-2023 Designed Drawn Checked TNEC TEAM IH Model File Ref: Scale A3+ Revision No UNICEF'S ROOF EXTINSION 1:100 1\u003Cbr>Drawing No\u003Cbr>UNICEF-TNEC-TD-ID-DWG-A100\u003Cbr>Struc,\u003Cbr>approval\u003Cbr>any shall |\n| --- | --- |\n\nwork station  \nphotocopier  \noffice-3  \noffice-4  \nDCWL  \nDCWL  \nDCWL  \nHWSL  \nDCWL  \nDCWL  \nHWSL  \nDCWL  \nDCWL  \nHWSL  \nDCWL  \nDCWL  \nDCWL  \nHWSL  \nDCWL  \nDCWL  \nø25 mm  \nø25 mm  \nø20 mm  \nø20 mm  \nø20 mm  \nø20 mm  \nø20 mm  \nø25 mm  \nø20 mm  \nø20 mm  \nø25 mm  \nø25 mm  \nø20 mm  \nø20 mm  \nø25 mm  \nø25 mm  \nH/L  \nH/L  \nH/L  \nH/L  \nH/L  \nH/L  \nH/L  \nH/L  \nH/L  \nH/L  \nH/L  \nU/T  \nH/L  \nH/L  \nH/L  \nUP  \nDCWL ø32 mm TO BE CONNECTED TO WATER SUPPLY MAIN AT ROOF  \ncoffee  \ncorner  \nbreakout room  \nstore  \nkitchen  \nDCWL ø25 mm UP cafeteria space  \nDCXLISTø2IN5G BUILmmDUIN/  \nGENERAL NOTES:-  \n1-All dimensions are in meters and levels in meters unless otherwise noted.  \n2-Typical details shall be read in conjunction with the appropriate architectural/civil and service drawings.  \n3-The drawings shall not be scaled. Only written dimensions shall be used.  \n4-The contractor is deemed to have check about the exactness of all dimensions and grid lines and should report immediately in writing to the architect by any  \ndiscrepancies before the commencement of any work.  \n5-The contractor will be responsible for all setting out.  \n6-The contractor is deemed to have checked the design.  \n7-The contractor is to provide shop drawings of all system departments ( Arch, Struc,& Mep) for approval by the consultant before commencing any work.  \n8-The contractor shall confirm the line out of the design prior to the commencement of work.  \n9-All ceiling levels show the actual ceiling height.  \n10-All materials and finishes shall be submitted to the supervising office for approval before installation.  \n11-All the curtain walls should be with metal rods one for each panel .  \n12-The contractor is responsible to ensure the required c","cbCaicodX8R2QEiV","https://ap.wps.com/l/cbCaicodX8R2QEiV","pdf",1051635,"English","# General Notes\n## Revision and Documentation\n# Key Plan and Legend\n## Drawing Information\n# Water Supply Layout References","[{\"question\":\"What units and scaling rules apply to the demolition plan drawings?\",\"answer\":\"All dimensions are in meters and levels in meters unless otherwise noted, and the drawings shall not be scaled—only written dimensions are used.\"},{\"question\":\"What responsibilities does the contractor have before and during the work?\",\"answer\":\"The contractor is responsible for setting out, checking design accuracy, confirming the line-out prior to commencement, and providing shop drawings for all system departments for consultant approval.\"},{\"question\":\"How is the drawing revision information recorded?\",\"answer\":\"Revision 1 is listed with revision date 08-06-2023, along with fields for revision description, approved seal date, and designed/drawn/checked by TNEC TEAM and IH.\"}]","UNICEF's Extension Project - Demolition plan - Water Supply - Revision 1 | PDF",13]