[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-648336-105":59,"doc-detail-648336-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","ufgs-27-41-00-audio-visual-systems-unified-facilities-guide-specifications","UFGS-27 41 00 - AUDIO-VISUAL SYSTEMS - Unified Facilities Guide Specifications","","Unified Facilities Guide Specifications section 27 41 00 establishes general requirements for most audio-visual system projects, clarifying that detailed, project-specific design requirements must be addressed in the system description, equipment list and specifications, and any related drawings. It specifies core administrative and technical areas including references, scope, excluded scope, submittals, cybersecurity, qualifications, bid pricing, shop drawings, and delivery, storage, and handling. It further outlines products and execution requirements such as system description, spare parts, installation standards, mounting and seismic restraint, grounding and shielding, wiring, labeling, remote control programming, testing, commissioning, training, record drawings, O&M manuals, warranty and maintenance, and live support, aligned with UFGS format standards.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/ufgs-27-41-00-audio-visual-systems-unified-facilities-guide-specifications/648336/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/ufgs-27-41-00-audio-visual-systems-unified-facilities-guide-specifications/648336.png","ImageObject",300,407,{"name":92,"@type":93},"EvelynWrites","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-24","2026-10-23",true,{"@type":102,"interactionType":103,"userInteractionCount":14},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What does SECTION 27 41 00 cover for audio-visual projects?","Question",{"text":112,"@type":113},"It provides general requirements for most audio-visual system projects and directs that project-specific design requirements be handled in the system description, equipment list and specifications, and related drawings or supplemental documents.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"Which general topics are addressed in Part 1?",{"text":117,"@type":113},"Part 1 includes references, related documents, scope and excluded scope of work, submittals, cybersecurity, qualifications, bid pricing, shop drawings, status reports and meeting minutes, and delivery/storage/handling.",{"name":119,"@type":110,"acceptedAnswer":120},"What execution activities are included in Part 3?",{"text":121,"@type":113},"Part 3 covers examination, installation standards, mounting/rigging and seismic restraint, grounding and shielding, wiring standards, labeling, remote control system programming, system testing and adjustment, commissioning, training and operation assistance, record drawings, O&M manuals, warranty and maintenance, and live support.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},648336,1792854762,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":14,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":144,"read_time":145},687212989558,"https://ap-avatar.wpscdn.com/davatar_a8503ba1806abce46bf441b54a3ca4cd","************************************************************************** USACE / NAVFAC / AFCEC UFGS-27 41 00 (February 2026)  \nPreparing Activity: NAVFAC Superseding  \nUFGS-27 41 00 (November 2021)  \nUNIFIED FACILITIES GUIDE SPECIFICATIONS  \nReferences are in agreement with UMRL dated July 2026  \n**************************************************************************  \nSECTION TABLE OF CONTENTS  \nDIVISION 27 - COMMUNICATIONS  \nSECTION 27 41 00  \nAUDIO-VISUAL SYSTEMS  \n02/26  \nPART 1 GENERAL  \n1.1 REFERENCES  \n1.2 RELATED DOCUMENTS  \n1.3 SCOPE OF WORK  \n1.4 EXCLUDED SCOPE OF WORK  \n1.5 SUBMITTALS  \n1.6 CYBERSECURITY  \n1.7 QUALIFICATIONS  \n1.7.1 General  \n1.7.2 System Contractor Qualifications  \n1.7.3 Manufacturer Qualifications  \n1.8 BID PRICING  \n1.9 SHOP DRAWINGS  \n1.10 STATUS REPORTS AND MEETING MINUTES  \n1.11 DELIVERY, STORAGE, AND HANDLING  \nPART 2 PRODUCTS  \n2.1 GENERAL  \n2.2 SPARE PARTS  \n2.3 SYSTEM DESCRIPTION  \n2.3.1 Large Conference Room  \n2.4 EQUIPMENT LIST AND SPECIFICATIONS  \nPART 3 EXECUTION  \n3.1 EXAMINATION  \n3.2 GENERAL INSTALLATION STANDARDS  \n3.3 MOUNTING, RIGGING AND SEISMIC RESTRAINT  \n3.4 GROUNDING AND SHIELDING  \n3.5 GENERAL WIRING STANDARDS  \n3.6 LABELING  \n3.7 REMOTE CONTROL SYSTEM PROGRAMMING  \nSECTION 27 41 00 Page 1  \n3.8 SYSTEM TESTING AND ADJUSTMENT  \n3.9 TEST EQUIPMENT  \n3.10 COMMISSIONING  \n3.11 SYSTEM TRAINING AND OPERATION ASSISTANCE 3.12 RECORD DRAWINGS  \n3.13 OPERATION AND MAINTENANCE (O&M) MANUALS  \n3.14 WARRANTY AND MAINTENANCE  \n3.15 LIVE SUPPORT  \n--End of Section Table of Contents--  \nSECTION 27 41 00 Page 2  \n************************************************************************** USACE / NAVFAC / AFCEC UFGS-27 41 00 (February 2026)  \nPreparing Activity: NAVFAC Superseding  \nUFGS-27 41 00 (November 2021)  \nUNIFIED FACILITIES GUIDE SPECIFICATIONS  \nReferences are in agreement with UMRL dated July 2026 **************************************************************************  \nSECTION 27 41 00  \nAUDIO-VISUAL SYSTEMS  \n02/26  \n************************************************************************** Note: This guide specification covers the general  \nrequirements for most audio-visual system projects .  \nThis specification does not cover detailed, project  \nspecific, design requirements . The system designer  \nwill need to address these specific requirements in  \nthe SYSTEM DESCRIPTION and EQUIPMENT LIST AND  \nSPECIFICATIONS paragraphs and on any related  \ndrawings or supplemental documents . An independent  \nsystem designer may be required for this purpose .  \nIn this case, the design process should follow the requirements of ANSI/INFOCOMM 2M-2010 and ANSI/BICSI  \n001 2017, with the lead system designer having a  \nCTS-D certification .  \nAdhere to  UFS 1-300-02 Unified Facilities Guide  \nSpecifications (UFGS) Format Standard when editing  \nthis guide specification or preparing new project  \nspecification sections . Edit this guide  \nspecification for project specific requirements by  \nadding, deleting, or revising text . For bracketed  \nitems, choose applicable item(s) or insert  \nappropriate information .  \nRemove information and requirements not required in  \nrespective project, whether or not brackets are  \npresent .  \nComments, suggestions and recommended changes for  \nthis guide specification are welcome and should be  \nsubmitted as a Criteria Change Request (CCR) .  \n**************************************************************************  \nPART 1 GENERAL  \n1.1 REFERENCES  \n************************************************************************** NOTE: This paragraph is used to list the  \npublications cited in the text of the guide  \nSECTION 27 41 00 Page 3  \nspecification . The publications are referred to in  \nthe text by basic designation only and listed in  \nthis paragraph by organization, designation, date,  \nand title .  \nUse the Reference Wizard's Check Reference feature  \nwhen you add a Reference Identifier (RID) outside of  \nthe Section's Reference Article to a","cbCaijN24Qmacxgc","https://ap.wps.com/l/cbCaijN24Qmacxgc","pdf",72121,26,"English","# SECTION 27 41 00 AUDIO-VISUAL SYSTEMS\n## PART 1 GENERAL\n## PART 2 PRODUCTS\n## PART 3 EXECUTION","[{\"question\":\"What does SECTION 27 41 00 cover for audio-visual projects?\",\"answer\":\"It provides general requirements for most audio-visual system projects and directs that project-specific design requirements be handled in the system description, equipment list and specifications, and related drawings or supplemental documents.\"},{\"question\":\"Which general topics are addressed in Part 1?\",\"answer\":\"Part 1 includes references, related documents, scope and excluded scope of work, submittals, cybersecurity, qualifications, bid pricing, shop drawings, status reports and meeting minutes, and delivery/storage/handling.\"},{\"question\":\"What execution activities are included in Part 3?\",\"answer\":\"Part 3 covers examination, installation standards, mounting/rigging and seismic restraint, grounding and shielding, wiring standards, labeling, remote control system programming, system testing and adjustment, commissioning, training and operation assistance, record drawings, O\\u0026M manuals, warranty and maintenance, and live support.\"}]","UFGS-27 41 00 - AUDIO-VISUAL SYSTEMS - Unified Facilities Guide Specifications | PDF",1792793147,66]