[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-650983-105":3,"detail-sidebar-cat-0-en-105":80,"doc-detail-650983-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","ubc-lot-26-landscape-drawings-issued-for-development-permit-may-29-2023","UBC Lot 26 Landscape Drawings - Issued For Development Permit - May 29, 2023","","Landscape drawing set for UBC Lot 26, issued for a Development Permit. Includes a drawing list covering cover page, general notes, illustrative/materials and layout/grading plans, planting schedule and plans, lighting plan, landscape sections, and paving, site furnishing, steps/walls, and planting details. Material plan notes specify standards and irrigation requirements, while layout, grading, and utility coordination notes define dimensional conventions, cross-slope limits, and contractor responsibilities. General notes address survey-based existing conditions, no-scaling rules, verification of dimensions/underground utilities, tree protection, and submission timing for “not for construction” review.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/ubc-lot-26-landscape-drawings-issued-for-development-permit-may-29-2023/650983/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/ubc-lot-26-landscape-drawings-issued-for-development-permit-may-29-2023/650983.png","ImageObject",300,407,{"name":42,"@type":43},"Quinn Holloway","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-29","2026-10-24",true,{"@type":52,"interactionType":53,"userInteractionCount":30},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"What documents and plan types are included in the UBC Lot 26 landscape drawing set?","Question",{"text":62,"@type":63},"The drawing list includes cover page, general notes, illustrative plan, materials/layout and grading plan, planting schedule and planting plan, lighting plan, landscape sections, plus paving, site furnishing, steps and walls, and planting details.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"What are the key contractor requirements mentioned in the general notes?",{"text":67,"@type":63},"The contractor must examine existing site surface conditions and topography, follow “do not scale drawings” rules, verify dimensions and notify the landscape architect of discrepancies, establish the limit of work line, and verify underground utilities with necessary precautions.",{"name":69,"@type":60,"acceptedAnswer":70},"What do the planting and irrigation notes require?",{"text":71,"@type":63},"Plant material must meet specified landscape standards, onsite planted areas require automatic irrigation, and utility trenching must be coordinated to protect safe root zones of retained trees.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},650983,1793136959,{"code":4,"msg":81,"data":82},"success",[83,87,91,95,100,105,110,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":84,"show_sort_weight":85,"slug":86},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":88,"show_sort_weight":89,"slug":90},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":92,"show_sort_weight":93,"slug":94},"Exam",70,"exam",{"id":96,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},5,"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},6,"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":107,"show_sort_weight":108,"slug":109},7,"Healthcare",40,"healthcare",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":112,"slug":113},8,30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":96,"slug":129},19,"General","general",{"code":4,"msg":81,"data":131},{"doc_id":78,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":111,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":30,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":139,"language":140,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":12,"update_tm":144,"read_time":145},2336474466712,"https://ap-avatar.wpscdn.com/davatar_a8503ba1806abce46bf441b54a3ca4cd","# UBC Lot 26 Landscape Drawings\n\nIssued For Development Permit -May 29,2023  \nDRAWING LIST  \nLandscape  \nL0.00-Cover Page  \nL0.01-General Notes  \nL1.00-Illustrative Plan  \nL1.01-Materials,Layout and Grading Plan  \nL4.00-Planting Schedule  \nL4.01-Planting Plan  \nL6.01-Lighting Plan  \nL7.01-Landscape Sections  \nL7.02-Landscape Sections  \nL7.03-Landscape Sections  \n\n| May 29/2023  \u003Cbr>Issued for DP  \u003Cbr>Date  \u003Cbr>Description   |  |\n| --- | --- |\n|  |  |\n|  |  |\n| written consent of the landscape architect.   |  |\n|  |  |\n| UBC Lot 26   |  |\n|  |  |\n| Cover Page   |  |\n|  |  |\n|  |  |\n|  |  |\n| L0.00   |  |\n| Drawn|Checked JY|ss   |  |\n\nL8.01-Paving Details  \nL8.02-Site Furnishing Details  \nL8.03-Steps and Walls  \nL8.04 -Planting Details  \nVdVH  \nCO7LABORAV  \nu gog t5o  \n403-375 West Fifth Avenue  \nVancouver BC,V5Y 1J6  \ngrcnteture  \n   \n1.EXISTING SURVEY INFORMATION IS BASED ON THE FOLLOWING DRAWINGS:L0.02 TREE MANAGEMENTPLAN SUPPLIED BY DIAMOND HEAD CONSULTING LTD.(DHC).  \n2.PRIOR TO COMMENCEMENT OF CONSTRUCTION,THE CONTRACTOR MUST MAKE CAREFUL EXAMINATION0F EXISTING SITE SURFACE CONDITIONS AND TOPOGRAPHY AND ADVISE LANDSCAPE ARCHITECT OF ANYUNSATISFACTORY SITE SURFACE CONDITIONS AND TOPOGRAPHY.NO ALLOWANCES WILL BE MADELATER FOR ANY EXPENSES INCURRED THROUGH FAILURE TO NOTE UNSATISFACTORY SITE SURFACECONDITIONS AND TOPOGRAPHY;  \n3.DO NOT SCALE DRAWINGS.USE DIMENSIONAL INFO AS NOTED IN DRAWINGS.CONTACT THE  \nLANDSCAPE ARCHITECT IF THERE IS ANY AMBIGUITY,LACK OF INFORMATION,OR INCONSISTENCY;  \n4.  THE CONTRACTOR WILL CLEAN AND REINSTATE ALL AREAS DAMAGED OR AFFECTED BY WORKS OUTSIDETHE LIMIT OF WORK TO THE CONDITIONS THAT EXISTED PRIOR TO CONSTRUCTION OR BETTER AND TOTHE SATISFACTION OF THE LANDSCAPE ARCHITECT;  \n5.THE CONTRACTOR SHALL VERIFY DIMENSIONS SHOWN ON DRAWINGS AND NOTIFY THE LANDSCAPEARCHITECT OF ANY DISCREPANCIES OR INCONSISTENCIES PRIOR TO CONSTRUCTION;  \n6.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ESTABLISHING THE LIMIT OF WORK LINE;  \n7.CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING ALL UNDERGROUND UTLITIES AND TAKING THENECESSARY PRECAUTIONS PRIOR TO AND DURING CONSTRUCTION.REFER TO CIVIL;  \n## MATERIALS PLAN NOTES\n\n   \n1.REFER TO DETAILS AND SECTIONS FOR ALL LANDSCAPE IMPROVEMENTS;  \n2.TRENCHING FOR UTLITY CONNECTIONS TO BE COORDINATED WITH THE CITY OF VANCOUVERENGINEERING DEPARTMENT TO ENSURE SAFE ROOT ZONES OF RETAINED TREES.  \n## LAYOUT PLAN NOTES\n\n   \n1.ALL DIMENSIONS ARE NOMINAL;  \n2.CONTRACTOR TO LAYOUT AND CLEARLY MARK ALL ELEMENTS FOR LANDSCAPE ARCHITECT REVIEWPRIOR TO SETTING FORMS OR INSTALLING PAVING.CONTRACT LANDSCAPE ARCHITECT 48 HOURS PRIOR.  \n## GRADING PLAN NOTES\n\n   \n1.ALL ELEVATIONS ARE NOMINAL AND ARE BASED ON SURVEY AND ELEVATIONS PROVIDED BY CITY OFLANGLEY.CONTRACTOR TO VERIFY ALL MEASUREMENTS;  \n2.ALL PROPOSED ELEVATIONS ARE TO TOP OF FINISHED GRADE UNLESS NOTED OTHERWISE;  \n3.MAX 2%CROSS-SLOPE FOR ALL WALKS AND PAVING AREAS;  \n4.ALL UTILITY COVERS INSIDE LANDSCAPE AREA TO BE ADJUSTED TO FINAL GRADE;  \n5.CONDUCT GRADING START UP MEETING WITH LANDSCAPE ARCHITECT IN FIELD TO CONFIRM GRADINGDESIGN.  \n## PLANTING PLAN NOTES\n\n   \n1.ALL PLANT MATERIAL TO CLNA STANDARDS.REFER TO THE BCSLA LANDSCAPE STANDARD,LATEST EDITION;  \n2.AREA OF SEARCH FOR PLANT MATERIAL:PACIFIC NORTHWEST INCLUDING BRITISH COLUMBIA,WASHINGTON AND OREGON;  \n3.REFER TO SPECIFICATION FOR GENERAL CONDITIONS,MATERIALS AND INSTALLATIONREQUIREMENTS;  \n4.ALL ONSITE PLANTED AREAS TO HAVE AUTOMATIC IRRIGATION;  \n5.TRENCHING FOR UTILITY CONNECTIONS TO BE COORDINATED WITH ENGINEERINGDEPARTMENT TO ENSURE SAGE ROOT ZONES OF RETAINED TREES.TREE PROTECTION FORSTREET TREES TO BE PROVIDED AS PER ENGINEERING/PARK BOARD GUIDELINES;  \n6.THIS PLAN IS\"NOT FOR CONSTRUCTION\"AND IS TO BE SUBMITTED FOR REVIEW TOENGINEERING SERVICES A MINIMUM OF 8 WEEKS PRIOR TO THE START OF ANYCONSTRUCTION PROPOSED FOR PUBLIC PROPERTY.NO WORK ON PUBLIC PROPERTY MAYBEGIN UNTIL SUCH PLAN RECEIVE \"FOR CONSTRUCTION\"APPROVAL AND RELATED PERMITSARE ISSUED.PLEASE CONTACTENGINEER","cbCaiejswnjARc40","https://ap.wps.com/l/cbCaiejswnjARc40","pdf",18362455,14,"English","# DRAWING LIST\n## Landscape\n## MATERIALS PLAN NOTES\n## LAYOUT PLAN NOTES\n## GRADING PLAN NOTES\n## PLANTING PLAN NOTES\n## LIGHTING PLAN NOTES\n## LANDSCAPE ARCHITECTURE ABBREVIATIONS","[{\"question\":\"What documents and plan types are included in the UBC Lot 26 landscape drawing set?\",\"answer\":\"The drawing list includes cover page, general notes, illustrative plan, materials/layout and grading plan, planting schedule and planting plan, lighting plan, landscape sections, plus paving, site furnishing, steps and walls, and planting details.\"},{\"question\":\"What are the key contractor requirements mentioned in the general notes?\",\"answer\":\"The contractor must examine existing site surface conditions and topography, follow “do not scale drawings” rules, verify dimensions and notify the landscape architect of discrepancies, establish the limit of work line, and verify underground utilities with necessary precautions.\"},{\"question\":\"What do the planting and irrigation notes require?\",\"answer\":\"Plant material must meet specified landscape standards, onsite planted areas require automatic irrigation, and utility trenching must be coordinated to protect safe root zones of retained trees.\"}]","UBC Lot 26 Landscape Drawings - Issued For Development Permit - May 29, 2023 | PDF",1792855856,35]