[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-663030-105":59,"doc-detail-663030-en":129},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":122,"head_meta":124,"extra_data":126,"updated_unix":128},105,"en","typical-asphalt-pavement-details-at-curb-and-gutter-installation-rc-240-1","Typical Asphalt Pavement Details at Curb and Gutter Installation - RC-240-1","","This technical document provides standardized construction specifications for asphalt pavement installations adjacent to curbs and gutters, including requirements for the City of Bellevue. It details the composition of pavement layers, specifying a 2-inch HMA Class 1/2 PG 64-22 wearing course overlying two 4-inch lifts of HMA Class 1/2 or Class 1 PG 64-22 base layers. The document outlines essential structural requirements such as 4-inch compacted CSBC and CSTC layers, specific sidewalk dimensions, and mandatory installation methods. Key engineering notes emphasize that compaction must be performed exclusively by rollers rather than plate compactors to ensure structural integrity. Furthermore, it addresses alternative configurations for installations adjacent to planter strips or NDP features, providing the necessary cross-sectional dimensions for these civil engineering applications. The specifications ensure consistent pavement quality and long-term durability in municipal infrastructure projects.",{"@graph":69,"@context":121},[70,84,104],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":57,"@type":76,"position":81},"https://docshare.wps.com/document/general/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/typical-asphalt-pavement-details-at-curb-and-gutter-installation-rc-240-1/663030/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":98,"encodingFormat":97,"isAccessibleForFree":99,"interactionStatistic":100},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/typical-asphalt-pavement-details-at-curb-and-gutter-installation-rc-240-1/663030.png","ImageObject",300,407,{"name":92,"@type":93},"eBook King","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-28",true,{"@type":101,"interactionType":102,"userInteractionCount":4},"InteractionCounter",{"@type":103},"ViewAction",{"@type":105,"mainEntity":106},"FAQPage",[107,113,117],{"name":108,"@type":109,"acceptedAnswer":110},"What type of compaction is required for the asphalt installation?","Question",{"text":111,"@type":112},"No plate compaction is allowed; all compaction must be performed by a roller only.","Answer",{"name":114,"@type":109,"acceptedAnswer":115},"What are the asphalt pavement composition requirements?",{"text":116,"@type":112},"The pavement consists of a 2-inch HMA Class 1/2 PG 64-22 wearing course over two 4-inch lifts of HMA Class 1/2 or Class 1 PG 64-22.",{"name":118,"@type":109,"acceptedAnswer":119},"Can the width of the sawcut be modified during installation?",{"text":120,"@type":112},"Yes, the width of the sawcut from the gutter line or curb face may be increased at the discretion of the project engineer.","https://schema.org",{"og:url":83,"og:type":123,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":125,"canonical":83},"index,follow",{"doc_id":127,"site_id":62},663030,1793224689,{"code":4,"msg":5,"data":130},{"doc_id":127,"user_id":131,"nickname":92,"user_avatar":132,"doc_module":4,"category_id":56,"category_name":57,"doc_title":65,"doc_description":67,"doc_content":133,"file_id":134,"file_url":135,"file_type":136,"file_size":137,"view_count":4,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":8,"language":138,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":139,"faqs":140,"seo_title":141,"seo_description":67,"update_tm":128,"read_time":14},962088006270,"https://ap-avatar.wpscdn.com/davatar_085a072bc5b1113ac321206ff7593b45","# STD.DWGSW-100-1TYPICAL ASPHALT PAVEMENT DETAIL AT CURB/GUTTER INSTALLATIONNTS\n\n4”HMA CLASS Y”ORCLASS 1”PG 64-22NOTES:  \n1.NO PLATE COMPACTION ALLOWED.COMPACTION BY ROLLER ONLY.  \n2.WIDTH OF SAWCUT FROM GUTTER LINEOR CURB FACE MAY BE INCREASEDAT THE DISCRETION OF THE ENGINEER.ALTERNATE ASPHALT PAVEMENT DETAIL FOR CURB/GUTTER ADJACENTTO PLANTER STRIP OR NDP FEATURENTS  \n\n| City of  \u003Cbr>Bellevue   | TYPICAL ASPHALT PAVEMENT DETAILS AT  \u003Cbr>CURB AND GUTTER INSTALLATION   | DRAWING NUMBER   | RC-240-1   |\n| --- | --- | --- | --- |\n|  |  | SCALE   | NONE   |\n|  |  | REVSION DATE   | 12/16   |\n|  |  | DEPARTMENT   | TRANS   |","cbCaiutQ4BfiT5DD","https://ap.wps.com/l/cbCaiutQ4BfiT5DD","pdf",65564,"English","# Pavement and Gutter Installation Specifications\n## Standard Pavement Details\n## Alternative Pavement Configurations\n## Construction Notes","[{\"question\":\"What type of compaction is required for the asphalt installation?\",\"answer\":\"No plate compaction is allowed; all compaction must be performed by a roller only.\"},{\"question\":\"What are the asphalt pavement composition requirements?\",\"answer\":\"The pavement consists of a 2-inch HMA Class 1/2 PG 64-22 wearing course over two 4-inch lifts of HMA Class 1/2 or Class 1 PG 64-22.\"},{\"question\":\"Can the width of the sawcut be modified during installation?\",\"answer\":\"Yes, the width of the sawcut from the gutter line or curb face may be increased at the discretion of the project engineer.\"}]","Typical Asphalt Pavement Details at Curb and Gutter Installation - RC-240-1 | PDF"]