[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-662181-105":59,"doc-detail-662181-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","two-post-lift-model-bp-9-manual-product-features-and-specifications","TWO POST LIFT Model BP-9 - Manual - Product Features and Specifications","","Technical manual for a TWO POST LIFT Model BP-9 chain-drive system, providing product features, key specifications, and installation guidance. Details include compact floor-plate design, dual hydraulic cylinders, safety release and dual safety design, arm configuration, and performance parameters such as lifting capacity, time, heights, dimensions, and motor power. Installation sections specify required tools, equipment storage and handling, concrete and power supply requirements, and step-by-step assembly and positioning checks.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":30,"@type":76,"position":81},"https://docshare.wps.com/document/technology/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/two-post-lift-model-bp-9-manual-product-features-and-specifications/662181/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/two-post-lift-model-bp-9-manual-product-features-and-specifications/662181.png","ImageObject",300,407,{"name":92,"@type":93},"Fans","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-29","2026-10-28",true,{"@type":102,"interactionType":103,"userInteractionCount":19},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What are the main features of the BP-9 two post lift?","Question",{"text":112,"@type":113},"The BP-9 uses a compact floor-plate chain-drive design with dual hydraulic cylinders, self-lubricating UHMW polyethylene sliders and bronze bushings, and a single-point safety release with dual safety design. It also includes a four three-stage arm structure with stackable rubber pads.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What installation tools are required for BP-9?",{"text":117,"@type":113},"The manual lists a rotary hammer drill (Φ19), hammer, level bar, English spanner, ratchet spanner with socket, wrench set, carpenter’s chalk, screw sets, tape measure, pliers, socket head wrench, and lock wrench.",{"name":119,"@type":110,"acceptedAnswer":120},"What concrete and power requirements must be met before installation?",{"text":121,"@type":113},"Concrete must have a 4-inch minimum thickness without reinforcing steel bars, be completely dried before installation, and meet at least 3,000 psi (210 kg/cm²) test strength with level floors and no cracks. The power supply must be at least 2.0 HP, with a 12AWG cable in good condition and properly contacting the floor.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},662181,1793205992,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":29,"category_name":30,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":19,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":129,"read_time":144},5909892330395,"https://ap-avatar.wpscdn.com/davatar_6f874abed73319feea01a86fa6f0fab8","TWO POST LIFT Model:BP-9  \nCONTENTS  \nProduct Features and Specifications............................................... 1  \nInstallation Requirement ……………………………………………………………………..3  \nStep of Installation……………………………………………………………………………...5  \nExploded View .......................................................................... 17  \nTest Run ..................................................................................24  \nOperation Instruction ................................................................26  \nMaintenance ........................................................................... 27  \nTrouble Shooting ..................................................................... 28  \nLift Disposal ......................................................................................28  \nI . PRODUCT FEATURES AND SPECIFICATIONS FLOORPLATE CHAIN-DRIVE MODEL FEATURES Model BP-9 (See Fig. 1 )  \n. Compact Floor-plate design, provide unobstructed floor space  \n· Dual hydraulic cylinders is designed and manufactured according to standard, utilizing imported seals  \n· Self- lubricating UHMW Polyethylene sliders and bronze bush  \n· Single-point safety release, and dual safety design  \n· 4 three-stage arms design with stackable rubber pads.  \nFig. 1  \nMODEL BP-9 SPECIFICATIONS  \n\n| Model | Style | Lifting\u003Cbr>Capacity | Lifting\u003Cbr>Time | Lifting Height | Overall\u003Cbr>Height | Overall\u003Cbr>Width | Minimum\u003Cbr>Pad Height | Motor |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- |\n| BP-9 | Floor-plate\u003Cbr>Chain-drived | 9,000lbs | 37S | 72”~76” | 108” | 131-7/8 ’’ | 3-9/16’’ | 2.0 HP |\n\nArm Swings View  \n26-3/4”  \n26-3/4”  \n45-7/8”  \n99\"  \n45-7/8”  \nFig.2  \nII . INSTALLATION REQUIREMENT  \nA . TOOLS REQUIRED  \n􀀹  \n􀀹  \n􀀹  \nRotary Hammer Drill (Φ 19)  \nHammer  \nLevel Bar  \n􀀹 English Spanner (12\" )  \n􀀹 Ratchet Spanner With Socket (28\\# )  \n􀀳  \nWrench set  \n(10\\#, 13\\#, 14\\#, 15\\#, 17\\#, 19\\#, 24\\#, 27\\# )  \n􀀹 Carpenter’s Chalk  \n􀀹 Screw Sets  \n􀀹 Tape Measure (7 .5 m)  \n􀀹 Pliers  \n􀀹 Socket Head Wrench (6\\# )  \n􀀳 Lock Wrench  \nFig. 3  \nB . Equipment storage and installation requirements .  \nThe equipment should be stored or installed in a shady, normal temperature, ventilated and dry place .  \nC . The equipment should be unload and transfer by forklift .  \nD. SPECIFICATIONS OF CONCRETE (See Fig. 5 ) .  \nSpecifications of concrete must be adhered to the specification as following . Failure to do so may result in lift and/or vehicle falling .  \n1. Concrete must be thickness 4” minimum and without reinforcing steel bars, and must be dried completely before the installation.  \n2. Concrete must be in good condition and must be of test strength 3,000psi (210kg/cm²) minimum.  \n3. Floors must be level and no cracks.  \n63  \n4”  \nConcrete intensity must be 3000psi (210kg/cm²) minimum  \nFig. 5  \nE. POWER SUPPLY  \nThe electrical source must be 2 .0HP minimum. The source cable size must be 12AWG and in good condition of contacting with floor.  \nIII. STEPS OF INSTALLATION  \nA . Location of Installation  \nCheck and insure the installation location (concrete, layout, space size etc.) is suitable for lift installation.  \nB. Use a carpenter’s chalk line to establish installation layout of base-plate (See Fig. 6) .  \n10-1/8” 6-Φ7/8”  \n5” 6” 5”  \nChalk line  \n131-7/8”  \nFig. 6  \nC . Check the parts before assembly .  \n1. Packaged lift and hydraulic power unit (See Fig. 7 ) .  \n2. Move the lift aside with fork lift or hoist, and open the outer packing carefully, take off the parts from upper and inside the column, take out the parts box, check the parts according to the shipment parts list(See Fig. 8)  \nShipment Parts list Floor cover Fig. 8 Parts box  \n3. Loosen the screws of t he upper package stand, take off the upper column and remove the package stand.  \n4. Move aside the parts and check the parts according to the shipment parts list. (See Fig. 9, Fig. 10) .  \n75  \nFig.9  \nFig. 10  \nParts in the parts box (75)  \n5. Open the carton of parts and check th","cbCail92C8iEpWY0","https://ap.wps.com/l/cbCail92C8iEpWY0","pdf",904356,31,"English","# Product Features and Specifications\n## Model BP-9 Specifications\n# Installation Requirement\n## Tools Required\n## Concrete Specifications\n## Power Supply\n# Step of Installation\n## Location of Installation\n## Check the Parts Before Assembly\n## Positioning Columns and Fixing Anchor Bolts\n# Exploded View\n# Test Run\n# Operation Instruction\n# Maintenance\n# Trouble Shooting\n# Lift Disposal","[{\"question\":\"What are the main features of the BP-9 two post lift?\",\"answer\":\"The BP-9 uses a compact floor-plate chain-drive design with dual hydraulic cylinders, self-lubricating UHMW polyethylene sliders and bronze bushings, and a single-point safety release with dual safety design. It also includes a four three-stage arm structure with stackable rubber pads.\"},{\"question\":\"What installation tools are required for BP-9?\",\"answer\":\"The manual lists a rotary hammer drill (Φ19), hammer, level bar, English spanner, ratchet spanner with socket, wrench set, carpenter’s chalk, screw sets, tape measure, pliers, socket head wrench, and lock wrench.\"},{\"question\":\"What concrete and power requirements must be met before installation?\",\"answer\":\"Concrete must have a 4-inch minimum thickness without reinforcing steel bars, be completely dried before installation, and meet at least 3,000 psi (210 kg/cm²) test strength with level floors and no cracks. The power supply must be at least 2.0 HP, with a 12AWG cable in good condition and properly contacting the floor.\"}]","TWO POST LIFT Model BP-9 - Manual - Product Features and Specifications | PDF",78]