[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-650942-105":3,"detail-sidebar-cat-0-en-105":81,"doc-detail-650942-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","turnaround-drawings-updated-project-turnaround-drawing-pack","Turnaround - Drawings updated - Project Turnaround: Drawing Pack","","Architectural drawing pack for the “TURNAROUND” project, providing a set of existing and proposed survey-based drawings. Includes existing site plan, ground floor and floor finishes plans, north/south elevation, west/east elevation and section drawings, alongside proposed landscape plan and proposed alterations covering demolition and new floor finishes. Also includes updates for new toilet provision, new fittings such as server and book stall elements, and welcome/AV desk provision, with revision notes and metadata including scale and drawing references.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/turnaround-drawings-updated-project-turnaround-drawing-pack/650942/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/turnaround-drawings-updated-project-turnaround-drawing-pack/650942.png","ImageObject",300,407,{"name":42,"@type":43},"putri.kecil17","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-29","2026-10-24",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",5,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What types of drawings are included in the turnaround drawing pack?","Question",{"text":63,"@type":64},"The pack includes existing drawings (site plan, floor plans, elevations, and sections) and proposed drawings (landscape, demolition, new plans and finishes, elevations, and GA sections).","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"Which key proposed interior works are documented?",{"text":68,"@type":64},"It documents new toilet provision and multiple new fittings, including server-related elements and book stall/storage with benches, plus welcome and AV desk provision.",{"name":70,"@type":61,"acceptedAnswer":71},"What basis and constraints are stated for the drawings?",{"text":72,"@type":64},"Notes specify the drawings are based on a dimensional survey and indicate which drawings are shown for construction status, along with instructions about not scaling from the drawing and using fitted dimensions.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},650942,1792875943,{"code":4,"msg":82,"data":83},"success",[84,88,92,96,100,105,110,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":89,"show_sort_weight":90,"slug":91},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":93,"show_sort_weight":94,"slug":95},"Exam",70,"exam",{"id":55,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},6,"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":107,"show_sort_weight":108,"slug":109},7,"Healthcare",40,"healthcare",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":112,"slug":113},8,30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":55,"slug":129},19,"General","general",{"code":4,"msg":82,"data":131},{"doc_id":79,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":111,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":139,"language":140,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":12,"update_tm":144,"read_time":145},962094509873,"https://ap-avatar.wpscdn.com/davatar_3d24733baf745e90a7e4bdd5f77d97b2","## EXISTING DRAWINGS\n\n1640-BFF-ZZ-00-DR-A-0005_P02  \n1640-BFF-ZZ-00-DR-A-0010_P02  \n1640-BFF-ZZ-00-DR-A-0011_POI  \n1640-BFF-ZZ-ZZ-DR-A-0400_PO1  \n1640-BFF-ZZ-ZZ-DR-A-0503_POI  \nPROPOSED DRAWINGS  \n1640-BFF-ZZ-00-DR-A-0200_P04  \n1640-BFF-ZZ-00-DR-A-0205_P05  \n1640-BFF-ZZ-00-DR-A-0210_P05  \n1640-BFF-ZZ-00-DR-A-021I_P05  \n1640-BFF-ZZ-00-DR-A-0225_POI  \n1640-BFF-ZZ-ZZ-DR-A-0417_POI  \n1640-BFF-ZZ-ZZ-DR-A-0510_PO2  \n1640-BFF-ZZ-ZZ-DR-A-0511_P02  \n1640-BFF-ZZ-ZZ-DR-A-0512_P02  \n1640-BFF-ZZ-00-DR-A-1600_P02  \n1640-BFF-ZZ-00-DR-A-1601_POI  \n1640-BFF-ZZ-00-DR-A-1602_P03  \n1640-BFF-ZZ-00-DR-A-1610_P02  \n1640-BFF-ZZ-00-DR-A-1611_P03  \nEXISTING SITE PLAN  \nEXISTING GROUND FLOOR PLAN  \nEXISTING FLOOR FINISHES PLAN  \nEXISTING NORTH ELEVATION  \nEXISTING SECTION HH  \nPROPOSED LANDSCAPE PLANGROUND FLOOR DEMOLITIONSPROPOSED GROUND FLOOR PLANPROPOSED FLOOR FINISHES PLANNEW TOILET PROVISIONPROPOSED WEST &EAST ELEVATIONPROPOSED GA SECTIONS AA&BBPROPOSED GA SECTIONS CC&DDPROPOSED GA SECTIONS GG &HHNEVW FITTINGS-SERVERY  \nNEW FITTINGS-BOOK STALL,WELCOME &AV DESKNEW FITTINGS-BOOK STORAGE&BENCHESNORTH ENTRANCE ADAPTATIONSNORTHTRANSEPTADAPTATIONS  \nFaculty Application  \nPROJECTTURNAROUND:DRAWING PACK  \nTHS DRAWING SBASED ON DIMENSIONAL SURVEY  \nтмЕБЯОМяо яємарв тнесорурснт ог  \n| PO2 FACULTYAPLICATION  \u003Cbr>29082024  \u003Cbr>6082024  \u003Cbr>P01 FACULTYAPLICATION   |  |\n| --- | --- |\n|  |  |\n| вулонюрате:   |  |\n| or   |  |\n| РВЕЦММАВУ  \u003Cbr>单50LFoF Ha   |  |\n|  |  |\n| BURRELL|FOLEY|FISCHER   |  |\n| авснтеств амр иввам реэамевз   |  |\n| ;ЦЕЮЗшюЮЛюАевоюоооннтях   |  |\n| mbfadtadml   |  |\n| ---   |  |\n| Sт Аирнесе, sои   | ниш   |\n| бошниш равлбн   |  |\n|  |  |\n| снивсн нш коао, sошниц, вэт  \u003Cbr>зво   |  |\n|  |  |\n|  |  |\n| EXISTING SITEPLA   | N   |\n| APRIL24   | NTS@A3   |\n|  |  |\n| овнег  \u003Cbr>BFF/1640   | Yx  \u003Cbr>XX   |\n| 单w²地1  \u003Cbr>-Рог   |  |\n|  |  |\n| 1640-BF-Z²-0-DR-A-005   |  |\n\nN  \nKEY  \nAltarChapel of St KatherineSacristy and Chapel of St NicholasChapel of St Thomas-a-BecketChapel of St AntonyVestry  \n\n| P02 FACUTYAPPLCATION  \u003Cbr>292082024   |\n| --- |\n| P01 FACLTYAPLICATION  \u003Cbr>16.08.2024   |\n| BYIOIKD:  DATE   |\n| Y orE   |\n| PRELIMINARY  \u003Cbr>ONor sCLE研1HS BOir   |\n|  |\n| BURRELL|FOLEY|FISCHER  \u003Cbr>ARCHITECTS AND URBAN DESIGNERS   |\n|  |\n| irmo co   |\n| mbfacdiedsm   |\n|  |\n| STALPHEGE,SOLIHULL   |\n| SOLIHULL PARISH   |\n|  |\n| CHURCH HILL ROAD,SOLIHULL,B91  \u003Cbr>3RQ   |\n|  |\n| EXISTING GROUND FLOORPLAN   |\n|  |\n| PRnLz  \u003Cbr>1200@A3   |\n|  |\n| xX  \u003Cbr>BFF/1640  \u003Cbr>xX   |\n|  |\n| -P02  \u003Cbr>1640-BFF-ZZ-00-DR-A-0010   |\n| t   |\n\nSt Francis Chapel(lower)&Chapel of St Alphege(upper)8PulpitEagle lectern10Organ11 North entrance12 Choir stalls13 Server stalls14 Wardens'stalls15 Rector's stall16 Font17 Book stall18 Children's Corner  \n| THS DPAWNG IS BASED ON DIMENSIONAL SUPVEY  \u003Cbr>onCPgoorYPo neAoCLEc  \u003Cbr>THs SAMENYG Souin FEAD N OONJUucnON wmH  \u003Cbr>01ECAADSEKEciosF  \u003Cbr>ONLY DRAMNGS SHOWN WITH STATUS DONSTPUCnON  \u003Cbr>DOENGT SCALE ROM THES DRAMING:USE ONLY FGUPED  \u003Cbr>THS DPAMNG PEMANS TE COPRGHT OF  \u003Cbr>BURRELL FOLEY RSCHER LLP  \u003Cbr>P01 FACLTY APPUCATION  \u003Cbr>1608/2024  \u003Cbr>BYICHKD  \u003Cbr>DATE  \u003Cbr>cY MD  \u003Cbr>PRELIMINARY  \u003Cbr>BURRELL|FOLEY FISCHER  \u003Cbr>ARCHITECTSANDURBAN DESIGNERS  \u003Cbr>erm.m.=z  \u003Cbr>m4uadtadm  \u003Cbr>B  \u003Cbr>STALPHEGE,SOLIHULL   |\n| --- |\n| SOLIHULL PARISH   |\n| CHURCH HILL ROAD,SOLIHUL,B91  \u003Cbr>3RQ   |\n| EXISTING NORTHELEVATION   |\n| PAL24  \u003Cbr>1:200@A3  \u003Cbr>xX  \u003Cbr>BFF/1640  \u003Cbr>DMGNo.(eGaG EDGLMLMPER  ETM-V  \u003Cbr>-P01  \u003Cbr>1640-BFF-ZZ-ZZ-DR-A-0400   |\n\nтнЕЫЯОМча ееманз тне ооруяонт ог  \n\n| 16082024  \u003Cbr>P01 FACULTY APPUCATON   |  |\n| --- | --- |\n| EYCHKD DAT   |  |\n| cY:MorE   |  |\n| PRELIMINARY   |  |\n|  |  |\n| BURRELL|FOLEY|FISCHER  \u003Cbr>ARCHITECTSAND URBAN DESIGNERS   |  |\n|  |  |\n| enreo om.Y   |  |\n| falcm   |  |\n| -   |  |\n| STALPHEGE,SOLIHULL   |  |\n| SOLIHULLPARISH   |  |\n|  |  |\n| CHURCH HILLROAD,SOLIHULL,B91  \u003Cbr>3RQ   |  |\n| EXISTING SOUTH ELEVATION   |  |\n|  |  |\n| DATE:  \u003Cbr>APRIL24   | 1-200@A3   |\n|  |  |\n| BFF/1640   | xx  \u003Cbr>xX   ","cbCaibOi4gVE8D4U","https://ap.wps.com/l/cbCaibOi4gVE8D4U","pdf",12157009,28,"English","# EXISTING DRAWINGS\n## PROPOSED DRAWINGS\n## EXISTING SITE PLAN\n## EXISTING GROUND FLOOR PLAN\n## EXISTING FLOOR FINISHES PLAN\n## EXISTING NORTH ELEVATION\n## EXISTING SECTION HH\n## PROPOSED LANDSCAPE PLAN\n## GROUND FLOOR DEMOLITION\n## PROPOSED GROUND FLOOR PLAN\n## PROPOSED FLOOR FINISHES PLAN\n## NEW TOILET PROVISION\n## PROPOSED WEST & EAST ELEVATION\n## PROPOSED GA SECTIONS\n## NEW FITTINGS\n## NORTH ENTRANCE ADAPTATIONS","[{\"question\":\"What types of drawings are included in the turnaround drawing pack?\",\"answer\":\"The pack includes existing drawings (site plan, floor plans, elevations, and sections) and proposed drawings (landscape, demolition, new plans and finishes, elevations, and GA sections).\"},{\"question\":\"Which key proposed interior works are documented?\",\"answer\":\"It documents new toilet provision and multiple new fittings, including server-related elements and book stall/storage with benches, plus welcome and AV desk provision.\"},{\"question\":\"What basis and constraints are stated for the drawings?\",\"answer\":\"Notes specify the drawings are based on a dimensional survey and indicate which drawings are shown for construction status, along with instructions about not scaling from the drawing and using fitted dimensions.\"}]","Turnaround - Drawings updated - Project Turnaround: Drawing Pack | PDF",1792852827,71]