[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-detail-111422-en":3,"doc-seo-111422-105":28,"detail-sidebar-cat-0-en-105":88},{"code":4,"msg":5,"data":6},0,"success",{"doc_id":7,"user_id":8,"nickname":9,"user_avatar":10,"doc_module":4,"category_id":11,"category_name":12,"doc_title":13,"doc_description":14,"doc_content":15,"file_id":16,"file_url":17,"file_type":18,"file_size":19,"view_count":4,"is_deleted":4,"is_public":20,"is_downloadable":20,"audit_status":20,"page_count":20,"language":21,"language_code":22,"site_id":23,"html_lang":22,"table_of_contents":24,"faqs":25,"seo_title":13,"seo_description":14,"update_tm":26,"read_time":27},111422,4398048950312,"Violet","https://ap-avatar.wpscdn.com/avatar/400002538284de19e3c?_k=1778320343897328908",8,"Research & Report","Türkiye Ak Finansal Kiralama A.Ş. (Aklease) - Aklease SSL Project - Absence-of-Objection Basis Approval - April 2, 2026","Approval on an absence-of-objection basis for an investment in Türkiye-Ak Finansal Kiralama A.Ş. (Aklease) under the Aklease SSL Project, dated April 2, 2026. The Board of Directors of IFC approved a senior loan package in Türkiye, with an aggregate amount up to $100 million. The package consists of an A loan up to $60 million for IFC’s own account and a B1 loan up to $40 million from potential participants, capped so combined exposure does not exceed $100 million. Reporting records note a wish to object and a wish to abstain.","Public Disclosure Authorized Public Disclosure Authorized  \nThe following item has been approved on an Absence-of-Objection Basis  \non Thursday, April 2, 2026  \nTürkiye  \nInvestment in  \nAk Finansal Kiralama A.Ş. (Aklease)  \nfor the Aklease SSL Project  \nThe Board of Directors ofIFC approved an investment in Türkiye-Ak Finansal Kiralama A.Ş . (Aklease) for the Aklease SSL Project (IFC/R2026-0076, dated March 23, 2026) consisting of a senior loan package for an aggregate amount of up to $100 million comprised of the following:(i) an A loan of up to US$60 million for IFC’s own account and (ii) a B1 loan of up to US$40 million from potential participants, with the maximum exposure of the aggregate of the A loan and the B1 loan being no more than US$100 million. Lailee Jane Moghtader wished to be recorded as objecting. Jiandi Ye wished to be recorded as abstaining.","cbCaicmQ0vxzENJ2","https://ap.wps.com/l/cbCaicmQ0vxzENJ2","pdf",147598,1,"English","en",105,"# Investment Approval Summary\n## Loan Structure and Amounts\n## Recorded Objection and Abstention","[{\"question\":\"What was approved on an absence-of-objection basis on April 2, 2026?\",\"answer\":\"IFC’s Board approved an investment in Türkiye-Ak Finansal Kiralama A.Ş. (Aklease) for the Aklease SSL Project on an absence-of-objection basis.\"},{\"question\":\"How is the senior loan package structured for the Aklease SSL Project?\",\"answer\":\"It includes an A loan up to US$60 million for IFC’s own account and a B1 loan up to US$40 million from potential participants.\"},{\"question\":\"What was the maximum aggregate exposure for the A and B1 loans?\",\"answer\":\"The maximum exposure for the combined A loan and B1 loan is no more than US$100 million.\"}]",1784490052,3,{"code":4,"msg":29,"data":30},"ok",{"site_id":23,"language":22,"slug":31,"title":13,"keywords":32,"description":14,"schema_data":33,"social_meta":83,"head_meta":85,"extra_data":87,"updated_unix":26},"turkiye-ak-finansal-kiralama-as-aklease-aklease-ssl-project-absence-of-objection-basis-approval-april-2-2026","",{"@graph":34,"@context":82},[35,51,65],{"@type":36,"itemListElement":37},"BreadcrumbList",[38,42,46,48],{"item":39,"name":40,"@type":41,"position":20},"https://docshare.wps.com","Home","ListItem",{"item":43,"name":44,"@type":41,"position":45},"https://docshare.wps.com/document/","Document",2,{"item":47,"name":12,"@type":41,"position":27},"https://docshare.wps.com/document/research-report/",{"item":49,"name":13,"@type":41,"position":50},"https://docshare.wps.com/document/turkiye-ak-finansal-kiralama-as-aklease-aklease-ssl-project-absence-of-objection-basis-approval-april-2-2026/111422/",4,{"url":49,"name":13,"@type":52,"author":53,"headline":13,"publisher":55,"fileFormat":58,"inLanguage":22,"description":14,"dateModified":59,"datePublished":59,"encodingFormat":58,"isAccessibleForFree":60,"interactionStatistic":61},"DigitalDocument",{"name":9,"@type":54},"Person",{"url":39,"name":56,"@type":57},"DocShare","Organization","application/pdf","2026-07-19",true,{"@type":62,"interactionType":63,"userInteractionCount":4},"InteractionCounter",{"@type":64},"ViewAction",{"@type":66,"mainEntity":67},"FAQPage",[68,74,78],{"name":69,"@type":70,"acceptedAnswer":71},"What was approved on an absence-of-objection basis on April 2, 2026?","Question",{"text":72,"@type":73},"IFC’s Board approved an investment in Türkiye-Ak Finansal Kiralama A.Ş. (Aklease) for the Aklease SSL Project on an absence-of-objection basis.","Answer",{"name":75,"@type":70,"acceptedAnswer":76},"How is the senior loan package structured for the Aklease SSL Project?",{"text":77,"@type":73},"It includes an A loan up to US$60 million for IFC’s own account and a B1 loan up to US$40 million from potential participants.",{"name":79,"@type":70,"acceptedAnswer":80},"What was the maximum aggregate exposure for the A and B1 loans?",{"text":81,"@type":73},"The maximum exposure for the combined A loan and B1 loan is no more than US$100 million.","https://schema.org",{"og:url":49,"og:type":84,"og:title":13,"og:site_name":56,"og:description":14},"article",{"robots":86,"canonical":49},"index,follow",{"doc_id":7,"site_id":23},{"code":4,"msg":5,"data":89},[90,94,98,102,107,112,117,120,125,128,132],{"id":20,"doc_module":4,"doc_module_name":44,"category_name":91,"show_sort_weight":92,"slug":93},"Story & Novel",90,"story-novel",{"id":45,"doc_module":4,"doc_module_name":44,"category_name":95,"show_sort_weight":96,"slug":97},"Literature",80,"literature",{"id":50,"doc_module":4,"doc_module_name":44,"category_name":99,"show_sort_weight":100,"slug":101},"Exam",70,"exam",{"id":103,"doc_module":4,"doc_module_name":44,"category_name":104,"show_sort_weight":105,"slug":106},5,"Comic",60,"comic",{"id":108,"doc_module":4,"doc_module_name":44,"category_name":109,"show_sort_weight":110,"slug":111},6,"Technology",50,"technology",{"id":113,"doc_module":4,"doc_module_name":44,"category_name":114,"show_sort_weight":115,"slug":116},7,"Healthcare",40,"healthcare",{"id":11,"doc_module":4,"doc_module_name":44,"category_name":12,"show_sort_weight":118,"slug":119},30,"research-report",{"id":121,"doc_module":4,"doc_module_name":44,"category_name":122,"show_sort_weight":123,"slug":124},9,"Religion & Spirituality",20,"religion-spirituality",{"id":123,"doc_module":4,"doc_module_name":44,"category_name":126,"show_sort_weight":123,"slug":127},"World Cup","world-cup",{"id":129,"doc_module":4,"doc_module_name":44,"category_name":130,"show_sort_weight":129,"slug":131},10,"Lifestyle","lifestyle",{"id":133,"doc_module":4,"doc_module_name":44,"category_name":134,"show_sort_weight":103,"slug":135},19,"General","general"]