[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-296855-105":59,"doc-detail-296855-en":131},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":124,"head_meta":126,"extra_data":128,"updated_unix":130},105,"en","traffic-management-for-works-on-roads-code-of-practice-march-2026-amendment-revision-status-record","Traffic Management for Works on Roads - Code of Practice - March 2026 - Amendment / Revision Status Record","","Official code of practice defining traffic management requirements for works on roads, including planning, technical guidance, consultation steps, and approval pathways. The document records the endorsement history, revision governance, and amendment updates through March 2026, spanning multiple sections and figures. It specifies changes such as sign spacing, detour and temporary impact protection measures, portable crash attenuators, temporary speed zone guidance, PTCD training and responsibilities, and conditions for when certain requirements apply.",{"@graph":69,"@context":123},[70,84,106],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/traffic-management-for-works-on-roads-code-of-practice-march-2026-amendment-revision-status-record/296855/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/traffic-management-for-works-on-roads-code-of-practice-march-2026-amendment-revision-status-record/296855.png","ImageObject",300,407,{"name":92,"@type":93},"Mary Man","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-11-13","2026-09-18",true,{"@type":102,"interactionType":103,"userInteractionCount":105},"InteractionCounter",{"@type":104},"ViewAction",23,{"@type":107,"mainEntity":108},"FAQPage",[109,115,119],{"name":110,"@type":111,"acceptedAnswer":112},"Who endorsed and oversees this traffic management code of practice?","Question",{"text":113,"@type":114},"The document was originally endorsed by the Traffic Management for Works on Roads Advisory Group on 3 March 2004. Revisions are endorsed by the Advisory Group and approved by the Main Roads Executive Director Planning and Technical Services, with technical advice from a specialist Technical Committee.","Answer",{"name":116,"@type":111,"acceptedAnswer":117},"What types of updates are recorded in the March 2026 revision status record?",{"text":118,"@type":114},"The record lists amendments across the whole document and specific sections, covering changes to wording, consultation requirements, sign and traffic device guidance, training additions, and updates to tables and figures.",{"name":120,"@type":111,"acceptedAnswer":121},"Does the document address consultation and submission steps for traffic management plans?",{"text":122,"@type":114},"Yes. It includes clarifications that consultation must occur prior to TMP submission and that a site visit must occur prior to finalising TMP, along with added guidance for generic TMP preparation and authorisation.","https://schema.org",{"og:url":83,"og:type":125,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":127,"canonical":83},"index,follow",{"doc_id":129,"site_id":62},296855,1789737987,{"code":4,"msg":5,"data":132},{"doc_id":129,"user_id":133,"nickname":92,"user_avatar":134,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":135,"file_id":136,"file_url":137,"file_type":138,"file_size":139,"view_count":105,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":140,"language":141,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":142,"faqs":143,"seo_title":144,"seo_description":67,"update_tm":130,"read_time":145,"preview_page_count":4},7421720224475,"https://ap-avatar.wpscdn.com/davatar_276721f389ce27ea32af1340a28f341c","OFFICIAL  \nTraffic Management for Works on Roads  \nCODE OF PRACTICE  \nMarch 2026  \nOFFICIAL  \nTRAFFIC MANAGEMENT FOR WORKS ON ROADS  \nCODE OF PRACTICE  \nAll printed copies are uncontrolled  \nMain Roads Western Australia  \nPlanning and Technical Services Directorate Road Safety Branch  \nMarch 2026  \nOFFICIAL  \nThis document was originally endorsed by the Traffic Management for Works on Roads Advisory Group on 3 March 2004. Revisions are endorsed by the Advisory Group and approved by Main Roads Executive Director Planning and Technical Services. The Advisory Group consists of members from Main Roads Western Australia (Main Roads), Australian Institute of Traffic Planning and Management (WA division) (AITPM) , Civil Contractors Federation (CCF) , Institute of Public Works Engineering Australia (WA division) (IPWEA), Traffic Management Association (TMAA) , WA Local Government Association (WALGA), Traffic Management Training Providers, and Engineers Australia (WA division) .  \nA specialist Technical Committee comprising members from Main Roads , IPWEA (WA division) and WALGA has provided technical advice in regard to various sections of this document.  \nAmendments to this document may be made from time to time reflecting the changes in technology, standards or legislation as well as the feedback from the industry, subject to endorsement by the Advisory Group. Users of this document are warned to make sure that they are using the current document which is available on Main Roads website at [www.mainroads.wa.gov.au](www.mainroads.wa.gov.au) ; go to ‘Technical & Commercial’ > ‘Working on Roads’  \nOFFICIAL  \nAMENDMENT / REVISION STATUS RECORD  \nDate  \nSection  \nAmendment / Revision  \nDescription  \nMarch 2026  \nWhole document  \nSection 1.3.1  \nSection 1.3.2  \nSection 2.1  \nSection 4.2.1  \nSection 4.2.2  \nSection 4.2.6  \nSection 4.4.1  \nSection 4.4.2  \nSection 4.6  \nSection 6.1.8  \nSection 6.1.9  \nSection  \n6.1.13  \nSection  \n6.1.14  \nSection 6.2.4  \nSection 6.5.2  \nSection 6.8.1  \nSection 6.8.2  \nFigure numbers modified Table numbers modified  \nSection reworded. AGTTM Part 8 edition 2 adopted.  \nPTCD training now adopted.  \nSection reworded  \nClarification – consultation to occur prior to TMP submission.  \nSite visit to occur prior to finalising TMP.  \nInclusion of reference to IMPs/CTMPs. Requirement that site visit photo must use Main Roads GPS SLK app or similar.  \nAdded new details on Generic TMPs preparation and authorisation.  \nReference to AGTTM Part 8 added.  \nSign tolerances updated.  \nTransperth consultation updated.  \nAmendments to situations when NoR form is required  \nAdded information and guidance to prevent signs blocking paths,  \nClarification – Main Roads path closures.  \nAllowing ROAD CLOSED, MMS-ADV-31, to be black on white.  \nRequirements for sign spacing adjusted due to physical constraints.  \nAdded signs may be spaced within speed buffer.  \nNew section – Workers (symbolic) signs  \nNew section – Lane Status Signs  \nAdded MMS requirements do not apply when used to control pedestrians only.  \nAdded additional wording for traffic speed .  \nAmendment – table 10 distance taken from ‘STOP HERE..’ sign position.  \nAdded to consider impact of nearby intersections and  \nOFFICIAL  \nwork vehicles.  \nSection 6.8.3 New wording – for use of PTCDs, signalised intersection defined as within 50 m of the stop line on approach.  \nTable 14 – title amended.  \nAddition to allow use of portable traffic signals on both sides of the carriageway.  \nSection 6.8.7 Clarification – lengths in table 15 apply only to singlelane section.  \nSection 6.8.8 Additional guidance on the use of roadworks pilot vehicles.  \nSection 6.9 Section title renamed – Temporary Impact Protection Devices.  \nAddition of Portable Crash Attenuators.  \nSection 6.9.4 New section – Portable Crash Attenuators.  \nSection 6.13 Figures updated to align with typical worksite layout .  \nSection Reference to road category removed, table 24 added  \n6.17.1  \nSection 8.1 Table 27 upd","cbCaicK0WR1ysLC6","https://ap.wps.com/l/cbCaicK0WR1ysLC6","pdf",4592394,158,"English","# Amendment / Revision Status Record\n## Whole document\n## Section updates and technical changes","[{\"question\":\"Who endorsed and oversees this traffic management code of practice?\",\"answer\":\"The document was originally endorsed by the Traffic Management for Works on Roads Advisory Group on 3 March 2004. Revisions are endorsed by the Advisory Group and approved by the Main Roads Executive Director Planning and Technical Services, with technical advice from a specialist Technical Committee.\"},{\"question\":\"What types of updates are recorded in the March 2026 revision status record?\",\"answer\":\"The record lists amendments across the whole document and specific sections, covering changes to wording, consultation requirements, sign and traffic device guidance, training additions, and updates to tables and figures.\"},{\"question\":\"Does the document address consultation and submission steps for traffic management plans?\",\"answer\":\"Yes. It includes clarifications that consultation must occur prior to TMP submission and that a site visit must occur prior to finalising TMP, along with added guidance for generic TMP preparation and authorisation.\"}]","Traffic Management for Works on Roads - Code of Practice - March 2026 - Amendment / Revision Status Record | PDF",398]