[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-663763-105":59,"doc-detail-663763-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","township-of-brock-engineering-design-criteria-standard-drawings","Township of Brock - Engineering Design Criteria & Standard Drawings","","Engineering Design Criteria & Standard Drawings for the Township of Brock, prepared by C. C. Tatham & Associates Ltd. It includes revision control information, and outlines submission and approval processes subject to Township Engineer approval. The document specifies general requirements, definitions, pre-consultation and pre-servicing policies, construction and certification submittals, and detailed drawing and report requirements, covering engineering drawings and supporting studies.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/township-of-brock-engineering-design-criteria-standard-drawings/663763/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/township-of-brock-engineering-design-criteria-standard-drawings/663763.png","ImageObject",300,407,{"name":92,"@type":93},"pixelkiddo","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-28",true,{"@type":102,"interactionType":103,"userInteractionCount":34},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"Who prepared the Engineering Design Criteria & Standard Drawings for the Township of Brock?","Question",{"text":112,"@type":113},"The document was prepared by C. C. Tatham & Associates Ltd.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"How are revisions to the standards handled?",{"text":117,"@type":113},"Revisions include additions, deletions, and modifications, and changes are subject to approval of the Township Engineer.",{"name":119,"@type":110,"acceptedAnswer":120},"What types of items are required in engineering submissions?",{"text":121,"@type":113},"The document specifies submission requirements for draft plan approval, additional reports (such as traffic and environmental studies), engineering drawings, and certification submittals.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},663763,1793231325,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":34,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":129,"read_time":144},962090883892,"https://ap-avatar.wpscdn.com/avatar/e00115db34f3e0f11b?x-image-process=image/resize,m_fixed,w_180,h_180&k=1790152879550218658","Township of Brock  \nEngineering Design Criteria & Standard Drawings  \nprepared by:  \nC. C. Tatham & Associates Ltd.  \n50 AndrewStreet South, Suite 100  \nOrillia, ON L3V 7T5  \nTel: (705) 325-1753 Fax: (705) 325-7420 [info@cctatham.com](info@cctatham.com)  \nprepared for Township ofBrock June 2018  \nCCTA File 315838  \nRevision Information Sheet  \nThe following table indicates all revisions including any additions, deletions and modifications to this manual subsequent to its issuance on June 2018. Revisions to these standards are subject to the approval of the Township Engineer. A written request to change or revise the standards may be submitted to the Director of Public Works for review.  \nRevision details should include the all related section titles, section numbers and page numbers.  \n\n| Revision No. | Date | Revision Details | Initials |\n| --- | --- | --- | --- |\n| 1 |  |  |  |\n| 2 |  |  |  |\n| 3 |  |  |  |\n| 4 |  |  |  |\n| 5 |  |  |  |\n| 6 |  |  |  |\n| 7 |  |  |  |\n| 8 |  |  |  |\n| 9 |  |  |  |\n| 10 |  |  |  |\n| 11 |  |  |  |\n| 12 |  |  |  |\n| 13 |  |  |  |\n| 14 |  |  |  |\n| 15 |  |  |  |\n| 16 |  |  |  |\n| 17 |  |  |  |\n| 18 |  |  |  |\n| 19 |  |  |  |\n| 20 |  |  |  |\n| 21 |  |  |  |\n| 22 |  |  |  |\n\nTABLE OF CONTENTS  \nRevision Information Sheet i  \n1 General Requirements 1  \n1.1 Introduction 1  \n1.1.1 Regional Municipality of Durham 1  \n1.2 Definitions 1  \n1.3 Submissions to Government and Other Agencies 3  \n1.4 Barrier Free Considerations 3  \n1.5 Pre-Consultation Meeting 3  \n1.6 Pre-Servicing Policy for Subdivision Development 3  \n1.7 Subdivision Agreement Schedules 4  \n1.7.1 Preparation of Subdivision Agreement 4  \n1.7.2 Requirements Prior to Commencement of Construction 6  \n1.8 Construction 6  \n1.8.1 General 6  \n1.8.2 Project Meetings 7  \n1.8.3 Construction Layout 7  \n1.8.4 Tree and Plant Protection 7  \n1.8.5 Materials Testing 7  \n1.8.6 Approved Materials 8  \n1.9 Certificate of Completion and Final Acceptance 8  \n1.10 Certification Submittals 9  \n1.10.1 Lot Grading Certificate 9  \n2 Submission Requirements 11  \n2.1 Introduction 11  \n2.2 Engineering Requirements for Draft Plan Approval 11  \n2.3 Additional Reports 15  \n2.3.1 Traffic and Transportation Impact Study 15  \n2.3.2 Environmental Impact Study 15  \n2.3.3 Environmental Site Assessment 15  \n2.3.4 Archaeological Assessment 15  \n2.3.5 Noise and Vibration Analysis Studies 15  \n2.4 First Engineering Submission 16  \n2.4.1 Engineering Submission 16  \n2.4.2 Municipal Structures Submission 17  \n2.4.3 Parks and Landscaping Submission 18  \n2.5 Subsequent Submissions 18  \n2.5.1 Second Engineering Submission 19  \n2.5.2 Parks and Landscaping Submissions 19  \n2.6 Issued for Construction Submission 19  \n3 Drawing And Report Requirements 21  \n3.1 Specifications for Engineering Drawings: 21  \n3.2 General Drawing Requirements 21  \n3.3 Computer Aided Drawings (CAD) 22  \n3.4 General Plan of Services 22  \nTownship of Brock Page iii  \nEngineering Design Criteria June 2018  \n3.5 Storm Drainage Plans 24  \n3.6 Sanitary Drainage Plans 25  \n3.7 Grading Plans 25  \n3.7.1 Area Grading 25  \n3.7.2 Individual Lot Grading 27  \n3.8 Plan and Profile Drawings 28  \n3.9 Composite Utility Plan 30  \n3.10 Detail Drawings 30  \n3.11 Parkland Development Drawings 31  \n3.12 Trailsand Walkways 32  \n3.13 Landscaping 32  \n3.13.1 General Requirements 32  \n3.13.2 Notes for Streetscape Submission Drawings 33  \n3.13.3 Notes for Naturalization Submission Drawings 34  \n3.14 Erosion Sediment Control Plan 34  \n3.15 As-BuiltDrawings 35  \n3.15.1 General 35  \n3.15.2 “As-Built” Field Survey 35  \n3.15.3 Drawing Revisions 36  \n3.15.4 Storm Sewers 37  \n3.15.5 Sanitary Sewers 37  \n3.15.6 Water Mains 37  \n3.15.7 Roadways 37  \nTownship of Brock Page iv  \nEngineering Design Criteria June 2018  \n3.16 General Report and Study Requirements 38  \n3.16.1 Geotechnical Reports 38  \n3.16.2 Hydrogeological Reports 39  \n3.16.3 Stormwater Management Plans 40  \n3.16.4 Traffic & Transportation Impact Study 41  \n3.16.5 Environmental Impact Assessm","cbCaiiHfcCFGhHo7","https://ap.wps.com/l/cbCaiiHfcCFGhHo7","pdf",5710643,178,"English","# Revision Information Sheet\n# 1 General Requirements\n## 1.1 Introduction\n## 1.2 Definitions\n## 1.3 Submissions to Government and Other Agencies\n## 1.4 Barrier Free Considerations\n## 1.5 Pre-Consultation Meeting\n## 1.6 Pre-Servicing Policy for Subdivision Development\n## 1.7 Subdivision Agreement Schedules\n## 1.8 Construction\n## 1.9 Certificate of Completion and Final Acceptance\n## 1.10 Certification Submittals\n# 2 Submission Requirements\n## 2.1 Introduction\n## 2.2 Engineering Requirements for Draft Plan Approval\n## 2.3 Additional Reports\n## 2.4 First Engineering Submission\n## 2.5 Subsequent Submissions\n## 2.6 Issued for Construction Submission\n# 3 Drawing And Report Requirements\n## 3.1 Specifications for Engineering Drawings\n## 3.2 General Drawing Requirements\n## 3.3 Computer Aided Drawings (CAD)\n## 3.4 General Plan of Services\n## 3.5 Storm Drainage Plans\n## 3.6 Sanitary Drainage Plans\n## 3.7 Grading Plans\n## 3.8 Plan and Profile Drawings\n## 3.9 Composite Utility Plan\n## 3.10 Detail Drawings\n## 3.11 Parkland Development Drawings\n## 3.12 Trails and Walkways\n## 3.13 Landscaping\n## 3.14 Erosion Sediment Control Plan\n## 3.15 As-Built Drawings\n## 3.16 General Report and Study Requirements\n# 4 Servicing Design Requirements\n## 4.1 Introduction\n## 4.2 Storm Drainage System\n## 4.3 Roadways\n## 4.4 Street Name and Traffic Signs\n## 4.5 Roadway Markings\n## 4.6 Traffic Signals\n## 4.7 Street Lighting\n## 4.8 Pedestrian Ways\n## 4.9 Fencing\n## 4.10 Lot Grading\n## 4.11 Easement and Block Requirements\n## 4.12 Erosion and Sediment Control\n## 4.13 Utilities","[{\"question\":\"Who prepared the Engineering Design Criteria \\u0026 Standard Drawings for the Township of Brock?\",\"answer\":\"The document was prepared by C. C. Tatham \\u0026 Associates Ltd.\"},{\"question\":\"How are revisions to the standards handled?\",\"answer\":\"Revisions include additions, deletions, and modifications, and changes are subject to approval of the Township Engineer.\"},{\"question\":\"What types of items are required in engineering submissions?\",\"answer\":\"The document specifies submission requirements for draft plan approval, additional reports (such as traffic and environmental studies), engineering drawings, and certification submittals.\"}]","Township of Brock - Engineering Design Criteria & Standard Drawings | PDF",449]