[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-663673-105":3,"detail-sidebar-cat-0-en-105":80,"doc-detail-663673-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","tos-no-004-palisades-library-task-order-solicitation","TOS No. 004 - Palisades Library - Task Order Solicitation","","Task Order Solicitation (TOS) No. 004 for the Palisades Library requests pre-qualified on-call Architectural and Related Professional Services consultants (Tier 2) to deliver professional design and construction administration. The project covers reconstruction of a damaged library facility at 861 Alma Real Drive, with an estimated $26 million construction budget and roughly four to five years in schedule. Scope includes BIM/Autodesk Revit 2025 drawing production, coordinated multi-discipline design, and electronic submission of Revit and PDF deliverables across design phases. Services also address FEMA “like for like” rebuilding criteria.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/tos-no-004-palisades-library-task-order-solicitation/663673/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/tos-no-004-palisades-library-task-order-solicitation/663673.png","ImageObject",300,407,{"name":42,"@type":43},"Hazel","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-29","2026-10-28",true,{"@type":52,"interactionType":53,"userInteractionCount":33},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"What TOS is issued and for which project?","Question",{"text":62,"@type":63},"TOS No. 004 is for the Palisades Library reconstruction project in Pacific Palisades, Los Angeles, CA.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"What services does the selected consultant provide?",{"text":67,"@type":63},"The consultant provides design and construction administration services, including all required design disciplines and coordination throughout the design phases.",{"name":69,"@type":60,"acceptedAnswer":70},"What are the required tools and deliverables for drawings and specifications?",{"text":71,"@type":63},"Drawings must be generated in BIM/Autodesk Revit 2025 and submitted as electronic Revit files plus PDF drawings. Technical specifications must be produced in the latest Microsoft Word version and delivered as Word files and as PDF at each design phase.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},663673,1793230264,{"code":4,"msg":81,"data":82},"success",[83,87,91,95,100,105,110,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":84,"show_sort_weight":85,"slug":86},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":88,"show_sort_weight":89,"slug":90},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":92,"show_sort_weight":93,"slug":94},"Exam",70,"exam",{"id":96,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},5,"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},6,"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":107,"show_sort_weight":108,"slug":109},7,"Healthcare",40,"healthcare",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":112,"slug":113},8,30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":96,"slug":129},19,"General","general",{"code":4,"msg":81,"data":131},{"doc_id":78,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":111,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":33,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":139,"language":140,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":12,"update_tm":79,"read_time":144},137441390410,"https://ap-avatar.wpscdn.com/avatar/2000252f4ab5702993?_k=1776741390130283984","BOARD OF PUBLIC WORKS MEMBERS  \nSTEVE S. KANG  \nPRESIDENT  \nJENNY CHAVEZ  \nVICE PRESIDENT  \nJOHN GRANT  \nPRESIDENT PRO TEMPORE  \nFAITH I. MITCHELL  \nCOMMISSIONER  \nERNESTO CARDENAS  \nCOMMISSIONER  \nELYSE MATSON  \nEXECUTIVE OFFICER  \nCITY OF LOS ANGELES  \nCALIFORNIA  \nKAREN BASS  \nMAYOR  \nDEPARTMENT OF PUBLIC WORKS  \nBUREAU OF ENGINEERING  \nALFRED MATA, PE  \nINTERIM CITY ENGINEER  \n1149 S. BROADWAY, SUITE 700 LOS ANGELES, CA 90015-2213  \n[http://engineering.lacity.gov](http://engineering.lacity.gov)  \nDecember 22, 2025  \nTo All the Consultants on the Pre-Qualified On-Call (PQOC) Architectural and Related  \nProfessional Services Consultants List-Tier 2  \nTASK ORDER SOLICITATION (TOS) NO. 004 FOR THE PALISADES LIBRARY  \n(WORK ORDER NO. E1909422)  \nSECTION I - INTRODUCTION  \nThe City of Los Angeles (City), Bureau of Engineering (BOE), Architectural Division is seeking professional design and construction administration services for the Palisades Library (Project), located at 861 Alma Real Drive, Pacific Palisades, CA 90272. The selected consultant (Consultant) will provide the following professional services as specified in this TOS.  \nOn January 7, 2025, a fire that burned underground from the embers of a previous fire were reignited, and spread by the powerful Santa Ana winds and engulfed approximately 23,000 acres and damaged over 6,800 structures, including the Palisades Library. The Library is a beloved community treasure that is dearly missed by the patrons of all ages. Although new memories will be forged in the new building, many of the community members have fond memories of the library, dating back to their childhood.  \nThe selected Consultant will provide design and construction administration for the reconstruction of the Project within the budgeted construction cost of $26 million dollars anda Project duration of approximately four to five years, as outlined in Section V-Project Schedule of the TOS.  \nSECTION II -PROJECT DESCRIPTION  \nThe Project entails the design and construction of a new library facility that includes approximately 12,000 square feet of interior space, 3,000 square feet of exterior patio,  \nAN EQUAL EMPLOYMENT OPPORTUNITY EMPLOYER Recyclable and made from recycled waste.  \nand expansion or revisions to the site and parking area as needed to meet code-required upgrades and electric vehicle (EV) charging requirements. In order to meet the evolving community needs, the building will incorporate traditional library programming and new programming, as approved by the Los Angeles Public Library (LAPL) and the community.  \nConstructed in 2000-2002, the Palisades Library provided library services to accommodate children, teens, young adults, and the elderly. Its programming was once centered around book stacks to accommodate the noted user groups, and included amore intimate Story Room reading space, and a multipurpose room for community events. New program spaces will be utilized to accommodate the current and future needs of patrons, which may include a tech training center, 3D printing rooms, and a New Americans Center.  \nThe Project design will need to adhere to the program and design standards of the client and to reasonable recommendations from the community stakeholders. The Project is to meet the criteria of a “like for like” re-build in accordance with the Federal Emergency Management Agency (FEMA) and the Los Angeles Department of Building and Safety (LADBS) . The immediate surrounding area is largely free from adjacent structures, as the site sits on the outskirts of the park.  \nSECTION III -SCOPE OF BASIC SERVICES  \nThe Project design shall be developed through coordination with the selected Consultant and meetings with stakeholders, BOE staff, and agencies having jurisdiction over the Project. The BOE will provide project management, necessary surveys, environmental reports and clearances, construction management, and geotechnical engineering reports where needed.  \nA. The Consultant, in accor","cbCaifyrOhN2WLeY","https://ap.wps.com/l/cbCaifyrOhN2WLeY","pdf",811632,11,"English","# Section I - Introduction\n## Purpose and requesting consultants\n## Fire incident background\n## Budget and schedule overview\n# Section II - Project Description\n## New library facility scope\n## Program spaces and community needs\n## Like-for-like rebuilding criteria\n# Section III - Scope of Basic Services\n## Consultant responsibilities\n## Termination conditions\n## BIM and document format requirements\n## Multidiscipline coordination\n## Technical specification requirements","[{\"question\":\"What TOS is issued and for which project?\",\"answer\":\"TOS No. 004 is for the Palisades Library reconstruction project in Pacific Palisades, Los Angeles, CA.\"},{\"question\":\"What services does the selected consultant provide?\",\"answer\":\"The consultant provides design and construction administration services, including all required design disciplines and coordination throughout the design phases.\"},{\"question\":\"What are the required tools and deliverables for drawings and specifications?\",\"answer\":\"Drawings must be generated in BIM/Autodesk Revit 2025 and submitted as electronic Revit files plus PDF drawings. Technical specifications must be produced in the latest Microsoft Word version and delivered as Word files and as PDF at each design phase.\"}]","TOS No. 004 - Palisades Library - Task Order Solicitation | PDF",28]