[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-399974-105":3,"detail-sidebar-cat-0-en-105":81,"doc-detail-399974-en":131},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","tl-timesledger-may-31-june-6-2013","TL TimesLedger - May 31-June 6, 2013","","Local news issue dated May 31-June 6, 2013 covering Queens community stories and city affairs. Reports highlight memorial events, including a conclusion of the Forest Hills parade at Remsen Cemetery, and profiles of individuals connected to civic life. Other featured articles cover Delta’s phase-one expansion at JFK Terminal 4 and community reactions to permit approval for a controversial Astoria medical facility construction, including disputes over property damage and potential mediation by local officials.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/tl-timesledger-may-31-june-6-2013/399974/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/tl-timesledger-may-31-june-6-2013/399974.png","ImageObject",300,407,{"name":42,"@type":43},"Angel","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-11-27","2026-09-27",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",11,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What major infrastructure update is reported about JFK Terminal 4?","Question",{"text":63,"@type":64},"Delta cut the ribbon on the first phase of the JFK Terminal 4 expansion, a $1.2 billion project, and indicates more expansion is planned.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"What controversy is associated with the Astoria medical facility permit?",{"text":68,"@type":64},"City-issued approval allows restart of a contested project after neighbors argued construction damage and cited a setback design error that previously stopped construction.",{"name":70,"@type":61,"acceptedAnswer":71},"How do homeowners and officials describe the next steps after the permit approval?",{"text":72,"@type":64},"Neighbors argue compensation has not occurred, while supporters and local officials discuss mediation efforts to resolve property damage disputes.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},399974,1790555466,{"code":4,"msg":82,"data":83},"success",[84,88,92,96,101,106,111,115,120,123,127],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":89,"show_sort_weight":90,"slug":91},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":93,"show_sort_weight":94,"slug":95},"Exam",70,"exam",{"id":97,"doc_module":4,"doc_module_name":25,"category_name":98,"show_sort_weight":99,"slug":100},5,"Comic",60,"comic",{"id":102,"doc_module":4,"doc_module_name":25,"category_name":103,"show_sort_weight":104,"slug":105},6,"Technology",50,"technology",{"id":107,"doc_module":4,"doc_module_name":25,"category_name":108,"show_sort_weight":109,"slug":110},7,"Healthcare",40,"healthcare",{"id":112,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":113,"slug":114},8,30,"research-report",{"id":116,"doc_module":4,"doc_module_name":25,"category_name":117,"show_sort_weight":118,"slug":119},9,"Religion & Spirituality",20,"religion-spirituality",{"id":118,"doc_module":4,"doc_module_name":25,"category_name":121,"show_sort_weight":118,"slug":122},"World Cup","world-cup",{"id":124,"doc_module":4,"doc_module_name":25,"category_name":125,"show_sort_weight":124,"slug":126},10,"Lifestyle","lifestyle",{"id":128,"doc_module":4,"doc_module_name":25,"category_name":129,"show_sort_weight":97,"slug":130},19,"General","general",{"code":4,"msg":82,"data":132},{"doc_id":79,"user_id":133,"nickname":42,"user_avatar":134,"doc_module":4,"category_id":112,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":135,"file_id":136,"file_url":137,"file_type":138,"file_size":139,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":140,"language":141,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":142,"faqs":143,"seo_title":144,"seo_description":12,"update_tm":145,"read_time":146,"preview_page_count":102,"preview_urls":147},687207412472,"https://ap-avatar.wpscdn.com/davatar_155a257f0dc6eb9ab79c44ca47cae57d","May 31-June 6, 2013  \nYour Neighborhood-Your News®  \n• JAMAICA TIMES  \n• ASTORIA TIMES  \n• FOREST HILLS LEDGER  \n• LAURELTON TIMES  \n• QUEENS VILLAGE TIMES  \n• RIDGEWOOD LEDGER  \n• HOWARD BEACH TIMES  \n• RICHMOND HILL TIMES  \nFREE  \nALSO COVERING ELMHURST, JACKSON HEIGHTS, LONG ISLAND CITY, MASPETH, MIDDLE VILLAGE, REGO PARK, SUNNYSIDE   \nSALUTING THOSE WHO SERVED  \nThomas Long, commander of the American Legion Post 1424 (front l.) and U. S. Marine Sgt. Robert O’Malley carry a wreath to the memorial during the conclusion of the Forest Hills parade at Remsen Cemetery. See Memorial Day  \ncoverage on Pages 5, 6, 9, 20, 24. Photo by Christina Santucci  \nDelta opens phase one of JFK terminal  \nBY RICH BOCKMANN  \nDelta celebrated one of its largest investments in the metropolitan area last week when the company cut the ribbon on the $1.2 billion first phase of the expansion of JFK’s Terminal 4, and the airline has more in store.  \n“We can actually, just when we finish here, go do the groundContinued on Page 42  \nFreed after 23 1/2 years in prison  \nExonerated man shares his story with LGA students  \nBY RICH BOCKMANN  \nStudents at LaGuardia Community College Tuesday heard the firsthand account of a man who was freed from prison with help from another wrongly convicted man as well as his viewson the criminal justice system that sent him to jail for nearly a quarter of a century for a murder he did not commit.  \n“What happens is when you’re not accustomed to the criminal justice system … you really don’t know and understand that process,” William Lopez said at the college’s fifth annual criminal justice conferContinued on Page 42  \nSpecial Section Inside  \n\n|  A CNG Publication Vol. 1 No. 21 52 total pages  |\n| --- |\n| \u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>CATS For\u003Cbr>MAYOR\u003Cbr>ANew Yorker for all New Yorkers\u003Cbr>[cats2013.com](cats2013.com)\u003Cbr>Paid for by Catsimatidis 2013\u003Cbr>\u003Cbr>\u003Cbr>|\n\n2  \nTL  \nTIMESLEDGER, MAY 31-JUNE 6 , 2013 T IMESLEDGER .COM  \nAstoria med center gets OK  \nCity issues permit to restart construction on controversial project  \nBY JOE ANUTA  \nThe city granted a crucial permit to developers of a controversial Astoria medical facility last week against the wishes of neighbors who contend construction crews did irreparable damage to their property.  \nOn May 21, the city Board of Standards and Appeals granted a special permit to Pali Realty, the company that began constructing the eight-story structure, at 23-25 31st St., after the city Department of Buildings approved the plans in March, 2011, according to the developers.  \nPali, run by Yianni Konstantinidis, had completed about 80 percent of the building before an auditor found a mistake in the July, 2012.  \nThe second story of the building, beginning 23 feet in the air, is supposed tobe set back 30 feet from the edge like a giant step, but was instead designed as a 20-foot setback.  \nConstruction on the back of the building was stopped, but last week’s special permit essentially legalizes the mistake.  \n“The special permit issued by BSA will allow the development of a beneficial medical office building in western Queens, an area that is vastly under served in its medical needs,” a spokesman said.  \nThat did not sit well with homeowners, who maintain the city gave away  \nState Sen. Tony Avella (l.) points to a crack in the patio of Lisa  \nDraghi. Photo by Joe Anuta  \nits only bargaining chip in the fight to win compensation to fix their homes.  \n“This was our growold house, and they ruined it,” said Robert Draghi, who lives behind the future medical facility in a brick home with his wife. Draghi, and others on the block, contend that when Pali Realty dug the foundation, some dirt underneath their homes was sucked out, creating cracks in the walls, back patios and foundations. Draghi’s house even began to lean backward away from the curb, he said.  \nThey hoped the city  \nwould withhold the special permit until the problem could be remedied.  \nWhen the community board voted-to recommend approva","cbCaiiqIjvfBcUku","https://ap.wps.com/l/cbCaiiqIjvfBcUku","pdf",13623140,52,"English","# May 31-June 6, 2013\n## Delta opens phase one of JFK terminal","[{\"question\":\"What major infrastructure update is reported about JFK Terminal 4?\",\"answer\":\"Delta cut the ribbon on the first phase of the JFK Terminal 4 expansion, a $1.2 billion project, and indicates more expansion is planned.\"},{\"question\":\"What controversy is associated with the Astoria medical facility permit?\",\"answer\":\"City-issued approval allows restart of a contested project after neighbors argued construction damage and cited a setback design error that previously stopped construction.\"},{\"question\":\"How do homeowners and officials describe the next steps after the permit approval?\",\"answer\":\"Neighbors argue compensation has not occurred, while supporters and local officials discuss mediation efforts to resolve property damage disputes.\"}]","TL TimesLedger - May 31-June 6, 2013 | PDF",1790506039,131,[148,152,156,160,164,168],{"page_no":22,"url":149,"width":150,"height":151},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/7034218683c3eb562ed4da57d514654b.webp",983,1065,{"page_no":26,"url":153,"width":154,"height":155},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/06f66427893f806601f329ba2e513383.webp",982,1063,{"page_no":30,"url":157,"width":158,"height":159},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/499822e34e13530cbb2dbccb6bbad9c6.webp",981,1062,{"page_no":33,"url":161,"width":162,"height":163},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/bd317933f6cb40389a01ec7b497bea13.webp",980,1061,{"page_no":97,"url":165,"width":166,"height":167},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/f4b852583294fd5e199a5bdb8fb8d238.webp",979,1060,{"page_no":102,"url":169,"width":170,"height":171},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/d06ee2e8015b289b437ef1e35a396757.webp",978,1059]