[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-266936-105":59,"doc-detail-266936-en":122},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":115,"head_meta":117,"extra_data":119,"updated_unix":121},105,"en","the-ultimate-checklist-for-efficient-fat-and-sat-testing-automation-systems-approval-checklist","THE ULTIMATE CHECKLIST FOR EFFICIENT FAT and SAT TESTING AUTOMATION SYSTEMS APPROVAL - Checklist","","Efficient FAT and SAT testing automation systems approval checklist covering manufacturer and machine identification fields plus quoted and timed rates. Visual appearance checks ensure no visible damage, proper tagging of air regulator settings, correct labeling of bowls and motor controllers, operator-friendly door operation, acceptable base platform height, and acceptable machine paint. Safety review validates wired safety circuits, correctly functioning e-stops, interlocked power switching, complete guarding, sharp-protrusion avoidance, and stoppage when guard doors open. Electrical and machine readiness items verify level sensors, accurate counting, memory retention after power loss, numbered wiring, provision of electrical drawings, acceptable tooling, spindle performance, mechanical design acceptability, and correct feeder/alarm behavior. Defective part detecting, vision, and runoff criteria are included, ending with buyer/vendor signoff and printable checklist sections.",{"@graph":69,"@context":114},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":20,"@type":76,"position":81},"https://docshare.wps.com/document/exam/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/the-ultimate-checklist-for-efficient-fat-and-sat-testing-automation-systems-approval-checklist/266936/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/the-ultimate-checklist-for-efficient-fat-and-sat-testing-automation-systems-approval-checklist/266936.png","ImageObject",300,407,{"name":92,"@type":93},"Chloe Bennett","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-09-14",true,{"@type":102,"interactionType":103,"userInteractionCount":39},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108],{"name":109,"@type":110,"acceptedAnswer":111},"What electrical and machine functions are checked for FAT/SAT readiness?","Question",{"text":112,"@type":113},"It validates level sensor operation, correct counter behavior without overcounting, memory retention after power loss, numbered wiring, and inclusion of electrical drawings in the electrical enclosure. For the machine, it confirms acceptable tooling, spindle performance, proper diverter and shifter operation, mechanically acceptable designs, consistent feeding, correctly triggered alarms in HMIs, and fail-safe reject-related behavior where applicable.","Answer","https://schema.org",{"og:url":83,"og:type":116,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":118,"canonical":83},"index,follow",{"doc_id":120,"site_id":62},266936,1790937984,{"code":4,"msg":5,"data":123},{"doc_id":120,"user_id":124,"nickname":92,"user_avatar":125,"doc_module":4,"category_id":19,"category_name":20,"doc_title":65,"doc_description":67,"doc_content":126,"file_id":127,"file_url":128,"file_type":129,"file_size":130,"view_count":39,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":52,"language":131,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":132,"faqs":133,"seo_title":134,"seo_description":67,"update_tm":135,"read_time":136},962084925782,"https://ap-avatar.wpscdn.com/davatar_9964176cb1d06d4a9deccf72a44ae3dc","THE ULTIMATE  \nCHECKLIST  \nFOR EFFICIENT  \nFAT and SAT  \nTESTING  \nAUTOMATION SYSTEMS APPROVAL  \nDate  \nManufacturer  \nMachine Description  \nMachine Number  \nQuoted Rate  \nTimed Rate  \n\n| |  |\n| --- | --- |\n|  |  |\n| Quoted Rate\u003Cbr>Machine Paint Special | Timed Rate |\n|  |  |\n|  | Requested? |\n|  |  |\n\nBowl Manufacturer Number  \nly  \n01 | The Ultimate Checklist for Efﬁcient FAT and SAT Testing +1 (450) [562-0745 | www.orientech.com](562-0745 | www.orientech.com)  \nVISUAL APPEARANCE  \n|  | Machine does not have any visible damage |\n| --- | --- |\n| |  |\n|  |  |\n\n\n|  | All air regulator settings are tagged with name and settings |\n| --- | --- |\n| |  |\n|  |  |\n\n\n|  | Settings are not attached to removable components that could be replaced |\n| --- | --- |\n| |  |\n|  |  |\n\n\n|  | Feeder bowl has air jet locations engraved on bowl and airlines tagged with proper regulator location |\n| --- | --- |\n| |  |\n|  |  |\n\n\n|  | All bowls and motor controllers are tagged with settings |\n| --- | --- |\n| |  |\n|  |  |\n\n\n|  | All doors open in an operator friendly way as stated in standards |\n| --- | --- |\n| |  |\n|  |  |\n\n\n|  | Base platform is at an acceptable height |\n| --- | --- |\n| |  |\n|  |  |\n\n\n|  | Machine paint is acceptable |\n| --- | --- |\n| |  |\n|  |  |\n\n02 | The Ultimate Checklist for Efﬁcient FAT and SAT Testing +1 (450) [562-0745 | www.orientech.com](562-0745 | www.orientech.com)  \nSAFETY    \n\n|  | All safety circuits are wired where if failure occurs machine will not start |\n| --- | --- |\n| |  |\n|  |  |\n\n\n|  | All e-stops work when pressed and machine stops immediately upon pressed |\n| --- | --- |\n| |  |\n|  |  |\n\n\n|  | Main power switch is interlocked |\n| --- | --- |\n| |  |\n|  |  |\n\n\n|  | There is complete guarding protecting moving components |\n| --- | --- |\n| |  |\n|  |  |\n\n\n|  | The machine is free from sharp protrusions which may cause possible injury |\n| --- | --- |\n| |  |\n|  |  |\n\n\n|  | Machine stops when any of all guard doors are open |\n| --- | --- |\n| |  |\n|  |  |\n\nAll lower machine guarding is permanently ﬁxed requiring tools or has safety interlocks  \n03 | The Ultimate Checklist for Efﬁcient FAT and SAT Testing +1 (450) [562-0745 | www.orientech.com](562-0745 | www.orientech.com)  \nELECTRICAL  \n|  | Level sensors work (low and high when applicable) |\n| --- | --- |\n| |  |\n|  |  |\n\n\n|  | Counter counts every piece correctly and does not overcount |\n| --- | --- |\n| |  |\n|  |  |\n\nCounter keeps memory if power is lost  \nNo programs are lost when machine is power cycled  \nAll wires are numbered  \nBreakdown/installation hook-ups indicated  \nCopy of electrical drawings in electrical enclosure  \n04 | The Ultimate Checklist for Efﬁcient FAT and SAT Testing +1 (450) [562-0745 | www.orientech.com](562-0745 | www.orientech.com)  \nMACHINE  \n|  | Tooling is acceptable |\n| --- | --- |\n| |  |\n|  |  |\n\nEverything that is adjustable deemed not necessary should be doweled  \n\n|  | Spindle does not stick |\n| --- | --- |\n| |  |\n|  |  |\n\nBox diverter working is working acceptable and keeps position if power is lost  \n\n|  | Box shifter is working acceptable |\n| --- | --- |\n| |  |\n|  |  |\n\n\n|  | All mechanical designs of machine are acceptable |\n| --- | --- |\n| |  |\n|  |  |\n\nFeeder and machine have consistent feeding and neither outrun the other  \n All alarms are properly triggered and displayed within HMIs  \n05 | The Ultimate Checklist for Efﬁcient FAT and SAT Testing +1 (450) [562-0745 | www.orientech.com](562-0745 | www.orientech.com)  \nDEFECTIVE PART DETECTING  \n|  | Rejected parts are consistent |\n| --- | --- |\n| |  |\n|  |  |\n\n\n|  | Machine stops after 3 consecutive rejects |\n| --- | --- |\n| |  |\n|  |  |\n\n\n|  | Reject mechanism is fail proof |\n| --- | --- |\n| |  |\n|  |  |\n\n\n|  | Parts inspection: sensors are working correctly |\n| --- | --- |\n| |  |\n|  |  |\n\nVISION  \n\n|  | Camera bracket(s) supplied are acceptable |\n| --- | --- |\n| |  |\n|  |  |\n\n\n|  | PLC is programmed for trigger, reject, and inputs |\n| --- | --- |\n| |  |\n|  |  |\n\n\n|  | Machine ha","cbCaimPPxzeFT6dV","https://ap.wps.com/l/cbCaimPPxzeFT6dV","pdf",1004677,"English","# Visual Appearance\n# Safety\n# Electrical\n# Machine\n# Defective Part Detecting\n## Vision\n# Runoff Criteria\n# Signoff\n# Special Notes\n# Printable Checklist","[{\"question\":\"What electrical and machine functions are checked for FAT/SAT readiness?\",\"answer\":\"It validates level sensor operation, correct counter behavior without overcounting, memory retention after power loss, numbered wiring, and inclusion of electrical drawings in the electrical enclosure. For the machine, it confirms acceptable tooling, spindle performance, proper diverter and shifter operation, mechanically acceptable designs, consistent feeding, correctly triggered alarms in HMIs, and fail-safe reject-related behavior where applicable.\"}]","THE ULTIMATE CHECKLIST FOR EFFICIENT FAT and SAT TESTING AUTOMATION SYSTEMS APPROVAL - Checklist | PDF",1789412956,25]