[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-648504-105":59,"doc-detail-648504-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","tanathi-water-works-development-agency-volume-iv-drawings-construction-of-kiambere-mwingi-phase-v-last-mile-connectivity-rehabilitation-of-migwani-water-supply-project-tender-no-tawwda0202024-2025-february-2025","TANATHI WATER WORKS DEVELOPMENT AGENCY - VOLUME IV - DRAWINGS - Construction of Kiambere-Mwingi Phase V Last Mile Connectivity (Rehabilitation of Migwani) Water Supply Project - Tender No: TAWWDA/020/2024-2025 - February 2025","","Tender drawings for the Tanathi Water Works Development Agency’s “Construction of Kiambere-Mwingi Phase V Last Mile Connectivity (Rehabilitation of Migwani) Water Supply Project” are provided as Volume IV. The material includes project signboard and multiple water kiosk (Type Closed) prefabricated sections, with detailed specifications for steel framing around a 10,000 lts capacity water tank, drainage and foundation elements, concrete paving, roof and floor finishes, and dimensions for structural and service components. Document references include tender number TAWWDA/020/2024-2025 and date February 2025, listing designer, checker, and approving authorities.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":35,"@type":76,"position":81},"https://docshare.wps.com/document/healthcare/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/tanathi-water-works-development-agency-volume-iv-drawings-construction-of-kiambere-mwingi-phase-v-last-mile-connectivity-rehabilitation-of-migwani-water-supply-project-tender-no-tawwda0202024-2025-february-2025/648504/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/tanathi-water-works-development-agency-volume-iv-drawings-construction-of-kiambere-mwingi-phase-v-last-mile-connectivity-rehabilitation-of-migwani-water-supply-project-tender-no-tawwda0202024-2025-february-2025/648504.png","ImageObject",300,407,{"name":92,"@type":93},"Aran","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-11-10","2026-10-23",true,{"@type":102,"interactionType":103,"userInteractionCount":24},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What project is covered in this Volume IV drawing set?","Question",{"text":112,"@type":113},"The drawings cover the “Construction of Kiambere-Mwingi Phase V Last Mile Connectivity (Rehabilitation of Migwani) Water Supply Project” by Tanathi Water Works Development Agency.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What is the tender number and date shown on the document?",{"text":117,"@type":113},"The tender number is TAWWDA/020/2024-2025 and the document date is February 2025.",{"name":119,"@type":110,"acceptedAnswer":120},"What type of water kiosk drawings are included?",{"text":121,"@type":113},"Included drawings specify a “Water Kiosk (Type Closed) Prefabricated” with sections such as water drip detail and ARC drawing references.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},648504,1793005848,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":34,"category_name":35,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":24,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":144,"read_time":145,"preview_page_count":4},137455076865,"https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","TANATHI WATER WORKS DEVELOPMENT  \nAGENCY  \nVOLUME IV  \nDRAWINGS  \nCONSTRUCTION OF KIAMBERE-MWINGI PHASE V LAST MILE CONNECTIVITY (REHABILITATION OF MIGWANI) WATER  \nSUPPLY PROJECT  \nTENDER No: TAWWDA/020/2024-2025  \nDATE: FEBRUARY 2025  \nEmployer:  \nThe Chief Executive Officer,  \nTanathi Water Works Development Agency,  \nP. O. Box Private Bag  \nKITUI  \n\n|  |  |  |  |  |  |  |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n|  | PROJECT SIGNBOARD\u003Cbr>1.2m\u003Cbr>\u003Cbr> TANATHI  WATER WORKS DEVELOPMENT AGENCY\u003Cbr>CONSTRUCTION OF KIAMBERE-MWINGI\u003Cbr>LAST MILE CONNECTIVITY PHASE V (REHABILITATION OF MIGWANI) WATER SUPPLY PROJECT\u003Cbr>FUNDED BY:\u003Cbr>MINISTRY OF WATER &SANITATION AND IRRIGATION\u003Cbr> STEEL PLATE WRITTEN\u003Cbr>ON BOTH SIDES.\u003Cbr>2.7m\u003Cbr>\u003Cbr>1 1/2\" X 1 1/2\"\u003Cbr>SQ TUBES\u003Cbr>(TO BE USED THROUGH OUT)\u003Cbr>\u003Cbr>0.5m\u003Cbr>\u003Cbr>~~ ~~ GROUND LEVEL\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>EMBEDDED IN CONCRETE (1:3:6)\u003Cbr>NB: Hole size to be 0.3m\u003Cbr>DIMENSIONS TO BE USED AS SHOWN\u003Cbr>Design Works\\Rehabilitation of Migwani Bid documents\\MIGWANI\u003Cbr>TANATHI WATER WORKS DEVELOPMENT AGENCY PROJECT NAME: REHABILITATION OF MIGWANI BOREHOLE WATER SUPPLY PROJECT Date 3/12/2024 Designed by K.M Drawn by K.M Checked by\u003Cbr>Approved by Eng. D. M\u003Cbr>Eng. F. S\u003Cbr>GABION SIGNBOARD.dwg, |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |\n\nD:\\2024-Tanathi 07/01/2025 12:56:0  \n600 x 600 x 50 mm conc. paving slab around the external wall  \nX        \n(pg 03 )  \nRC column   to details  \n200 x 200mm  \nRC column   \ndrainage grooves  \n800mm high masonry wall plastered to approval  \n300 x 300mm GT to detail (pg  \n150mm dia draining pipe to soak away pit  \nlockable steel window  \nY  \n2,100  \n200 1,700 200  \nTimber Shelves  \n300 200  \n200 350 1,000 350 200  \n350 250 500 250 350  \n2,150  \n)  \n| \u003Cbr>Project Title:\u003Cbr>WATER KIOSK\u003Cbr>(Type Closed) PREFABRICATED\u003Cbr>| Client:\u003Cbr>TAWDDA\u003Cbr>| | | \u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>Designed By\u003Cbr>E.O.K | \u003Cbr>Checked By\u003Cbr>D.M\u003Cbr>Approved by\u003Cbr>F.K.S\u003Cbr>Signature...........................\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>| \u003Cbr>Scale 1 : 20 Date:\u003Cbr>FEBRUARY 2009 page 01 |\n| --- | --- | --- | --- | --- | --- | --- |\n\nSteel frame surrounding the  \n10,000 lts capacity water tankto manufacture specification  \n  100 x 100 x 3mm steel square sections fix to column  \nfloater detail to manufacture specification  \n|  |\n| --- |\n|  |\n|  |\n|  |\n|  |\n\n25mm dia. overflow GI pipe fix to approval  \n50 x 100 x 3mm steel rectangular sections spaced at 350mm c/c to form a square platform of 2000 x 2000mm  \n600 x 600 x 50 mm conc. paving slab around the external wall  \ntank to prevent from theft detail (pg 10 )  \n200mm foundation wall on (600x200) strip footing to Eng's details (pg STR 02 ) . foundation to be determined on site  \nwater drip detail  \n450 x 200mm RC beam to detail (pg STR 06 )  \nScreed floor finish on 100mm RC floor slab, 150mm thick hand packed well compacted hardcore with murram blinding on compact earth dpc to be provided under all ground floor walls treated the sub base soil with anti termite  \nSECTION-X  \nwater  \ndrip  \ndetail  \nPV  \n4  \n6  \n8  \n2  \n1  \n4  \n2  \n450  \n150  \n300  \n2,400  \n650  \n700  \n1,200 400  \n800 400 1,000  \n100  \n100 300  \n| \u003Cbr>WATER KIOSK\u003Cbr>(Type Closed)\u003Cbr>PREFABRICATED | Client:\u003Cbr>TAWWDA\u003Cbr>| drg title:\u003Cbr>SECTION\u003Cbr>\u003Cbr>ARC 02 | | \u003Cbr>\u003Cbr>\u003Cbr>\u003Cb","cbCaieUiQ9cpOMDw","https://ap.wps.com/l/cbCaieUiQ9cpOMDw","pdf",1358333,22,"English","# Project Signboard\n# Water Kiosk - (Type Closed) Prefabricated\n## Section-X - Water Drip Detail (ARC 02)\n## Section-Y - Water Drip Detail (ARC 03)","[{\"question\":\"What project is covered in this Volume IV drawing set?\",\"answer\":\"The drawings cover the “Construction of Kiambere-Mwingi Phase V Last Mile Connectivity (Rehabilitation of Migwani) Water Supply Project” by Tanathi Water Works Development Agency.\"},{\"question\":\"What is the tender number and date shown on the document?\",\"answer\":\"The tender number is TAWWDA/020/2024-2025 and the document date is February 2025.\"},{\"question\":\"What type of water kiosk drawings are included?\",\"answer\":\"Included drawings specify a “Water Kiosk (Type Closed) Prefabricated” with sections such as water drip detail and ARC drawing references.\"}]","TANATHI WATER WORKS DEVELOPMENT AGENCY - VOLUME IV - DRAWINGS - Construction of Kiambere-Mwingi Phase V Last Mile Connectivity (Rehabilitation of Migwani) Water Supply Project - Tender No: TAWWDA/020/2024-2025 - February 2025 | PDF",1792793792,55]