[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-653839-105":3,"detail-sidebar-cat-0-en-105":81,"doc-detail-653839-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","survivor-flattop-truck-scale-installation-manual-rev-e","SURVIVOR - Flattop Truck Scale - Installation Manual - Rev E","","Installation manual for the SURVIVOR OTR Flattop Truck Scale, covering end-to-end deployment from site preparation to final calibration. Provides safety guidance, installation procedures for both steel and concrete deck options, deck module assembly, foundation and foundation slab cure timing, and loading cell mount installation. Includes load cell wiring, concrete pouring, finishing, and curing, electrical/electronic equipment connections, transient protection, trimming and calibration with test weights, serial tag handling, load cell replacement, and preventative maintenance.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/technology/","Technology",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/survivor-flattop-truck-scale-installation-manual-rev-e/653839/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/survivor-flattop-truck-scale-installation-manual-rev-e/653839.png","ImageObject",300,407,{"name":42,"@type":43},"miraaa_2004","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-30","2026-10-25",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",7,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What safety topics are covered before installation?","Question",{"text":63,"@type":64},"The manual includes a dedicated safety section under the introduction to guide safe installation practices.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"How does the manual handle different deck types during installation?",{"text":68,"@type":64},"It provides separate procedures for steel deck and concrete deck installations, including recommended tools, lifting/handling steps, and temporary setting blocks for each option.",{"name":70,"@type":61,"acceptedAnswer":71},"What steps are required to complete calibration after wiring and assembly?",{"text":72,"@type":64},"After assembling modules and wiring the load cells, the manual guides concrete deck pouring and curing (when applicable), then covers trimming individual cells or paired sections and calibration with test weights, followed by serial tag handling.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},653839,1793051401,{"code":4,"msg":82,"data":83},"success",[84,88,92,96,101,105,109,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":89,"show_sort_weight":90,"slug":91},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":93,"show_sort_weight":94,"slug":95},"Exam",70,"exam",{"id":97,"doc_module":4,"doc_module_name":25,"category_name":98,"show_sort_weight":99,"slug":100},5,"Comic",60,"comic",{"id":102,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":103,"slug":104},6,50,"technology",{"id":55,"doc_module":4,"doc_module_name":25,"category_name":106,"show_sort_weight":107,"slug":108},"Healthcare",40,"healthcare",{"id":110,"doc_module":4,"doc_module_name":25,"category_name":111,"show_sort_weight":112,"slug":113},8,"Research & Report",30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":97,"slug":129},19,"General","general",{"code":4,"msg":82,"data":131},{"doc_id":79,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":102,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":139,"language":140,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":12,"update_tm":144,"read_time":145},962094249165,"https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","Presented By  \nDallas Ft Worth Austin Houston  \n[NicolScales. com](NicolScales. com)  \n800.225.8181  \nContact Us  \nNicol Scales & Measurement is an ISO Accredited Calibration Company that has provided calibration, repair and sales of all types of weighing and measurement products since 1931.  \nSURVIVOR® OTR  \nFlattop Truck Scale  \nInstallation Manual  \n53831  \nRev E  \nContents  \n1.0 Introduction.................................................................................................................................. 1  \n1.1 Safety ........................................................................ 1  \n2.0 Installation ................................................................................................................................... 2  \n2.1 Foundation Slab Cure Period ....................................................... 2  \n2.2 Assembly Time Estimates ......................................................... 2  \n2.3 Recommended Equipment and Tools (Steel Deck) ...................................... 2  \n2.4 Lifting and Handling (Steel Deck) .................................................... 3  \n2.5 Temporary Setting Blocks (Steel Deck) ............................................... 3  \n2.6 Recommended Equipment and Tools (Concrete Deck) ................................... 4  \n2.7 Lifting and Handling (Concrete Deck) ................................................. 4  \n2.8 Temporary Setting Blocks (Concrete Deck) ............................................ 5  \n3.0 Assemble Deck Modules ............................................................................................................. 6  \n3.1 Place End Module A ............................................................. 7  \n3.2 Place and Attach Adjoining Modules B and C .......................................... 8  \n3.3 Raise Deck and Level with Approaches ............................................... 9  \n4.0 Load Cell Mount Installation...................................................................................................... 10  \n4.1 Install Baseplate and Load Cell .................................................... 10  \n4.2 Mount Block and Shim (Groutless) Installation (Option 1) ................................. 12  \n4.3 Mount Block and Grout Installation (Option 2) ......................................... 14  \n5.0 Load Cell Wiring ........................................................................................................................ 16  \n6.0 Pour, Finish, and Cure Concrete Deck ....................................................................................... 19  \n6.1 Concrete Specifications .......................................................... 19  \n6.2 Pour and Finish Concrete Deck .................................................... 19  \n6.3 Moist-Cure Concrete Deck ....................................................... 20  \n7.0 Connecting Electronic Equipment ............................................................................................. 21  \n7.1 Indicator to Peripherals .......................................................... 21  \n7.2 Single-Point Ground Conductor .................................................... 21  \n7.3 J-box Connections ............................................................. 21  \n7.4 Electrical Ground Connections ..................................................... 22  \n7.5 Installing Transient Protection ..................................................... 24  \n8.0 Trimming and Calibration .......................................................................................................... 25  \n8.1 Overview and Equipment Required ................................................. 25  \n8.2 Trimming Individual Cells ......................................................... 25  \n8.3 Trimming Paired Sections ........................................................ 27  \n8.4 Calibration with Test Weights .................................","cbCaimh5P7VML8mX","https://ap.wps.com/l/cbCaimh5P7VML8mX","pdf",6802021,39,"English","# 1.0 Introduction\n## 1.1 Safety\n# 2.0 Installation\n## 2.1 Foundation Slab Cure Period\n## 2.2 Assembly Time Estimates\n## 2.3 Recommended Equipment and Tools (Steel Deck)\n## 2.4 Lifting and Handling (Steel Deck)\n## 2.5 Temporary Setting Blocks (Steel Deck)\n## 2.6 Recommended Equipment and Tools (Concrete Deck)\n## 2.7 Lifting and Handling (Concrete Deck)\n## 2.8 Temporary Setting Blocks (Concrete Deck)\n# 3.0 Assemble Deck Modules\n## 3.1 Place End Module A\n## 3.2 Place and Attach Adjoining Modules B and C\n## 3.3 Raise Deck and Level with Approaches\n# 4.0 Load Cell Mount Installation\n## 4.1 Install Baseplate and Load Cell\n## 4.2 Mount Block and Shim (Groutless) Installation (Option 1)\n## 4.3 Mount Block and Grout Installation (Option 2)\n# 5.0 Load Cell Wiring\n# 6.0 Pour, Finish, and Cure Concrete Deck\n## 6.1 Concrete Specifications\n## 6.2 Pour and Finish Concrete Deck\n## 6.3 Moist-Cure Concrete Deck\n# 7.0 Connecting Electronic Equipment\n## 7.1 Indicator to Peripherals\n## 7.2 Single-Point Ground Conductor\n## 7.3 J-box Connections\n## 7.4 Electrical Ground Connections\n## 7.5 Installing Transient Protection\n# 8.0 Trimming and Calibration\n## 8.1 Overview and Equipment Required\n## 8.2 Trimming Individual Cells\n## 8.3 Trimming Paired Sections\n## 8.4 Calibration with Test Weights\n## 8.5 Serial Tag\n# 9.0 Load Cell Replacement\n# 10.0 Preventative Maintenance\n## 10.1 Weighbridge\n## 10.2 Foundation\n## 10.3 Load Cells\n## 10.4 Junction Box\n## 10.5 Grounding\n## 10.6 Calibration and Testing","[{\"question\":\"What safety topics are covered before installation?\",\"answer\":\"The manual includes a dedicated safety section under the introduction to guide safe installation practices.\"},{\"question\":\"How does the manual handle different deck types during installation?\",\"answer\":\"It provides separate procedures for steel deck and concrete deck installations, including recommended tools, lifting/handling steps, and temporary setting blocks for each option.\"},{\"question\":\"What steps are required to complete calibration after wiring and assembly?\",\"answer\":\"After assembling modules and wiring the load cells, the manual guides concrete deck pouring and curing (when applicable), then covers trimming individual cells or paired sections and calibration with test weights, followed by serial tag handling.\"}]","SURVIVOR - Flattop Truck Scale - Installation Manual - Rev E | PDF",1792900782,98]