[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-649568-105":3,"detail-sidebar-cat-0-en-105":80,"doc-detail-649568-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","suny-ecc-campus-2022-gleasner-hall-dry-memorial-library-exterior-rehab-addendum-1","SUNY ECC Campus 2022 Gleasner Hall & Dry Memorial Library Exterior Rehab - Addendum #1","","Addendum #1 provides formal responses and contract document modifications for the SUNY ECC Campus 2022 Gleasner Hall & Dry Memorial Library Exterior Rehabilitation project (Project Owner: Erie County; Owner Project Number 2023-956-03A). It documents items covering a pre-bid site visit (agenda, sign-in, and handout), RFI question/response attachments, and revisions to the project manual, specifications, and drawings. Changes include prevailing wage schedule insertion, door and hardware updates, fan schedule and roof curb text revisions, added specification paragraphs, and replacement/removal scope for stone treads, windows, and exterior elements.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/suny-ecc-campus-2022-gleasner-hall-dry-memorial-library-exterior-rehab-addendum-1/649568/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/suny-ecc-campus-2022-gleasner-hall-dry-memorial-library-exterior-rehab-addendum-1/649568.png","ImageObject",300,407,{"name":42,"@type":43},"Oliver","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-25","2026-10-24",true,{"@type":52,"interactionType":53,"userInteractionCount":26},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"What is the purpose of Addendum #1 for the Dry Memorial Library exterior rehabilitation project?","Question",{"text":62,"@type":63},"Addendum #1 records responses to RFI/modifications to the contract documents for the project, including updates to manuals, specifications, and drawings.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"What pre-bid materials are referenced in Addendum #1?",{"text":67,"@type":63},"The addendum states that the agenda, sign-in sheet, and hand-out from the October 6 site visit are attached.",{"name":69,"@type":60,"acceptedAnswer":70},"Which contract document changes are included in the addendum?",{"text":71,"@type":63},"Included changes cover adding the prevailing wage schedule, revising door schedules and door hardware sets, updating specific drawings/specification sections, and adjusting exterior scope items such as windows, stairs, and fan/roof curb details.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},649568,1792919356,{"code":4,"msg":81,"data":82},"success",[83,87,91,95,100,105,110,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":84,"show_sort_weight":85,"slug":86},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":88,"show_sort_weight":89,"slug":90},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":92,"show_sort_weight":93,"slug":94},"Exam",70,"exam",{"id":96,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},5,"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},6,"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":107,"show_sort_weight":108,"slug":109},7,"Healthcare",40,"healthcare",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":112,"slug":113},8,30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":96,"slug":129},19,"General","general",{"code":4,"msg":81,"data":131},{"doc_id":78,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":111,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":26,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":139,"language":140,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":12,"update_tm":144,"read_time":145},8796095461610,"https://ap-avatar.wpscdn.com/davatar_276721f389ce27ea32af1340a28f341c","ADDENDUM\\#1  \n\n| Project Name   |  | SUNY ECC Campus 2022 Gleasner Hall &Dry Memorial Library  \u003Cbr>Exterior Rehab   |\n| --- | --- | --- |\n| Owner   |  | Erie County   |\n| Owner Project Number   |  | 2023-956-03A   |\n| Watts Project Number:   |  | 20220396   |\n| Date   |  | 10/10/2025   |\n| Addendum Number   |  | 1   |\n| Subject   |  | Response to RFI/Modifications to Contract Documents   |\n| Prepared By   |  | Leah Kiblin   |\n\n\n| Addendum Item Number:01  \u003Cbr>A pre-bid site visit was held on October 6th at 1:00 PM at Dry Memorial Library.Attached are the agenda,  \u003Cbr>sign-in sheet and hand-out from that meeting.   |\n| --- |\n\n\n| Addendum Item Number:02  \u003Cbr>RFI questions received between 9/29/2025 and 10/9/2025 with responses are included as an  \u003Cbr>attachment to this addendum.   |\n| --- |\n\n\n| Addendum Item Number:03  \u003Cbr>Modifications to Contract Documents:  \u003Cbr>Add “Prevailing Wage Schedule for Article8 Public Work Project”to Project Manual.  \u003Cbr>Revisions:  \u003Cbr>Add attached“PW-1 Prevailing Wage Schedule”to the Project Manual.   |\n| --- |\n\n\n| Addendum Item Number:04  \u003Cbr>Modifications to Contract Documents:  \u003Cbr>Door head Details updated in door schedule on sheet A8-200D.Door hardware set 12 added for Door 101.  \u003Cbr>Revisions:  \u003Cbr>Replace sheet A8-200D with attached sheet A8-200D dated 10/10/2025.   |\n| --- |\n\n\n| Addendum Item Number:05  \u003Cbr>Modifications to Contract Documents:  \u003Cbr>Add Door Hardware Set\\#12 to specification section 087100:  \u003Cbr>Revisions:  \u003Cbr>Replace specification section 087100 with attached specification section 087100 dated 10/10/2025.   |\n| --- |\n\nSUNY ECC Campus 2022 Gleasner Hall &Dry Memorial LibraryExterior Rehab:ADDENDUM\\#1  \n10/10/2025  \n\n| Addendum Item Number:06  \u003Cbr>Modifications to Contract Documents:  \u003Cbr>Replace(2)additional stone treads at rear entrance stairs.  \u003Cbr>Revisions:  \u003Cbr>Replace sheets AD-112D&A5-201D with attached sheets AD-112D&A5-201D dated 10/10/2025.   |\n| --- |\n\n\n| Addendum Item Number:07  \u003Cbr>Modifications to Contract Documents:  \u003Cbr>Replace (9)crawl space/basement windows.  \u003Cbr>Remove wall-mounted metal sculpture on north elevation.  \u003Cbr>Clarified patching/painting scope at specific masonry jambs.  \u003Cbr>Revisions:  \u003Cbr>Replace sheets HM-303,AD-301D,A3-101D,A8-301D,A8-302D&A8-303D with attached sheets HM-  \u003Cbr>303,AD-301D,A3-101D,A8-301D,A8-302D&A8-303D dated 10/10/2025.   |\n| --- |\n\n\n| Addendum Item Number:08  \u003Cbr>Modifications to Contract Documents:  \u003Cbr>DRAWING NO.H8-400D  \u003Cbr>Revisions:  \u003Cbr>Revise Dry Memorial Library -Fan Schedule,remark 1 to read as the following:“FURNISH 18”HIGH WIND  \u003Cbr>RATED CURB FOR INSTALLATION BY C-CONTRACTOR.THIS CONTRACTOR RESPONSIBLE FOR SECURING  \u003Cbr>EXHAUST FAN TO CURB TO MEET ALL NEW YORK STATE WIND RESTRAINT REQUIREMENTS.”  \u003Cbr>Add Dry Memorial Library -Fan Schedule,remark 4 to read as the following:“FURNISH 21”x21”ROOF  \u003Cbr>CURB TO MATCH EXISTING,FIELD VERIFY PRIOR TO RELEASE.PROVIDE CURB CAPADAPTER TO CONNECT  \u003Cbr>21”x21”CURB TO EXHAUST FAN.”   |\n| --- |\n\n\n| Addendum Item Number:09  \u003Cbr>Modifications to Contract Documents:  \u003Cbr>Add paragraph 2.2 per attached specification section“230509-Roof Curbs and Equipment Supports.”  \u003Cbr>Revisions:  \u003Cbr>Replace specification section 230509 with attached specification section 230509 dated 10/10/2025.   |\n| --- |\n\n\n| Addendum Item Number:10   |\n| --- |\n| Modifications to Contract Documents:   |\n| SPECIFICATION NO.260100-Basic Materials and Methods   |\n| Revisions:   |\n| Delete paragraph 1.2,A.   |\n| Delete paragraph 1.2,B.7.   |\n| Delete paragraph 2.8   |\n\nSUNY ECC Campus 2022 Gleasner Hall &Dry Memorial LibraryExterior Rehab:ADDENDUM\\#1  \n10/10/2025  \n# Attachments:\n\n1.Pre-bid Meeting Agenda,Sign-in Sheet and Hand-out “Project Goals for Contractors Quick ReferenceGuide”dated 10/6/2025.  \n2.RFI Questions and Responses  \n3.Prevailing Wage Schedule  \n4.Revised Specifications:  \n084113-Aluminum-Framed Entrances and Storefronts087100-Door Hardware230509-Roof Curbs and Equipment Supports  \n# 5.Revised ","cbCaiujGazlttvmJ","https://ap.wps.com/l/cbCaiujGazlttvmJ","pdf",14832580,129,"English","# Addendum Overview\n## Project Details\n## Addendum Items 01-10\n## Attachments and Revised Specifications\n## Revised Drawings","[{\"question\":\"What is the purpose of Addendum #1 for the Dry Memorial Library exterior rehabilitation project?\",\"answer\":\"Addendum #1 records responses to RFI/modifications to the contract documents for the project, including updates to manuals, specifications, and drawings.\"},{\"question\":\"What pre-bid materials are referenced in Addendum #1?\",\"answer\":\"The addendum states that the agenda, sign-in sheet, and hand-out from the October 6 site visit are attached.\"},{\"question\":\"Which contract document changes are included in the addendum?\",\"answer\":\"Included changes cover adding the prevailing wage schedule, revising door schedules and door hardware sets, updating specific drawings/specification sections, and adjusting exterior scope items such as windows, stairs, and fan/roof curb details.\"}]","SUNY ECC Campus 2022 Gleasner Hall & Dry Memorial Library Exterior Rehab - Addendum #1 | PDF",1792801951,325]