[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-648676-105":3,"detail-sidebar-cat-0-en-105":79,"doc-detail-648676-en":129},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":72,"head_meta":74,"extra_data":76,"updated_unix":78},105,"en","structural-steel-shop-drawings-2018-bridge-construction-inspection-school-learning-objectives","Structural Steel & Shop Drawings - 2018 Bridge Construction Inspection School - Learning Objectives","","Training content for structural steel and shop drawings within the 2018 bridge construction inspection school context. It outlines learning objectives spanning materials, working drawing submission and review, contractor responsibilities, fabrication procedure, workmanship, finishes, welds, straightening and curving, camber, bolt holes, handling and shipping with marking guidance, erection procedure with structural connections and falsework, finishing and protective coating, and measurement and payment. Reference specifications and steel shape examples support the instruction.",{"@graph":14,"@context":71},[15,34,54],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/exam/","Exam",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/structural-steel-shop-drawings-2018-bridge-construction-inspection-school-learning-objectives/648676/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":48,"encodingFormat":47,"isAccessibleForFree":49,"interactionStatistic":50},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/structural-steel-shop-drawings-2018-bridge-construction-inspection-school-learning-objectives/648676.png","ImageObject",300,407,{"name":42,"@type":43},"นรินทร์","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-23",true,{"@type":51,"interactionType":52,"userInteractionCount":4},"InteractionCounter",{"@type":53},"ViewAction",{"@type":55,"mainEntity":56},"FAQPage",[57,63,67],{"name":58,"@type":59,"acceptedAnswer":60},"What are the main learning objectives for the structural steel training?","Question",{"text":61,"@type":62},"The objectives cover materials; working drawings including shop drawing submission and review; fabrication procedure and workmanship including welds, straightening, and camber; handling and shipping; erection procedure and structural connections; finishing and protective coating; and measurement and payment.","Answer",{"name":64,"@type":59,"acceptedAnswer":65},"What guidance is given for shop drawing submission and review?",{"text":66,"@type":62},"The materials emphasize working drawings through shop drawing submission and shop drawing review, along with the contractor’s responsibilities.",{"name":68,"@type":59,"acceptedAnswer":69},"What welding requirements and checks are described?",{"text":70,"@type":62},"The content states that only welding or tack welds noted on the plans may be performed, partial penetration welds are not allowed, certain welding types require written pre-approval, and non-conforming welds identified by visual inspection or NDT must be repaired or removed, replaced, and reinspected. It also lists relevant AWS codes and certification expectations.","https://schema.org",{"og:url":32,"og:type":73,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":75,"canonical":32},"index,follow",{"doc_id":77,"site_id":7},648676,1792794563,{"code":4,"msg":80,"data":81},"success",[82,86,90,93,98,103,108,113,118,121,125],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":83,"show_sort_weight":84,"slug":85},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":87,"show_sort_weight":88,"slug":89},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":91,"slug":92},70,"exam",{"id":94,"doc_module":4,"doc_module_name":25,"category_name":95,"show_sort_weight":96,"slug":97},5,"Comic",60,"comic",{"id":99,"doc_module":4,"doc_module_name":25,"category_name":100,"show_sort_weight":101,"slug":102},6,"Technology",50,"technology",{"id":104,"doc_module":4,"doc_module_name":25,"category_name":105,"show_sort_weight":106,"slug":107},7,"Healthcare",40,"healthcare",{"id":109,"doc_module":4,"doc_module_name":25,"category_name":110,"show_sort_weight":111,"slug":112},8,"Research & Report",30,"research-report",{"id":114,"doc_module":4,"doc_module_name":25,"category_name":115,"show_sort_weight":116,"slug":117},9,"Religion & Spirituality",20,"religion-spirituality",{"id":116,"doc_module":4,"doc_module_name":25,"category_name":119,"show_sort_weight":116,"slug":120},"World Cup","world-cup",{"id":122,"doc_module":4,"doc_module_name":25,"category_name":123,"show_sort_weight":122,"slug":124},10,"Lifestyle","lifestyle",{"id":126,"doc_module":4,"doc_module_name":25,"category_name":127,"show_sort_weight":94,"slug":128},19,"General","general",{"code":4,"msg":80,"data":130},{"doc_id":77,"user_id":131,"nickname":42,"user_avatar":132,"doc_module":4,"category_id":33,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":133,"file_id":134,"file_url":135,"file_type":136,"file_size":137,"view_count":4,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":138,"language":139,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":12,"update_tm":78,"read_time":143},2336475104957,"https://ap-avatar.wpscdn.com/avatar/22000c4c6bd8a5076e1?x-image-process=image/resize,m_fixed,w_180,h_180&k=1787554080175789136","| |\n| --- |\n| Structural Steel & Shop Drawings\u003Cbr>2018 Bridge Construction Inspection School\u003Cbr>Eulogio “Jo” Javier II, P.E.\u003Cbr>VDOT Staunton District\u003Cbr>Assistant Structure & Bridge Engineer-Design |\n| |\n\n\n| | |\n| --- | --- |\n\n3  \n4  \n5 Structural Steel LEARNING OBJECTIVES:  \n•MATERIALS  \n•WORKING DRAWINGS:  \n• Shop Drawing Submission  \n• Shop Drawing Review  \n• Contractor’s Responsibility  \n•FABRICATION PROCEDURE  \n• Workmanship, Finish, Fabrication and Welds  \n• Straightening and Curving  \n• Camber Procedures  \n• Bolt Holes  \n6 Structural Steel  \nLEARNING OBJECTIVES:  \n•HANDLING, STORING and SHIPPING MATERIALS:  \n• Marking & Shipping according to Erection Diagram  \n• Delivery Inspection and Checklist  \n•ERECTION PROCEDURE  \n• Structural Connections  \n• Bolt Tension  \n• Falsework  \n• Finishing and Protective Coating  \n•MEASUREMENT and PAYMENT:  \n7  \nShopdrawings  \nLEARNING OBJECTIVES:  \n•STRUCTURAL PLANS & SHOPDRAWINGS:  \n• Framing Plans  \n• Typical Transverse Section  \n• Permissible Field Splice  \n•STAY IN PLACE FORM  \n• Recommended SIP Detail (s)  \n• Applicable Plan Notes  \n8  \nREFERENCE SPECIFICATIONS:  \n•Section 101  \nDEFINITIONS OF ABBREVIATIONS, ACRONYMS and TERMS  \n•Section 105.10  \nPLANS and WORKING DRAWINGS  \n•Section 107.17  \nCONSTRUCTION SAFETY and HEALTH STANDARD  \n•Section 226  \nSTRUCTURAL STEEL  \n•Section 233  \nGALVANIZING  \n•Section 228  \nSTEEL PILES  \n•Section 407  \nSTEEL and OTHER STRUCTURES  \n•Section 411  \nPROTECTIVE COATING OF METAL IN STRUCTURES  \nStructural Steel  \nMaterial-Section 407.02 Structural Steel  \nShapes  \n•Section 226 / pp:230  \n•ASTM A709 (Grade 36 or Grade 50W ) Unpainted.  \n| |  | |\n| --- | --- | --- |\n| | |  |\n| Rolled Beam |  |  |\n\n\n| \u003Cbr>\u003Cbr>Structural Steel\u003Cbr>S Shape Standard Beam\u003Cbr>S 24 x 106\u003Cbr>Weight = 106 lbs. / LF Depth = 24”\u003Cbr>Bf = Flange Width = 7 7/8”\u003Cbr>\u003Cbr>\u003Cbr>7 7/8”\u003Cbr>D |  |\n| --- | --- |\n| | |\n\n\n| |  | |\n| --- | --- | --- |\n| | |  |\n\n\n| \u003Cbr>Angle Shape\u003Cbr>L 5 x 3 x 3/8”\u003Cbr>Leg Dimension = 5” & 3” | Structural Steel |  |  |\n| --- | --- | --- | --- |\n|  | |  | |\n| |  | |  |\n\nStructural Steel  \nSteel Plate Shape  \nPL 9/16 x 32  \n| \u003Cbr>Section 228\u003Cbr>HP 10 x 42 Weight = 42 lbs / LF Depth = 10” = Width | Structural Steel |  |  |\n| --- | --- | --- | --- |\n|  | |  | |\n| |  | |  |\n\n\n| | Structural Steel |\n| --- | --- |\n| Fabrication Procedures Section 407.04\u003Cbr>•Workmanship, Finish and Fabrication Tolerance\u003Cbr>•Complex Coating\u003Cbr>•Fabrication and Welding\u003Cbr>• Fracture Critical Components\u003Cbr>• Other Structural and Miscellaneous Steel\u003Cbr>• Welds\u003Cbr>• Straightening and Curving\u003Cbr>• Camber\u003Cbr>• Bolt Holes\u003Cbr>• Stud Shear Connectors |  |\n\n\n| | Structural Steel |\n| --- | --- |\n| Fabrication Procedures Section 407.04\u003Cbr>• Shop Assembly\u003Cbr>• Inspection |  |\n\nStructural Steel  \nFabrication:  \nWelds-Section 407.04 (a)  \n•Only welding or tack weld noted on the plans shall be performed Welds  \n• Partial penetration weld shall not be allowed.  \n• Electro-slag and Electro-gas welding shall be pre-approval in writing  \n• “Structural units shall not be used  \nas worktable. Welding on other  \nwork shall be completed before parts are installed on units”  \n•Weld Checks :  \n• Non-conforming welds determined by visual inspection or NDT  \n• Shall be repaired if not possible shall be removed, replaced and reinspected.  \n•Groove Weld shallbe Ground Flush. Fillet Weld  \nStructural Steel  \nWelds  \n•Certification :  \n• Certificate of qualification shall befor each welder, welding operator of tacker  \n• Certificate of qualification shall not exceed more that 3 months without performing satisfactory welding process.  \n• Qualification shall state Name / Name and tittle who conducted the examination and result of test.  \n• Other applicable AWS codes:  \n• AWS D1 .4 = welds for rebars, include tack welds  \n• AWS D1 .2 = Welding for Aluminum  \n• AWS D1 .1 = Welding for Tubular Structures  \nWeld Symbols  \n\n| \u003Cbr>Structural Steel\u003Cbr>Types of Structural Welds |  |\n| --- | --- |\n| | |","cbCaijBDzeqQaAfP","https://ap.wps.com/l/cbCaijBDzeqQaAfP","pdf",3187681,43,"English","# Structural Steel LEARNING OBJECTIVES\n## Materials and working drawings\n## Shop drawing submission and review\n## Handling, storing, shipping materials\n## Erection procedure and structural connections\n## Fabrication procedures, welds, and camber\n## Measurement and payment\n## Reference specifications and steel shapes","[{\"question\":\"What are the main learning objectives for the structural steel training?\",\"answer\":\"The objectives cover materials; working drawings including shop drawing submission and review; fabrication procedure and workmanship including welds, straightening, and camber; handling and shipping; erection procedure and structural connections; finishing and protective coating; and measurement and payment.\"},{\"question\":\"What guidance is given for shop drawing submission and review?\",\"answer\":\"The materials emphasize working drawings through shop drawing submission and shop drawing review, along with the contractor’s responsibilities.\"},{\"question\":\"What welding requirements and checks are described?\",\"answer\":\"The content states that only welding or tack welds noted on the plans may be performed, partial penetration welds are not allowed, certain welding types require written pre-approval, and non-conforming welds identified by visual inspection or NDT must be repaired or removed, replaced, and reinspected. It also lists relevant AWS codes and certification expectations.\"}]","Structural Steel & Shop Drawings - 2018 Bridge Construction Inspection School - Learning Objectives | PDF",108]