[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-648677-105":59,"doc-detail-648677-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","structural-and-utility-shop-drawing-review-process-designbuild-projects","STRUCTURAL AND UTILITY SHOP DRAWING REVIEW PROCESS - Designbuild projects","","Defines the Structural and Utility Shop Drawing Review Process for design-build projects, supplementing shop plan submittal procedures and review timelines in the SCDOT Supplemental Specification “Shop Plans and Working Drawings for Structures” dated 1/1/2023. Covers requirements for obtaining Railroad approval, notifying SCDOT Office of Materials and Research 14 calendar days before fabrication, and prohibiting fabrication before SCDOT approval. Provides definitions for Structural, Traffic, Utility Shop Plans, and Working Drawings, plus package grouping rules, item categorization, and example package compositions.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/structural-and-utility-shop-drawing-review-process-designbuild-projects/648677/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/structural-and-utility-shop-drawing-review-process-designbuild-projects/648677.png","ImageObject",300,407,{"name":92,"@type":93},"Bintang","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-24","2026-10-23",true,{"@type":102,"interactionType":103,"userInteractionCount":8},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"When must Railroad approval be obtained for shop plan items?","Question",{"text":112,"@type":113},"Obtain Railroad approval for any items requiring Railroad review before submitting to SCDOT.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What is the minimum notice period to SCDOT OMR before starting fabrication?",{"text":117,"@type":113},"Notify the SCDOT Office of Materials and Research (OMR) at least 14 calendar days prior to the start of fabrication, and do not begin fabrication or construction until SCDOT approval is received.",{"name":119,"@type":110,"acceptedAnswer":120},"How are shop plans grouped into packages during submittal?",{"text":121,"@type":113},"Multiple shop plan submittals may be grouped into a package based on item type or applicable structure; items submitted individually outside the defined package are treated as their own package and follow the timeline and flowchart described in the document.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},648677,1792876127,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":8,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":24,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":143,"read_time":144},962085564381,"https://ap-avatar.wpscdn.com/davatar_6f874abed73319feea01a86fa6f0fab8","STRUCTURAL AND UTILITY SHOP DRAWING REVIEW PROCESS  \nThe following requirements supplement the shop plan submittal procedures and review timeline in ~~Section 725 of the SCDOT Standard Specifications~~the SCDOT Supplemental Specification “Shop Plans and Working Drawings for Structures”, dated 1/1/2023, for designbuild projects.  \nObtain Railroad approval, for any items requiring Railroad review, prior to submittal to SCDOT.  \nFollowing SCDOT shop plan approval, have the fabricator of the material component notify SCDOT Office of Materials and Research (OMR) a minimum of 14 calendar days prior to the start of fabrication. Do not begin fabrication or construction of any items prior to receiving SCDOT approval.  \n DEFINITIONS  \nStructural Shop Plans are shop plans and associated engineering calculations provided for fabricated items that will remain a permanent part of structures such as bridges, retaining walls, box culverts, non-standard drainage structures, and noise barrier walls. Structural shop plans are approved by a SCDOT Structural Design Engineer or designated consultant representative. Retaining walls, noise walls, and foundation designs are also reviewed and may be approved by a SCDOT Geotechnical Design Engineer or designated consultant representative.  \nTraffic Shop Plans are shop plans and associated engineering calculations provided for structures and foundations permanently supporting traffic control devices, such as overhead sign structures, extruded panel signs, I-beam posts, high mast light poles, signal poles/mast arms, and ITS structures. Traffic shop plans are not covered by this document and shall adhere to the ~~special provision~~technical provision attachment outlining the Traffic Shop Drawing Process.  \nUtility Shop Plans are shop plans and associated engineering calculations provided for permanent utility support structures and foundations, such as utility bridges and pump houses. Utility shop plans are typically provided for in-contract utility relocations and are approved by the SCDOT Construction Manager ~~for Mega Projects~~ (CM~~MP~~) or designated consultant representative, following approval from the utility owner. SCDOT will transmit the shop plans to the utility owner for review and approval. See TP Section 140~~RFP Exhibit 7 ~~for procedures pertaining to utility-owner review of engineering documents.  \nWorking Drawings are design drawings and associated engineering calculations for temporary structures such as temporary shoring walls and falsework/form systems. Working Drawings are approved by the CM, or designated consultant representative. Working drawing submittals are not covered by this document and shall adhere to the submittal timeline specified in section 725.1.2 of the Standard Specifications.  \nPACKAGES  \nIn order to expedite the review process, multiple shop plan submittals may be grouped together into the following options defining a “package”. Items shall be grouped into packages by item type or applicable structure. Shop Plans submitted individually (not in a package defined in the transmittal) will be considered its own package and subjected to the timeline and flowchart presented herein. Package review durations are defined in Section 3.  \nAcceptable Package options:  \n~~•~~ One (1) item from Category A ~~and up to two (2) items from Category B~~  \n• Up to ~~four (4)~~two (2) items from Category B  \n\n| CATEGORY A | CATEGORY B |\n| --- | --- |\n| • Structural Steel Girders 1, 4 | • Stay-In-Place Formwork2~~1~~\u003Cbr>21 43 |\n| • Prestressed Concrete Beams 1 | • Elastomeric Bearing Pads,  |\n| • Post-tensioning systems 1 | • Expansion Joint Systems2~~1~~ |\n| • MSE Walls3~~2~~ | • Closed Drainage Systems2~~1~~ |\n| • Soil-Nail Walls3~~2~~ | • Armor Plates2~~1~~, 4~~3~~ |\n| • Pile and Panel Walls3~~2~~ | • Anchor Bolts2~~1~~, 4~~3~~ |\n| • Noise Walls3~~2~~ | • Bearing/Sole Plates2~~1~~, 4~~3~~ |\n| • Precast Culverts | • Tie Rods2~~1~~, 4~~3~~ |\n| • Proprietary Retaining Wall Systems3~~2","cbCaie8kmsJ41RUt","https://ap.wps.com/l/cbCaie8kmsJ41RUt","pdf",1149713,"English","# Structural and Utility Shop Drawing Review Process\n## Applicability and Submission Requirements\n## Definitions\n## Package Options and Categorization\n## Review Timeline & Review Type","[{\"question\":\"When must Railroad approval be obtained for shop plan items?\",\"answer\":\"Obtain Railroad approval for any items requiring Railroad review before submitting to SCDOT.\"},{\"question\":\"What is the minimum notice period to SCDOT OMR before starting fabrication?\",\"answer\":\"Notify the SCDOT Office of Materials and Research (OMR) at least 14 calendar days prior to the start of fabrication, and do not begin fabrication or construction until SCDOT approval is received.\"},{\"question\":\"How are shop plans grouped into packages during submittal?\",\"answer\":\"Multiple shop plan submittals may be grouped into a package based on item type or applicable structure; items submitted individually outside the defined package are treated as their own package and follow the timeline and flowchart described in the document.\"}]","STRUCTURAL AND UTILITY SHOP DRAWING REVIEW PROCESS - Designbuild projects | PDF",1792794569,13]