[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-390945-105":3,"detail-sidebar-cat-0-en-105":81,"doc-detail-390945-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","state-bar-court-of-california-review-department-order-and-response-to-motion-for-extension-of-time-to-take-mpre-case-no-07-0-12571","State Bar Court of California Review Department - Order and Response to Motion for Extension of Time to Take MPRE - Case No. 07-0-12571","","Court filings in the State Bar Court of California, Review Department, concerning respondent Teresa Straley (State Bar member number 248299) and case No. 07-0-12571. The record grants an extension of time to take and pass the Multistate Professional Responsibility Examination (MPRE), sets a deadline to provide proof of passage, and states no further extensions are contemplated. The Office of Probation does not oppose the request, providing justification tied to MPRE result timing and procedural steps for further motions if passage is not achieved.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/exam/","Exam",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/state-bar-court-of-california-review-department-order-and-response-to-motion-for-extension-of-time-to-take-mpre-case-no-07-0-12571/390945/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/state-bar-court-of-california-review-department-order-and-response-to-motion-for-extension-of-time-to-take-mpre-case-no-07-0-12571/390945.png","ImageObject",300,407,{"name":42,"@type":43},"Fans","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-31","2026-09-25",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",10,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What motion is addressed in the document?","Question",{"text":63,"@type":64},"The document concerns Teresa Straley’s motion for an extension of time to take and pass the MPRE.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"Does the Office of Probation oppose the requested extension?",{"text":68,"@type":64},"No. The Office of Probation states it does not oppose the motion.",{"name":70,"@type":61,"acceptedAnswer":71},"What is the stated deadline to provide proof of MPRE passage?",{"text":72,"@type":64},"The order states respondent has until May 13, 2014 to provide proof of passage.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},390945,1790814440,{"code":4,"msg":82,"data":83},"success",[84,88,92,95,100,105,110,115,120,123,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":89,"show_sort_weight":90,"slug":91},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":93,"slug":94},70,"exam",{"id":96,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},5,"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},6,"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":107,"show_sort_weight":108,"slug":109},7,"Healthcare",40,"healthcare",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":112,"show_sort_weight":113,"slug":114},8,"Research & Report",30,"research-report",{"id":116,"doc_module":4,"doc_module_name":25,"category_name":117,"show_sort_weight":118,"slug":119},9,"Religion & Spirituality",20,"religion-spirituality",{"id":118,"doc_module":4,"doc_module_name":25,"category_name":121,"show_sort_weight":118,"slug":122},"World Cup","world-cup",{"id":55,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":55,"slug":125},"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":96,"slug":129},19,"General","general",{"code":4,"msg":82,"data":131},{"doc_id":79,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":33,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":55,"language":139,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":12,"update_tm":143,"read_time":144,"preview_page_count":4},5909892330395,"https://ap-avatar.wpscdn.com/davatar_6f874abed73319feea01a86fa6f0fab8","FILED  \nMAR 212014  \nSTATE BAR COURT  \nCLERK'S OFFICE  \nLOS ANGELES  \n# STATE BAR COURT OF CALIFORNIAREVIEW DEPARTMENT\n\nIN BANK  \nCase No.07-0-12571  \nIn the Matter of  \n)  \nTERESA STRALEY,  \nORDER  \nA Member of the State Bar,No.248299.  \nOn March 11,2014,respondent filed a motion for extension of time to take and pass theMultistate Professional Responsibility Examination(MPRE).On March 12,2014,the Office ofProbation of the State Bar filed its response stating that it does not oppose respondent's motion.  \nFinding good cause,respondent's motion for an extension of time to take and pass theMPRE is granted.Respondent has until May 13,2014,to provide proof of passage.No furtherextensions are contemplated.  \n# CERTIFICATE OF SERVICE\n\n[Rules Proc.of State Bar;Rule 5.27(B);Code Civ.Proc.,§1013a(4)]  \nI am a Case Administrator of the State Bar Court.Iam over the age of eighteen and not a party tothe within proceeding.Pursuant to standard court practice,in the City and County of LosAngeles,on March 21,2014,I deposited a true copy of the following document(s):  \nORDER FILED MARCH 21,2014  \nin a sealed envelope for collection and mailing on that date as follows:  \n[X]  by first-class mail,with postage thereon fully prepaid,through the United States PostalService at Los Angeles,California,addressed as follows:  \nTERESA STRALEYTSTRALEYLAW5556S CENTINELA AVELOS ANGELES,CA 90066  \n[X]  by interoffice mail through a facility regularly maintained by the State Bar of Californiaaddressed as follows:  \nCHARLES T.CALIX,Enforcement,Los Angeles  \nI hereby certify that the foregoing is true and correct.Executed in Los Angeles,California,onMarch 21,2014.  \n1  \nTHE STATE BAR OF CALIFORNIAOFFICE OF PROBATIONTERRIE GOLDADE,No.155348SUPERVISING ATTORNEY845 South Figueroa Street  \nLos Angeles,California 90017-2515Telephone:(213)765-1000  \nSTATE BAR COURTREVIEW DEPARTMENT  \n)Case Nos.07-0-12571(S190541)  \nIn the Matter of:  \nTeresa Straley,  \n)Rule 9.10 Matterr  \nNo.248299,  \n)RESPONSE TO MOTION FOR EXTENSIONOF TIME TO TAKE MPRE  \nA Member of the State Bar  \nThe State Bar of California,Office of Probation,does not oppose Respondent's requestfor an extension of time to provide proof of passage of the MPRE to May 9,2014,which is the5 weeks it generally takes to receive MPRE results plus almost a week to file another motionfor modification should she not pass the March 29,2014 MPRE.  \nThis Response is made pursuant to rule 5.162,Rules of Procedure of the State Bar ofCalifornia,and is based upon Respondent's motion and all documents in the Court's file in thismatter.  \nRespectfully submitted,  \nTHE STATE BAR OF CALIFORNIAOFFICE OF PROBATION  \n化e  \nDated:  \nMarch 12,2014  \nBy:  \nDECLARATION OF SERVICE BY REGULAR MAIL  \nCASE NUMBER(s):07-0-12571(S190541)  \n1,the undersigned,over the age of eighteen(18)years,whose businessaddress and place of employment is the State Bar of California,1149 South Hill Street,Los Angeles,California 90015,declare that I am not a party to the within action;that Iam readily familiar with the State Bar of California's practice for collection andprocessing of correspondence for mailing with the United States Postal Service;that inthe ordinary course of the State Bar of California's practice,correspondence collectedand processed by the State Bar of California would be deposited with the United StatesPostal Service that same day;that I am aware that on motion of party served,serviceis presumed invalid if postal cancellation date or postage meter date on the envelopeor package is more than one day after date of deposit for mailing contained in theaffidavit;and that in accordance with the practice of the State Bar of California forcollection and processing of mail,I deposited or placed for collection and mailing in theCity and County of Los Angeles,on the date shown below,a true copy of the within  \nRule 9.10 MatterRESPONSE TO MOTION FOR EXTENSION OF TIME TO TAKE MPRE  \nin a sealed envelope placed for collection and mailing at Los Angeles,on","cbCainP3J7sOSBqe","https://ap.wps.com/l/cbCainP3J7sOSBqe","pdf",362557,"English","# Order\n## Certificate of Service\n# Response to Motion for Extension of Time to Take MPRE\n## Request","[{\"question\":\"What motion is addressed in the document?\",\"answer\":\"The document concerns Teresa Straley’s motion for an extension of time to take and pass the MPRE.\"},{\"question\":\"Does the Office of Probation oppose the requested extension?\",\"answer\":\"No. The Office of Probation states it does not oppose the motion.\"},{\"question\":\"What is the stated deadline to provide proof of MPRE passage?\",\"answer\":\"The order states respondent has until May 13, 2014 to provide proof of passage.\"}]","State Bar Court of California Review Department - Order and Response to Motion for Extension of Time to Take MPRE - Case No. 07-0-12571 | PDF",1790342347,25]