[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-296511-105":3,"detail-sidebar-cat-0-en-105":81,"doc-detail-296511-en":131},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","standard-specifications-for-road-and-bridge-works-2073-with-amendment-2075","STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE WORKS - 2073 With amendment 2075","","Government of Nepal Ministry of Physical Infrastructure and Transport, Department of Roads presents the Standard Specifications for Road and Bridge Works for 2073, including amendment 2075. The table of contents organizes technical requirements by work sections, starting with general provisions such as introduction, scope, traffic accommodation, surveying, access to properties, maintenance, site information, environmental protection, and measurement/payment notes. Subsequent sections cover site clearance, soil improvement, reinforced soil, soil nailing, fencing, and quality control procedures.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/standard-specifications-for-road-and-bridge-works-2073-with-amendment-2075/296511/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/standard-specifications-for-road-and-bridge-works-2073-with-amendment-2075/296511.png","ImageObject",300,407,{"name":42,"@type":43},"Skyler","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-11-12","2026-09-18",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",26,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What is the scope of the Standard Specifications for Road and Bridge Works (2073 with amendment 2075)?","Question",{"text":63,"@type":64},"The document provides standard requirements for road and bridge works, organized into sections covering general provisions, site clearance, soil improvement, fencing, quality control, and materials testing.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"Which general topics are addressed in Section 100?",{"text":68,"@type":64},"Section 100 covers introduction, definitions, scope of work, accommodation of traffic, survey and setting out, access to abutting properties, diversion bridges, maintenance of road, and environmental protection, along with measurement and payment notes.",{"name":70,"@type":61,"acceptedAnswer":71},"How does the document structure quality control requirements?",{"text":72,"@type":64},"Section 500 outlines the contractor’s responsibility for quality, the quality control system, field laboratory and testing procedures, trial and control testing during construction, acceptance tests, and a schedule of tests and quality assurance plan.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},296511,1789733173,{"code":4,"msg":82,"data":83},"success",[84,88,92,96,101,106,111,115,120,123,127],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":89,"show_sort_weight":90,"slug":91},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":93,"show_sort_weight":94,"slug":95},"Exam",70,"exam",{"id":97,"doc_module":4,"doc_module_name":25,"category_name":98,"show_sort_weight":99,"slug":100},5,"Comic",60,"comic",{"id":102,"doc_module":4,"doc_module_name":25,"category_name":103,"show_sort_weight":104,"slug":105},6,"Technology",50,"technology",{"id":107,"doc_module":4,"doc_module_name":25,"category_name":108,"show_sort_weight":109,"slug":110},7,"Healthcare",40,"healthcare",{"id":112,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":113,"slug":114},8,30,"research-report",{"id":116,"doc_module":4,"doc_module_name":25,"category_name":117,"show_sort_weight":118,"slug":119},9,"Religion & Spirituality",20,"religion-spirituality",{"id":118,"doc_module":4,"doc_module_name":25,"category_name":121,"show_sort_weight":118,"slug":122},"World Cup","world-cup",{"id":124,"doc_module":4,"doc_module_name":25,"category_name":125,"show_sort_weight":124,"slug":126},10,"Lifestyle","lifestyle",{"id":128,"doc_module":4,"doc_module_name":25,"category_name":129,"show_sort_weight":97,"slug":130},19,"General","general",{"code":4,"msg":82,"data":132},{"doc_id":79,"user_id":133,"nickname":42,"user_avatar":134,"doc_module":4,"category_id":112,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":135,"file_id":136,"file_url":137,"file_type":138,"file_size":139,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":140,"language":141,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":142,"faqs":143,"seo_title":144,"seo_description":12,"update_tm":80,"read_time":145,"preview_page_count":4},2336464648746,"https://ap-avatar.wpscdn.com/davatar_276721f389ce27ea32af1340a28f341c","Government of Nepal  \nMinistry of Physical Infrastructure and Transport  \nDepartment of Roads  \nSTANDARD SPECIFICATIONS  \nFOR  \nROAD AND BRIDGE WORKS  \n2073  \nWith amendment 2075  \nSTANDARD SPECIFICATIONS FOR ROAD AND BRIDGE WORKS  \nTable of Contents  \nSECTION 100: GENERAL  \nPAGE NO.  \n101 INTRODUCTION 1-1  \n102 DEFINITION 1-1  \n103 SCOPE OF WORK 1-1  \n104 ACCOMMODATION OF TRAFFIC 1-2  \n105 PUBLICLY AND PRIVATELY OWNED SERVICES 1-5  \n106 SURVEY AND SETTING OUT 1-6  \n107 ACCESS TO ABUTTING PROPERTIES 1-8  \n108 DIVERSION BRIDGES 1-8  \n109 MAINTENANCE OF ROAD 1-8  \n110 SITE INFORMATION 1-9  \n111 ENVIRONMENTAL PROTECTION WORKS 1-10  \n112 NOTES ABOUT MEASUREMENT AND PAYMENT 1-13  \n113 EQUIVALENCY OF STANDARDS 1-15  \n114 UNITS OF MEASUREMENT, ABBREVIATION AND TERMINOLOGY 1-16  \n115 PROGRAM 1-17  \n116 SUPPLY OF PROJECT RECORD 1-18  \nSECTION 200: SITE CLEARANCE  \nPAGE NO  \n201 CLEARING AND GRUBBING 2-1  \n202 DISMANTLING CULVERTS, BRIDGES, OTHER STRUCTURES AND PAVEMENT 2-4  \nSECTION 300: SOIL IMPROVEMENT  \nPAGE NO.  \n301 REINFORCED SOIL 3-1  \n302 SOIL NAILING 3-11  \nANNEXURE 300-1  \nA1 DESIGN AND DRAWINGS 3-18  \nA2 SPACING AND LAYOUT OF REINFORCEMENT IN REINFORCED  \nSOIL WALLS 3-20  \nA3 REINFORCED SOIL SLOPES 3-21  \ni  Page  \nSTANDARD SPECIFICATIONS FOR ROAD AND BRIDGE WORKS  \nTable of Contents  \nSECTION 400: FENCING  \nPAGE NO.  \n401 SCOPE 4-1  \n402 MATERIALS 4-1  \n403 INSTALLATION OF POST AND STANDARDS 4-2  \n404 INSTALLATION OF WIRE 4-2  \n405 INSTALLATION OF GATE 4-3  \n406 MEASUREMENT 4-3  \n407 PAYMENT 4-3  \nSECTION 500 – QUALITY CONTROL  \nPAGE NO.  \n501. SCOPE 5-1  \n502. CONTRACTOR RESPONSIBLE FOR THE QUALITY OF THE WORKS 5-1  \n503. QUALITY CONTROL SYSTEM 5-1  \n504. FIELD LABORATORY 5-2  \n505. TESTING PROCEDURES AND SETS OF TESTS 5-6  \n506. LABORATORY TRIALS TO CONFIRM COMPLIANCE WITH  \nSPECIFICATIONS 5-6  \n507. SITE TRIALS OR TRIAL SECTIONS 5-7  \n508. CONTROL TESTING DURING CONSTRUCTION 5-10  \n509. ACCEPTANCE TESTS FOR COMPLETED WORKS OR PARTS OF THE WORKS 5-10  \n510. SCHEDULE OF TESTS 5-11  \n511. QUALITY ASSURANCE PLAN 5-23  \nSECTION 600 – MATERIALS AND TESTING OF MATERIALS  \nPAGE NO.  \n601. SCOPE 6-1  \n602. QUALITY OF MATERIAL 6-1  \n603. SOURCES OF MATERIALS 6-1  \n604. INSPECTION AND ACCEPTANCE OF MATERIAL 6-1  \n605. MATERIALS AND MANUFACTURED ARTICLES 6-2  \nii  Page  \nSTANDARD SPECIFICATIONS FOR ROAD AND BRIDGE WORKS  \nTable of Contents  \nPAGE NO.  \n606. DEFECTIVE MATERIALS 6-2  \n607. TRADE NAMES AND ALTERNATIVES 6-2  \n608. FOREIGN MATERIALS 6-3  \n609. GENERAL: CLASSIFICATION OF MATERIAL 6-4  \n610. DEFINITION OF GENERAL TYPES OF MATERIALS 6-4  \n611. SIEVE 6-7  \n612. SOIL AND GRAVELS 6-7  \n613. STONE, AGGREGATE, SAND AND FILLERS 6-9  \n614. CEMENT 6-10  \n615. LIME 6-10  \n616. LIME TREATED MATERIALS 6-11  \n617. CONCRETE 6-11  \n618. BITUMINOUS BINDERS 6-12  \n619. BITUMEN EMULSION 6-15  \n620. STEEL 6-17  \n621. TESTING OF WELDS 6-18  \n622. PAINT FOR STRUCTURAL STEEL WORK 6-18  \n623. BRICKS 6-18  \n624. MORTAR 6-18  \n625. REINFORCED CONCRETE PIPES 6-18  \n626. HIGH DENSITY POLYTHENE PIPES 6-19  \n627. GEOTEXTILES 6-19  \n628. GEOGRID 6-19  \n629. TIMBER FOR STRUCTURAL WORKS 6-20  \n630. PAINT FOR ROAD MARKING 6-20  \n631. MANHOLE COVERS AND FRAMES 6-20  \n632. PRECAST CONCRETE CHANNELS 6-20  \n633. CAST IRON DRAINAGE GRATINGS 6-20  \n634. GABION 6-20  \n635. MEASUREMENT AND PAYMENT 6-20  \niii  Page  \nSTANDARD SPECIFICATIONS FOR ROAD AND BRIDGE WORKS  \nTable of Contents  \nSECTION 700: PIPE DRAINS, PIPE CULVERTS AND CONCRETE CHANNELS  \nPAGE NO  \n701. PIPE DRAINS AND PIPE CULVERTS 7-1  \n702. CONCRETE CHANNELLING 7-6  \n703. COMPLETION OF DRAINAGE WORKS 7-8  \nSECTION 800: TRANSPORTATION OF MATERIAL  \nPAGE NO  \n801 GENERAL 8-1  \n802 DEFINITIONS 8-1  \n803 LOCATING MATERIAL SOURCES 8-2  \n804 SAFETY AND PUBLIC HEALTH REQUIREMENTS 8-3  \n805 ACCESS ROADS AND TRAFFIC CONTROL 8-3  \n806 SITE CLEARANCE AND REMOVAL OF TOPSOIL AND OVERBURDEN 8-3  \n807 SELECTION OF MATERIALS 8-4  \n808 MEASUREMENT AND PAYMENT 8-4  \nSECTION 900: EARTHWORKS  \nPAGE NO.  \n901 SCOPE 9-1 ","cbCaiuzBfVqpvnNG","https://ap.wps.com/l/cbCaiuzBfVqpvnNG","pdf",6092721,707,"English","# SECTION 100: GENERAL\n## 101 INTRODUCTION\n## 102 DEFINITION\n## 103 SCOPE OF WORK\n## 104 ACCOMMODATION OF TRAFFIC\n## 105 PUBLICLY AND PRIVATELY OWNED SERVICES\n## 106 SURVEY AND SETTING OUT\n## 107 ACCESS TO ABUTTING PROPERTIES\n## 108 DIVERSION BRIDGES\n## 109 MAINTENANCE OF ROAD\n## 110 SITE INFORMATION\n## 111 ENVIRONMENTAL PROTECTION WORKS\n## 112 NOTES ABOUT MEASUREMENT AND PAYMENT\n## 113 EQUIVALENCY OF STANDARDS\n## 114 UNITS OF MEASUREMENT, ABBREVIATION AND TERMINOLOGY\n## 115 PROGRAM\n## 116 SUPPLY OF PROJECT RECORD\n# SECTION 200: SITE CLEARANCE\n## 201 CLEARING AND GRUBBING\n## 202 DISMANTLING CULVERTS, BRIDGES, OTHER STRUCTURES AND PAVEMENT\n# SECTION 300: SOIL IMPROVEMENT\n## 301 REINFORCED SOIL\n## 302 SOIL NAILING\n## ANNEXURE 300-1 A1 DESIGN AND DRAWINGS\n# SECTION 400: FENCING\n## 401 SCOPE\n## 402 MATERIALS\n## 403 INSTALLATION OF POST AND STANDARDS\n## 404 INSTALLATION OF WIRE\n## 405 INSTALLATION OF GATE\n## 406 MEASUREMENT\n## 407 PAYMENT\n# SECTION 500 – QUALITY CONTROL\n## 501. SCOPE\n## 502. CONTRACTOR RESPONSIBLE FOR THE QUALITY OF THE WORKS\n## 503. QUALITY CONTROL SYSTEM\n## 504. FIELD LABORATORY\n## 505. TESTING PROCEDURES AND SETS OF TESTS\n## 506. LABORATORY TRIALS TO CONFIRM COMPLIANCE WITH SPECIFICATIONS\n## 507. SITE TRIALS OR TRIAL SECTIONS\n## 508. CONTROL TESTING DURING CONSTRUCTION\n## 509. ACCEPTANCE TESTS FOR COMPLETED WORKS OR PARTS OF THE WORKS\n## 510. SCHEDULE OF TESTS\n## 511. QUALITY ASSURANCE PLAN\n# SECTION 600 – MATERIALS AND TESTING OF MATERIALS\n## 601. SCOPE\n## 602. QUALITY OF MATERIAL\n## 603. SOURCES OF MATERIALS\n## 604. INSPECTION AND ACCEPTANCE OF MATERIAL\n## 605. MATERIALS AND MANUFACTURED ARTICLES","[{\"question\":\"What is the scope of the Standard Specifications for Road and Bridge Works (2073 with amendment 2075)?\",\"answer\":\"The document provides standard requirements for road and bridge works, organized into sections covering general provisions, site clearance, soil improvement, fencing, quality control, and materials testing.\"},{\"question\":\"Which general topics are addressed in Section 100?\",\"answer\":\"Section 100 covers introduction, definitions, scope of work, accommodation of traffic, survey and setting out, access to abutting properties, diversion bridges, maintenance of road, and environmental protection, along with measurement and payment notes.\"},{\"question\":\"How does the document structure quality control requirements?\",\"answer\":\"Section 500 outlines the contractor’s responsibility for quality, the quality control system, field laboratory and testing procedures, trial and control testing during construction, acceptance tests, and a schedule of tests and quality assurance plan.\"}]","STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE WORKS - 2073 With amendment 2075 | PDF",1782]