[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-664055-105":59,"doc-detail-664055-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","standard-plan-61-2-5000a-480y-277v-2-7x11-field-switches-final","Standard Plan 6.1 - 2-5000A 480Y-277V & 2-7x11 Field Switches - Final","","Electrical service requirements for a customer installing a LADWP 5000A switchboard system, including advance coordination with the electrical service representative, arranging LADBS electrical inspection, and ensuring service is not energized until LADWP approval is received. Specifies conduit and concrete encasement from switch pad to property line, reinforcement requirements, mandreling and multi-fiber pulling tape installation standards, site staging/clearance conditions, grounding and barrier post provisions, permitting thresholds, and construction documentation and traffic control coordination.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":35,"@type":76,"position":81},"https://docshare.wps.com/document/healthcare/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/standard-plan-61-2-5000a-480y-277v-2-7x11-field-switches-final/664055/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/standard-plan-61-2-5000a-480y-277v-2-7x11-field-switches-final/664055.png","ImageObject",300,407,{"name":92,"@type":93},"Angel","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-29",true,{"@type":102,"interactionType":103,"userInteractionCount":8},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"When must the developer contact the electrical service representative and arrange inspections?","Question",{"text":112,"@type":113},"The developer must contact the department’s electrical service representative at least five normal working days before starting construction. The customer must arrange for electrical inspection by LADBS for the electrical work.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What conduit and duct installation requirements are specified for the switch pad to property line?",{"text":117,"@type":113},"The customer must construct new conduit lengths encased in concrete from the switch pad to the property line as shown, with additional reinforcing bars when primary conduits are installed in filled ground. Conduits must be mandreled using a mandrel provided by LADWP.",{"name":119,"@type":110,"acceptedAnswer":120},"What working space, clearance, and site staging conditions are required?",{"text":121,"@type":113},"A level, unobstructed working space is required in front of the entire pull section per electric service requirements. The area around switch and transformer pads must be clear of foreign items, and staging/truck access must be rated for highway loading with at least 100' minimum vertical clearance. Minimum 10-foot radial clearance is required around the pads for all specified openings and egress paths.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},664055,1793237998,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":34,"category_name":35,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":8,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":8,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":66,"faqs":140,"seo_title":141,"seo_description":67,"update_tm":129,"read_time":81},687207412472,"https://ap-avatar.wpscdn.com/davatar_155a257f0dc6eb9ab79c44ca47cae57d","NOTES:  \n1.THE DEVELOPER SHALL CONTACT THE DEPARTMENT'S ELECTRICAL SERICE REPRESENTATIVE(ESR)FIVE NORMAL WORKING DAYSPRIOR TO START OF CONSTRUCTION.  \n2.THE CUSTOMER SHALL ARRANGE FOR ELECTRICAL INSPECTION BY LADBS FOR THEIR ELETRICAL WORK。THE SERVICE WILL NOTBE ENERGIZED UNTIL NOTIFICATION OF APPROVAL HAS BEEN RECIEVED BY THE LADWP.  \n3.CUSTOMER TO CONSTRUCT 4-6'P &2-5'P NEW CONDUIT ENCASED IN 3”OF CONCRETE FROM THE SWITCH PAD TO PROPERTYLINE AS SHOWN.WHEN THE PRIMARY CONDUITS ARE INSTALLED ON FILLED GROUND,FOUR \\#4 REINFORCING BARS SHALL BEINSTALLED IN THE CONCRETE ENVELOPE.  \nLADWP /2'ACCESS PATH  \nCURBCURB  \n4.CONDUIT SHALL BE MANDRELLED WITH A MANDREL PROVIDED BY THE LADWP.INSTALL A FLAT,WOVEN MULTI-FIBER POLYESTERRIBBON,MINIMUM 3/8-INCH NOMINAL WIDTH AND /250 POUND MINIMUM TENSILE STRENGTH PULLING TAPE IN ALL DUCTS.THEPULLING TAPE SHALL BE PRINTED WITH THE RATED TENSILE STRENGTH AND SEQUENTIAL F0OTAGE MARKINGS WITH LEGIBLEAND STABLE PRINT.THE TAPE SHALL BE IN ONE CONTINUOUS LENGTH THROUGH EACH DUCT WITH NO CUTS,SPLICES OR TIESALLOWED.  \n3、MIN  \n(378V1d300V 1ON 人377V)133d1S  \n6.5′MIN  \n2I  \nHXXX8′X,XXX SQ.FT.36′x 53'STAGING AREA7  \n5.CUSTOMER TO INSTALL PRECAST CABLE TRENCH AND TRANSITION BOX TO THE 5000A PULL SECTION  \n6.TRUCK ACCESS AND STAGING AREA MUST BE RATED AT HIGHWAY LOADING AND HAVE A 100′MINIMUM VERTICAL CLEARANCE.  \n7.THE AREA ABOVE AND BELOW THE SWITCH PAD AND TRANSFORMER PAD,INCLUDING 3 FEET AROUND THE PADS,SHALL BECLEAR OF ANYTHING FOREIGN TO DEPARTMENT FACILITIES.SEE UGCS P721 FOR ADDIT IONAL INFORMATION.  \n8.IF INSTALLING METALLIC OBJECTS IN PROXIMITY TO THE SWITCH PAD AND TRANSFORMER PAD,1.E.CHAIN LINK FENCE OR IRONGATE,REFER TO UGCS UB721-12 FOR FENCE GROUNDING AND UB980-09 FOR ROLLING GATE GROUNDING REQUIREMENTS.  \n9.MINIMUM 10-F00T RADIAL CLEARANCE AROUND THE SWITCH PAD AND TRANSFORMER PAD /S REQUIRED FOR ALL AIR INTAKES,EXHAUST VENTS,DOORS,WINDOWS,FIRE ESCAPES,AND EGRESS PATHS.  \n10.INSTALL BARRIER POSTS PER UGCS P72/AND AS REQUIRED BY THE DWP ESR.  \n11.THE DEPARTMENT OF BUILDING AND SAFETY REQUIRES A BUILDING PERMIT FOR STRUCTURES EXCEEDING 48 INCHES INDEPTH,INSTALLED IN PRIVATE PROPERTY.  \n12.ANY IRRIGATION SYSTEM INSTALLED AROUND THE SWITCH PAD AND TRANSFORMER PAD MUST SPRAY AWAY FROM THE PADS.  \n13.ANY MATERIALS OR EQUIPMENT THAT YOU INSTALL ON YOUR PROPERTY-SUCH AS HANDHOLES,MAINTENANCE HOLES,VAULTS,TRANSFORMER PADS,OR CONDUITS-AT YOUR OWN COST WILL BE USED BY LADWP TO PROVIDE SERVICE.THESE /TEMS WILLREMAIN YOUR PROPERTY AND MUST BE MAINTAINED,REPAIRED,REPLACED,OR UPGRADED BY YOU,AT YOUR EXPENSE,WHENEVER LADWP DETERMINES IT IS NEEDED.EQUIPMENT INSTALLED BY LADWP,SUCH AS TRANSFORMERS AND CABLES,WILLREMAIN LADWP PROPERTY AND WILL BE MAINTAINED BY LADWP.  \nFENCE OR WALLNO BUILDING EGRESS,  \n*SEE NOTE 8OVERHANG,WINDOWS,  \nD00RS,OR INTAKES WITHINCLEARANCE AREA PER P72/  \n/7LADWP 12'ACCESSPATH5′NEW MS/5000A 480Y/277V,30-4WFREESTANDING WEATHERPRO0FPULL SECTION/SWITCHBOARD  \n14.REFER TO UB721-19,SHEET 3,SECTION 8 FOR GROUNDING REQUIREMENTS.FOR SEPARATELY DERIVED SUPPLEMENTALGROUNDING PLANE REQUIREMENTS,REFER TO UB72/-17.ALTERNATIVE DESIGNS,STAMPED AND APPROVED BY A LICENSEDENGINEER,WILL BE GIVEN PRELIMINARY APPROVAL PENDING FINAL APPROVAL BASED ON ACCEPTABLE RESISTANCEMEASUREMENTS OF 5 OHMS OR LESS TAKEN BY DWP TEST LAB.  \nNIW 9  \n15.PROVIDE TWO WALL MOUNTED FIRE BARRIER IN ACCORDANCE WITH LADWP UGCS UB721-21,UB721-22,OR UB721-41 AS LASTREVISED.  \nREVISED.  \n16.PROVIDE A LEVEL,UNOBSTRUCTED WORKING SPACE IN FRONT OF THE ENTIRE PULL SECTION PER ELECTRIC SERVICEREQUIREMENTS MANUAL PAGES 5-12 TO 5-15.  \nIsc=72,0QOA  \nNEW /-4′P EB(32')NEW FIBEROPTICS PULL BOX  \n42  \n17.THE LADWP REQUIRES A PERMANENT STAGING AREA FOR THE INSTALLATION AND MAINTENANCE OF THE LADWP TRANSFORMERIN THE CUSTOMER'S PROPOSED LOCATION.ANY REPAIRS NECESSARY TO THE CUSTOMER'S DRIVEWAYS AND SURFACE MATERIALSDURING THE INSTALLATION AND FUTURE MAINTENANCE OF THIS TRANSFORMER WILL BE THE RESPONSIBIL/TY OF THEPROPERTY OWNER.  \nOPTION /A  \nCUS","cbCaiuz8A1D2ZqM2","https://ap.wps.com/l/cbCaiuz8A1D2ZqM2","pdf",327408,"English","[{\"question\":\"When must the developer contact the electrical service representative and arrange inspections?\",\"answer\":\"The developer must contact the department’s electrical service representative at least five normal working days before starting construction. The customer must arrange for electrical inspection by LADBS for the electrical work.\"},{\"question\":\"What conduit and duct installation requirements are specified for the switch pad to property line?\",\"answer\":\"The customer must construct new conduit lengths encased in concrete from the switch pad to the property line as shown, with additional reinforcing bars when primary conduits are installed in filled ground. Conduits must be mandreled using a mandrel provided by LADWP.\"},{\"question\":\"What working space, clearance, and site staging conditions are required?\",\"answer\":\"A level, unobstructed working space is required in front of the entire pull section per electric service requirements. The area around switch and transformer pads must be clear of foreign items, and staging/truck access must be rated for highway loading with at least 100' minimum vertical clearance. Minimum 10-foot radial clearance is required around the pads for all specified openings and egress paths.\"}]","Standard Plan 6.1 - 2-5000A 480Y-277V & 2-7x11 Field Switches - Final | PDF"]