[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-649604-105":59,"doc-detail-649604-en":129},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":122,"head_meta":124,"extra_data":126,"updated_unix":128},105,"en","standard-drawings-for-water-wastewater-construction-october-2016","STANDARD DRAWINGS FOR WATER & WASTEWATER CONSTRUCTION - October 2016","","October 2016 edition of the Dallas Water Utilities (DWU) manual providing guidelines for standard appurtenances used in water and wastewater mains. The preface explains that this edition replaces the 2009 third edition and summarizes revision history across 1984, 1998, 2009, 2010, 2011, 2012, 2015, and 2016. It specifies updates for items such as cathodic protection series drawings and domestic water meter installation requirements to better accommodate AMI meters. It also lists where printed copies are available and includes indexed standard drawing references for common construction and water main construction parts.",{"@graph":69,"@context":121},[70,84,104],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/standard-drawings-for-water-wastewater-construction-october-2016/649604/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":98,"encodingFormat":97,"isAccessibleForFree":99,"interactionStatistic":100},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/standard-drawings-for-water-wastewater-construction-october-2016/649604.png","ImageObject",300,407,{"name":92,"@type":93},"Bintang","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-24",true,{"@type":101,"interactionType":102,"userInteractionCount":8},"InteractionCounter",{"@type":103},"ViewAction",{"@type":105,"mainEntity":106},"FAQPage",[107,113,117],{"name":108,"@type":109,"acceptedAnswer":110},"What is the purpose of the DWU “Standard Drawings for Water & Wastewater Construction” manual (October 2016)?","Question",{"text":111,"@type":112},"It provides guidelines for the standard appurtenances of water and wastewater mains owned and operated by Dallas Water Utilities (DWU).","Answer",{"name":114,"@type":109,"acceptedAnswer":115},"How does the October 2016 edition differ from the 2009 third edition?",{"text":116,"@type":112},"It replaces the 2009 edition and includes updates to accommodate new series of standard drawings for cathodic protection for water mains, plus modifications to domestic water meter installation requirements to better accommodate AMI meters.",{"name":118,"@type":109,"acceptedAnswer":119},"How are printed copies and online access to the manual provided?",{"text":120,"@type":112},"Printed copies are available for a fee through Mapping & Capital Services-Vaults (Maps & Plans). Copies are also available online at the referenced DWU design standards URL.","https://schema.org",{"og:url":83,"og:type":123,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":125,"canonical":83},"index,follow",{"doc_id":127,"site_id":62},649604,1792876138,{"code":4,"msg":5,"data":130},{"doc_id":127,"user_id":131,"nickname":92,"user_avatar":132,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":133,"file_id":134,"file_url":135,"file_type":136,"file_size":137,"view_count":8,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":138,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":143,"read_time":144},962085564381,"https://ap-avatar.wpscdn.com/davatar_6f874abed73319feea01a86fa6f0fab8","dallas water utlitiescity of dallos  \n# STANDARD DRAWINGS FORWATER&WASTEWATER CONSTRUCTION\n\nOctober 2016  \nPREFACE  \nThe intent of this manual is to provide guidelines for the standard appurtenances of water and wastewatermains owned and operated by Dallas Water Utilities(DWU).This manual replaces the third edition of“Standard Drawings for Water and Wastewater Construction”by DWU dated February,2009.Thechronological list of events in developing this manual is summarized as follows:  \nJAN,1984 FIRST EDITION:   Standard drawings are compiled into the first edition of the manual.MAY,1998 SECOND EDITION:The 1984 manual is revised and retitled.This edition includes revisionsmade in 1985,1986,1989 and 1991.FEB.2009 THIRD EDITION:The 1998 manual is revised to accommodate new constructionstandards required by 30 TAC§217.This edition includes minorrevisions made in 2003.  \nOcT.2010 FOURTH EDITION:The 2009 manual is revised to accommodate new constructionstandards required by Public Works Construction Standards for NorthCentral Texas by North Central Council of Governments(NCTCOG),October 2004.This edition includes minor revisions made in 2009 and2010.OCTOBER 2011The 2011manual includes minor revisions made in 2011.Henceforth,this edition and all subsequent editions will be designated by the year ofpublication.APRIL2012The 2012 manual includes minor revisions made in 2011 and 2012.Henceforth,this edition and all subsequent editions will be designatedby the year of publication.OCTOBER 2012The 2012 manual includes three new AMI Standard Drawings,aProject Construction Sign Technical Specifications,two new FlushPoint drawings,and several revision of some of the existing StandardDrawings.OCTOBER 2015The 2015 manual includes an alternative manhole configurationdrawing and several revisions of some if the existing StandardsDrawings.OCTOBER 2016The 2016manual is revised to accommodate new series of SandardDrawings for Cathodic Protection for water mains and modifications toinstallation requirements for domestic water meters to betteraccommodate AMI meters.  \nThis edition of“Standard Drawings for Water and Wastewater Construction”is written by EngineeringServices,Dallas Water Utilities.Any questions or suggestions regarding to this manual should beforwarded to Engineering Services,Dallas Water Utilities.  \nPrinted Copies Available(For Fee Payment)  \nAt Mapping&Capital Services-Vaults,Maps &Plans320E.Jefferson Blvd.Room 215Dallas,Texas 75203214-948-4584  \nCopies Also Available On-line At:  \nhttp://www.dallascityhall.com/dwu/dwu_design_standards.html  \n## PART 1-COMMON FOR WATER &WASTEWATER CONSTRUCTION\n\nBy Other Than Open Cut(Non-T.x.D.O.T.-Non Railroad)---101Highway Crossing-AllWastewater Mains &for Water Mains 12\"and Under in Diameter.---102Highway Crossing -For Water Mains Over 12\"Diameter---103Highway Crossing-Encasement Pipe,Gauge,Class,&Cover(12”to 72”Dia.)---104Highway Crossing-Encasement Pipe,Gauge,Class,&Cover(78”to 138”Dia.)---105Highway Crossing -T.x.D.O.T.Requirements(1of 2)---106Highway Crossing -T.x.D.O.T.Requirements (2of 2)---107Tunnel Approaches--With Casing Spacers---108Carrier Pipe Support--Tunnel---109Hold-Down -Jack Fabrication Detail---109AEmbedment Detail for Non-Pressure Rated Wastewater Mains Below Water Mains---110Encasement Detail for Non-Pressure Rated Wastewater Mains Above Water Mains----111Encasement Detail for Proposed Water Mains Below Wastewater Mains---111ATrench Width --Calculations For “Bd”---112Embedment--Class \"A\"and Class \"A-1\"---113Embedment--Class \"B\",Class \"B+\",and Class \"B-1\"---114Embedment--Class \"B-2\",Class \"B-3\",and Class \"B-4\"---115Embedment--Class \"C\",Class \"C+\",and Class \"C-1\"---116Embedment--Class \"C-2\"and Class \"D+\"---117Embedment--Class \"G\"and Class \"G-1\"---118Embedment--Class \"B-1a\",Class \"B-2a\",and Class \"B-5\"---119Contaminated Soil Clay Cut-Off Dam---119AEmbedment--Class \"E-1\"&“E-2”Landfill---119BEmbedment--Class \"E3\"High Chemical of Concern Zone---119CStabilized Backfill &Rip-Rap Detail For","cbCaiaoBsm9hfYT0","https://ap.wps.com/l/cbCaiaoBsm9hfYT0","pdf",8515490,225,"English","# PREFACE\n# PART 1 - COMMON FOR WATER & WASTEWATER CONSTRUCTION\n## By Other Than Open Cut (Non T.X.D.O.T. - Non Railroad)\n## Highway Crossing\n## Tunnel Approaches\n## Carrier Pipe Support\n## Hold-Down - Jack Fabrication Detail\n## Embedment Details and Trench Width Calculations\n## Stabilized Backfill & Rip-Rap Detail\n## Type “A” Utility Support\n# PART 2 - WATER MAIN CONSTRUCTION\n## Meter Box and Water Service Installations\n## AMI Meter Installation Details\n## Flush Point and Air Release Valve Details\n## Gate Valve and Butterfly Valve Installations\n## Large Main Blow-Off and Tapping Valve Installations\n## Fire Hydrant Setting, Manhole Frames, and Thrust Blocks","[{\"question\":\"What is the purpose of the DWU “Standard Drawings for Water \\u0026 Wastewater Construction” manual (October 2016)?\",\"answer\":\"It provides guidelines for the standard appurtenances of water and wastewater mains owned and operated by Dallas Water Utilities (DWU).\"},{\"question\":\"How does the October 2016 edition differ from the 2009 third edition?\",\"answer\":\"It replaces the 2009 edition and includes updates to accommodate new series of standard drawings for cathodic protection for water mains, plus modifications to domestic water meter installation requirements to better accommodate AMI meters.\"},{\"question\":\"How are printed copies and online access to the manual provided?\",\"answer\":\"Printed copies are available for a fee through Mapping \\u0026 Capital Services-Vaults (Maps \\u0026 Plans). Copies are also available online at the referenced DWU design standards URL.\"}]","STANDARD DRAWINGS FOR WATER & WASTEWATER CONSTRUCTION - October 2016 | PDF",1792802721,567]