[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-648757-105":59,"doc-detail-648757-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","sprinklers-and-standpipes-construction-document-and-shop-drawing-requirements","Sprinklers and Standpipes - Construction Document and Shop Drawing Requirements","","Requirements for installing sprinkler and standpipe systems specify what construction documents and shop drawings must be submitted and maintained for NYC Department plan examination and approval. The document references minimum requirements in the NYC Building Code (BC) and applicable NFPA standards for sprinkler installations across building types, and details when sealed Working Plans or approved sprinkler designs must be on-site for inspectors. It also states that standpipe submissions must follow BC section requirements, with NFPA 14 alignment, and requires filing a PAA when installed conditions substantially differ from approved documents.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/sprinklers-and-standpipes-construction-document-and-shop-drawing-requirements/648757/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/sprinklers-and-standpipes-construction-document-and-shop-drawing-requirements/648757.png","ImageObject",300,407,{"name":92,"@type":93},"adawds","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-11-03","2026-10-23",true,{"@type":102,"interactionType":103,"userInteractionCount":19},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What construction documents are required for sprinkler system plan examination and approval?","Question",{"text":112,"@type":113},"Minimum sprinkler system construction document requirements are listed in 2008 BC 903.1.2 and must be submitted to the Department for plan examination and approval across room/space occupancies and building types.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What must be on the job site for sprinkler system installations before work begins?",{"text":117,"@type":113},"A complete set of shop drawings (Working Plans compliant with NFPA 13 or NFPA 13R, or a design compliant with NFPA 13D) must be on-site, sealed by a registered design professional or stamped as approved by the applicant of record, and provided to special and Department inspectors.",{"name":119,"@type":110,"acceptedAnswer":120},"What happens if the built condition differs substantially from the approved construction documents?",{"text":121,"@type":113},"A PAA must be filed with the Department when the constructed condition varies substantially from the approved construction documents.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},648757,1792794918,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":19,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":8,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":81},3985747872983,"https://ap-avatar.wpscdn.com/davatar_994ba38a5ba835b3df7d355c54d3ed8d","Sprinklers and Standpipes:  \nConstruction Document + Shop Drawing Requirements  \nWhen installing sprinkler or standpipe systems , minimum requirements for construction documents and shop drawings are outlined in the NYC Building Code (BC) and National Fire Protection Association (NFPA) Codes and Standards.  \nSprinkler System Installations  \n2008 BC 903.1.2 lists the minimum requirements for sprinkler system construction documents – for all room/space occupancies and building types – to be submitted to the Department for plan examination and approval.  \nSprinkler system installation, however, requires more comprehensive Working Plans. Depending on the room/space occupancy and building type, please see:  \n􀁸 2002 NFPA 13 Section 14.1 , as amended by BC Appendix Q (Q102);  \n􀁸 2002 NFPA 13R Section 6.1 , as amended by BC Q104; or  \n􀁸 2002 NFPA 13D Chapter 8 , as amended by BC Q103 , which outlines a detailed sprinkler design in lieu of Working Plans.  \nBefore beginning any sprinkler system installation, a complete set of shop drawings (Working Plans in compliance with NFPA 13 , NFPA 13R or a sprinkler design in compliance with NFPA 13D)– sealed by a registered design professional or stamped as approved by the applicant of record – must be on the job site for use by special inspectors (BC Chapter 17) and Department inspectors. These shop drawings must be available on-site until the job is signed off and , after sign-off, available upon request from the applicant of record for six years.  \nStandpipe System Installation  \nStandpipe system installations must follow a similar protocol. Submitted construction documents for plan examination and approval shall be in accordance with BC 905.1.1 , while shop drawings (Working Plans in compliance with 2003 NFPA 14 Section 8.1 , as amended by BC Q105)– sealed by a registered design professional or stamped as approved by the applicant of record – must be maintained on the job site prior to the commencement of the standpipe system installation, and available to special inspectorsand Department inspectors at all times.  \nIf the constructed condition varies substantially from the approved construction documents, a PAA must be filed with the Department.","cbCaibhM97lBO8Wv","https://ap.wps.com/l/cbCaibhM97lBO8Wv","pdf",183369,"English","# Sprinkler System Installations\n## Working Plans and On-Site Requirements\n# Standpipe System Installation\n## Maintenance of Shop Drawings and Inspector Access\n# Approved Document Changes\n## PAA Filing for Substantial Variations","[{\"question\":\"What construction documents are required for sprinkler system plan examination and approval?\",\"answer\":\"Minimum sprinkler system construction document requirements are listed in 2008 BC 903.1.2 and must be submitted to the Department for plan examination and approval across room/space occupancies and building types.\"},{\"question\":\"What must be on the job site for sprinkler system installations before work begins?\",\"answer\":\"A complete set of shop drawings (Working Plans compliant with NFPA 13 or NFPA 13R, or a design compliant with NFPA 13D) must be on-site, sealed by a registered design professional or stamped as approved by the applicant of record, and provided to special and Department inspectors.\"},{\"question\":\"What happens if the built condition differs substantially from the approved construction documents?\",\"answer\":\"A PAA must be filed with the Department when the constructed condition varies substantially from the approved construction documents.\"}]","Sprinklers and Standpipes - Construction Document and Shop Drawing Requirements | PDF"]