[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-648360-105":59,"doc-detail-648360-en":129},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":122,"head_meta":124,"extra_data":126,"updated_unix":128},105,"en","specifications-vol-1-dhs-conformed-set","Specifications - VOL 1 - DHS Conformed Set","","Project manual for Dover High School & Career Technical Center in Dover, New Hampshire, presenting a compiled 100% conformed set. It consolidates the original August 12, 2016 100% Construction Documents and published addenda, plus specific PC Construction changes communicated during the bidding period. The document states that preparation was for convenience and that completeness and/or accuracy cannot be guaranteed, while any inconsistencies do not change Contract Document requirements. It includes consultant listings, professional seals identifiers, and a table of contents covering procurement, general requirements, and multiple construction divisions with named sections.",{"@graph":69,"@context":121},[70,84,104],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/specifications-vol-1-dhs-conformed-set/648360/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":98,"encodingFormat":97,"isAccessibleForFree":99,"interactionStatistic":100},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/specifications-vol-1-dhs-conformed-set/648360.png","ImageObject",300,407,{"name":92,"@type":93},"dawugda","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-23",true,{"@type":101,"interactionType":102,"userInteractionCount":4},"InteractionCounter",{"@type":103},"ViewAction",{"@type":105,"mainEntity":106},"FAQPage",[107,113,117],{"name":108,"@type":109,"acceptedAnswer":110},"What does the “100% Conformed Set” compilation include?","Question",{"text":111,"@type":112},"It compiles the original August 12, 2016 100% Construction Documents, published addenda, and other specific changes communicated by PC Construction during the bidding period.","Answer",{"name":114,"@type":109,"acceptedAnswer":115},"Are the compiled specifications guaranteed to be complete and accurate?",{"text":116,"@type":112},"No. The document states that completeness and/or accuracy of the information is not guaranteed.",{"name":118,"@type":109,"acceptedAnswer":119},"Which parts are covered by the table of contents in Volume 1 of 2?",{"text":120,"@type":112},"It lists general documents such as consultant listings and professional seals, and it enumerates construction divisions including Division 01 (General Requirements) through Division 07 (Thermal and Moisture Protection) with many named sections.","https://schema.org",{"og:url":83,"og:type":123,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":125,"canonical":83},"index,follow",{"doc_id":127,"site_id":62},648360,1792793224,{"code":4,"msg":5,"data":130},{"doc_id":127,"user_id":131,"nickname":92,"user_avatar":132,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":133,"file_id":134,"file_url":135,"file_type":136,"file_size":137,"view_count":4,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":138,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":128,"read_time":143},3985747870947,"https://ap-avatar.wpscdn.com/davatar_3d24733baf745e90a7e4bdd5f77d97b2","PROJECT MANUAL  \nDOVER HIGH SCHOOL & CAREER TECHNICAL CENTER  \nDover, New Hampshire  \nThese specifications are a compilation of the original August 12, 2016 100% Construction Documents and published Addenda, including other specific changes communicated by PC Construction during the bidding period. These compiled specifications were prepared for convenience. The completeness and/or accuracy of the information is not guaranteed; any inconsistencies with the 100% Construction Documents and the published addenda and specific changes communicated by PC Construction during bidding period do not alter the requirements of the Contract Documents  \nHMFH Architects, Inc.  \n130 Bishop Allen Drive Cambridge, MA 02139 617 492 2200  \n100% Conformed Set   \nFor Construction VOLUME 1 OF 2  \nSET\\#     \nSeptember 12, 2016  \nHMFH PROJECT NO. 403114 September 12, 2016  \nDover High School & Career Technical Center Dover, NH  \nDOCUMENT 000105  \nLIST OF CONSULTANTS  \nArchitect: HMFH Architects, Inc.  \n130 Bishop Allen Drive  \nCambridge, MA 02139  \nStructural Engineer: Foley Buhl Roberts & Associates, Inc.  \n2150 Washington Street  \nNewton, MA 02462  \nPlumbing, Fire Protection, Garcia Galuska DeSousa Consulting Engineers  \nHVAC, Electrical, Technology, 370 Faunce Corner Road  \nand Security: Dartmouth, MA 02747  \nCivil Engineer Nobis Engineering Inc.  \n18 Chenell Drive  \nConcord, NH 03301  \nLandscape Architect: Halvorson Design Partnership, Inc.  \n25 Kingston Street  \nBoston, MA 02111  \nCost Estimator: PM & C  \n59 South Street  \nHingham, MA 02043  \nSpecifications: Kalin Associates, Inc.  \n1121 Washington Street  \nNewton, MA 02465  \nGeotechnical: McPhail Associates, Inc.  \n2269 Massachusetts Avenue  \nCambridge, MA 02140  \nHardware: Arc Spec  \n331 Page St. , Ste 4  \nStoughton, MA 02072  \nFurniture and Equipment: Point Line Space  \nP.O. Box 151  \nCarlisle, MA 01741  \nLIST OF CONSULTANTS  \n000105-1  \nHMFH PROJECT NO. 403114 September 12, 2016  \nDover High School & Career Technical Center Dover, NH  \nFood Service: Crabtree McGrath Associates, Inc.  \n161 West Main Street Georgetown, MA 01833  \nHazardous Materials: Universal Environmental Consultants  \n12 Brewster Road  \nFramingham, MA 01702  \nAcoustics,Theater and Sound System: Cavanaugh Tocci Associates, Inc.  \n327 F Boston Post Road Sudbury, MA 01776  \nEND OF DOCUMENT  \nLIST OF CONSULTANTS  \n000105-2  \nHMFH PROJECT NO. 403114 September 12, 2016  \nDover High School & Career Technical Center Dover, NH  \nDOCUMENT 000107 PROFESSIONAL SEALS  \nSPECIFICATIONS FOR  \nDover High School & Career Technical Center  \nDesigner  \nArchitects  \nStructural Engineers  \nCivil Engineers  \nLandscape Architects  \nFire Protection Engineers  \nPROFESSIONAL SEALS 000107-1  \nHMFH PROJECT NO. 403114 September 12, 2016  \nDover High School & Career Technical Center Dover, NH  \nHVAC Engineers Plumbing Engineers  \n-------------------------------------------------------------------  \nElectrical Engineers  \nEND OF DOCUMENT  \nPROFESSIONAL SEALS  \n000107-2  \nHMFH PROJECT NO. 403114 September 12, 2016  \nDover High School & Career Technical Center Dover, NH  \nTABLE OF CONTENTS  \nGENERAL DOCUMENTS  \nDocument:  \n000105 List of Consultants  \n000107 Professional Seals  \n000110 Table of Contents  \nVOLUME 1 OF 2  \nDIVISION 00-PROCUREMENT AND CONTRACTING REQUIREMENTS PROCUREMENT REQUIREMENTS  \nDocument:  \nNot Issued  \nCONTRACTING REQUIREMENTS  \nDocument:  \nNot Issued  \nSPECIFICATIONS  \nDIVISION 01-GENERAL REQUIREMENTS  \nSection:  \n011100 Summary of Work  \n011400 Work Restrictions  \n011401 Electronic Release Form  \n012200 Unit Prices  \n012201 Unit Price Proposal Sheet  \n012300 Alternates  \n012400 Schedule of Values  \n013100 Project Management and Coordination  \n013119 Project Meetings  \n013200 Construction Progress Documentation  \n013300 Submittal Procedures  \n013301 Substitution / Or Equal Request Form  \n013302 Submittal Review Transmittal  \n013543 Environmental Procedures – To be issued as an addendum.  \n014000 Quality Requirements  \n015000 Temporary ","cbCailw87mjTqXhW","https://ap.wps.com/l/cbCailw87mjTqXhW","pdf",11713789,1046,"English","# General Documents\n## 000105 List of Consultants\n## 000107 Professional Seals\n## 000110 Table of Contents\n# Division 01 - General Requirements\n## 011100 Summary of Work\n## 011400 Work Restrictions\n## 011401 Electronic Release Form\n## 012200 Unit Prices\n## 012201 Unit Price Proposal Sheet\n## 012300 Alternates\n## 012400 Schedule of Values\n## 013100 Project Management and Coordination\n## 013119 Project Meetings\n## 013200 Construction Progress Documentation\n## 013300 Submittal Procedures\n## 013301 Substitution / Or Equal Request Form\n## 013302 Submittal Review Transmittal\n## 013543 Environmental Procedures – To be issued as an addendum\n## 014000 Quality Requirements\n## 015000 Temporary Facilities and Controls\n## 015639 Temporary Tree and Plant Material Protection\n## 017329 Cutting and Patching\n## 017400 Cleaning and Waste Management\n## 017700 Closeout Procedures\n## 017839 Project Record Documents\n## 018119 Indoor Air Quality Requirements\n## 019112 Commissioning of Building Enclosure\n## 019113 Commissioning Requirements\n# Division 02 - Existing Conditions\n## 022820 Asbestos Remediation – To be issued as an addendum\n## 024119 Demolition\n## 024119 Selective Demolition-Site\n# Division 03 - Concrete\n## 033000 Cast-In-Place Concrete\n## 033060 Site Architectural Concrete\n## 033300 Architectural Concrete\n## 033650 Concrete Finishes\n## 034500 Precast Architectural Concrete\n## 034500 Site Precast Architectural Concrete\n# Division 04 - Masonry\n## 042000 Unit Masonry\n## 044000 Site Stone\n# Division 05 - Metals\n## 051200 Structural Steel Framing\n## 051226 Shear Connectors\n## 052100 Steel Joist Framing\n## 053100 Steel Decking\n## 054000 Cold-Formed Metal Framing\n## 055000 Metal Fabrications\n## 057300 Decorative Glass Railings\n## 057500 Decorative Formed Metal\n# Division 06 - Wood, Plastics and Composites\n## 061000 Rough Carpentry\n## 061600 Sheathing\n## 064020 Interior Architectural Woodwork\n## 066400 FRP Paneling\n# Division 07 - Thermal and Moisture Protection\n## 071100 Bituminous Dampproofing\n## 071300 Fluid Applied Waterproofing\n## 071400 Self-Adhering Sheet Waterproofing\n## 071600 Polymer Modified Cement Waterproofing\n## 071800 Pavement Markings\n## 072100 Thermal Insulation\n## 072500 Air Barriers\n## 074210 Metal Rooftop Panels\n## 074220 Solid Phenolic Wall Panels\n## 075300 EPDM Roofing","[{\"question\":\"What does the “100% Conformed Set” compilation include?\",\"answer\":\"It compiles the original August 12, 2016 100% Construction Documents, published addenda, and other specific changes communicated by PC Construction during the bidding period.\"},{\"question\":\"Are the compiled specifications guaranteed to be complete and accurate?\",\"answer\":\"No. The document states that completeness and/or accuracy of the information is not guaranteed.\"},{\"question\":\"Which parts are covered by the table of contents in Volume 1 of 2?\",\"answer\":\"It lists general documents such as consultant listings and professional seals, and it enumerates construction divisions including Division 01 (General Requirements) through Division 07 (Thermal and Moisture Protection) with many named sections.\"}]","Specifications - VOL 1 - DHS Conformed Set | PDF",2636]