[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-646012-105":3,"detail-sidebar-cat-0-en-105":73,"doc-detail-646012-en":122},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":66,"head_meta":68,"extra_data":70,"updated_unix":72},105,"en","sparton-technologyinc-coors-road-facility-final-source-containment-system-operation-and-maintenance-manual-prepared-for-sparton-technologyinc-rio-rancho-new-mexico-february-2003","SPARTON TECHNOLOGY,INC. COORS ROAD FACILITY - FINAL - SOURCE CONTAINMENT SYSTEM OPERATION AND MAINTENANCE MANUAL - Prepared for Sparton Technology,Inc., Rio Rancho, New Mexico - February 2003","","Formal compliance and engineering documentation for the Sparton Technology, Inc. Coors Road facility, presenting the Source Containment System Operation and Maintenance Manual. It describes the installed and tested containment system, including containment well CW-2, a water treatment building, and rapid infiltration ponds. The manual outlines operational permits and reporting requirements, assigns operational responsibilities, and provides normal startup/shutdown procedures plus scheduled one-time and recurring maintenance tasks. It also covers troubleshooting, equipment replacement schedules, waste management, contingency plans, and health and safety planning.",{"@graph":14,"@context":65},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/healthcare/","Healthcare",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/sparton-technologyinc-coors-road-facility-final-source-containment-system-operation-and-maintenance-manual-prepared-for-sparton-technologyinc-rio-rancho-new-mexico-february-2003/646012/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/sparton-technologyinc-coors-road-facility-final-source-containment-system-operation-and-maintenance-manual-prepared-for-sparton-technologyinc-rio-rancho-new-mexico-february-2003/646012.png","ImageObject",300,407,{"name":42,"@type":43},"anakgang17","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-11-10","2026-10-23",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",6,{"@type":57,"mainEntity":58},"FAQPage",[59],{"name":60,"@type":61,"acceptedAnswer":62},"What types of content does the manual include for day-to-day operations and compliance?","Question",{"text":63,"@type":64},"It provides operational permits and reporting requirements, defines operational responsibilities, details normal startup and shutdown procedures, lists scheduled maintenance tasks, and includes troubleshooting, repairs, supplies, and replacement schedules. It also covers waste management, contingency plans, and a health and safety plan.","Answer","https://schema.org",{"og:url":32,"og:type":67,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":69,"canonical":32},"index,follow",{"doc_id":71,"site_id":7},646012,1792756313,{"code":4,"msg":74,"data":75},"success",[76,80,84,88,93,97,101,106,111,114,118],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":77,"show_sort_weight":78,"slug":79},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":81,"show_sort_weight":82,"slug":83},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},"Exam",70,"exam",{"id":89,"doc_module":4,"doc_module_name":25,"category_name":90,"show_sort_weight":91,"slug":92},5,"Comic",60,"comic",{"id":55,"doc_module":4,"doc_module_name":25,"category_name":94,"show_sort_weight":95,"slug":96},"Technology",50,"technology",{"id":98,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":99,"slug":100},7,40,"healthcare",{"id":102,"doc_module":4,"doc_module_name":25,"category_name":103,"show_sort_weight":104,"slug":105},8,"Research & Report",30,"research-report",{"id":107,"doc_module":4,"doc_module_name":25,"category_name":108,"show_sort_weight":109,"slug":110},9,"Religion & Spirituality",20,"religion-spirituality",{"id":109,"doc_module":4,"doc_module_name":25,"category_name":112,"show_sort_weight":109,"slug":113},"World Cup","world-cup",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":115,"slug":117},10,"Lifestyle","lifestyle",{"id":119,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":89,"slug":121},19,"General","general",{"code":4,"msg":74,"data":123},{"doc_id":71,"user_id":124,"nickname":42,"user_avatar":125,"doc_module":4,"category_id":98,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":126,"file_id":127,"file_url":128,"file_type":129,"file_size":130,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":131,"language":132,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":133,"faqs":134,"seo_title":135,"seo_description":12,"update_tm":136,"read_time":137,"preview_page_count":4},962090883568,"https://ap-avatar.wpscdn.com/davatar_a8503ba1806abce46bf441b54a3ca4cd","8429 WASHINGTON PLACE NE,SUITE AALBUQUERQUE,NEW MEXICO 87113Phone:(505)828-2801Fax:(505)828-2803  \nMETRIC  \nCorporation ENVIRONMENTAL ENGINEERING AND SCIENCE  \nFebruary 14,2003  \nMichael Hebert,Sparton Technology,Inc.Project CoordinatorUnited States Environmental Protection Agency-Region VITechnical Section(EN-HX)  \nCompliance Assurance and Enforcement Division1445 Ross AvenueDallas,Texas 75202  \nFEB 200  \nDear Mr.Hebert:  \nEnclosed are 3 copies of our report \"Final Source Containment System Operation andMaintenance Manual\",for Sparton Technology,Inc.,Coors Road facility.  \nI certify under penalty of law that this document and all attachments were preparedunder my direction and supervision in accordance with a system designed to assurethat qualified personnel properly gather and evaluate the information submitted.Basedupon my inquiry of either the person or persons who manage the system and/or theperson or persons directly responsible for gathering the information,the informationsubmitted is,to the best of my knowledge and belief,true,accurate,and complete.Ifurther certify,to the best of my knowledge and belief,that this document is consistentwith the applicable requirements of the consent decree entered among the New MexicoEnvironment Department,the U.S.Environmental Protection Agency,SpartonTechnology,Inc.,and others in connection with Civil Action No.CIV 970206 LH/JHG,United States District Court for the District of New Mexico.I am aware that there aresignificant penalties for submitting false information,including the possibility of fine andimprisonment for knowing violations.  \nSincerely,  \nauyz人METRIC Corporation -Gary L.Richardson,P.E.Executive Vice President  \nGLR/ld  \nCC:heDirector,Water and Waste Management Division,NMEDChief,Hazardous Waste Bureau,NMEDChief,Groundwater Bureau,NMED  \nSusan Widener,Sparton Technology,Inc.,Jackson,MIGeneral Manager,Sparton Technology,Inc.,Rio Rancho,NMDon Gutierrez,Sparton Technology,Inc.,Rio Rancho,NMTony Hurst,Hurst Engineering Services-2 copies  \n# METRICLIBRARY COPYFCorporation\n\nSPARTON TECHNOLOGY,INC.COORS ROAD FACILITYFINAL  \nSOURCE CONTAINMENT SYSTEMOPERATION AND MAINTENANCE MANUALPREPARED FORSPARTON TECHNOLOGY,INC.RIO RANCHO,NEW MEXICOPREPARED BYMETRIC CORPORATIONALBUQUERQUE,NEW MEXICOFEBRUARY 2003  \n## SPARTON TECHNOLOGY,INC.COORS ROAD FACILITYFINAL\n\nSOURCE CONTAINMENT SYSTEMOPERATION AND MAINTENANCE MANUAL  \nPREPARED FOR  \nSPARTON TECHNOLOGY,INC.RIO RANCHO,NEW MEXICO  \nPREPARED BYMETRIC CORPORATIONALBUQUERQUE,NEW MEXICO  \nSPARTON TECHNOLOGY,INC.COORS ROAD FACILITYFINAL  \n## SOURCE CONTAINMENT SYSTEMOPERATION AND MAINTENANCE MANUAL\n\nPREPARED FORSPARTON TECHNOLOGY,INC.RIO RANCHO,NEW MEXICO  \nPREPARED BYMETRIC CORPORATIONALBUQUERQUE,NEW MEXICO  \nTABLE OF CONTENTS  \nINTRODUCTION ………………………………………………………………………………………………………………………………………1  \nCONTAINMENT SYSTEM DESCRIPTION …………………………………………………………………………………1  \nOPERATING PERMITS AND REPORTING REQUIREMENTS…………………………………………6  \nOPERATIONAL RESPONSIBILITIES …………………………………………………………………………………………………7  \nNORMAL OPERATION …………………………………………………………………………………………………………………8  \nNormal Startup Procedure …………………………………………………………………………………………………………………8  \nNormal Shutdown Procedure…………………………………………………………………………………………………………………8  \nTasks Performed One Time Per Week …………………………………………………………………………………………9  \nTasks Performed One Time Per Month ………………………………………………………………………………………11  \nTasks Performed One Time Per Quarter……………………………………………………………………………………11  \nTasks Performed One Time Per Year …………………………………………………………………………………………11  \nTasks Performed Two Times Per Year ………………………………………………………………………………………11  \nSYSTEM TROUBLE SHOOTING, REPAIRS, AND SUPPLIES………………………………………12  \nStartup After Automatic Shutdown…………………………………………………………………………………………12  \nEQUIPMENT REPLACEMENT SCHEDULE ………………………………………………………………………12  \nWASTE MANAGEMENT ……………………………………………………………………………………………………13  \nCONTINGENCY PLANS ……………………………………………………………………………………………………………19  \nHEALTH AND SAFETY PLAN …………………………………………………………………………………………………19  \nLIST OF ","cbCaidb2X1TTst6N","https://ap.wps.com/l/cbCaidb2X1TTst6N","pdf",9996175,259,"English","# INTRODUCTION\n# CONTAINMENT SYSTEM DESCRIPTION\n# OPERATING PERMITS AND REPORTING REQUIREMENTS\n# OPERATIONAL RESPONSIBILITIES\n# NORMAL OPERATION\n## Normal Startup Procedure\n## Normal Shutdown Procedure\n## Tasks Performed One Time Per Week\n## Tasks Performed One Time Per Month\n## Tasks Performed One Time Per Quarter\n## Tasks Performed One Time Per Year\n## Tasks Performed Two Times Per Year\n# SYSTEM TROUBLE SHOOTING, REPAIRS, AND SUPPLIES\n## Startup After Automatic Shutdown\n# EQUIPMENT REPLACEMENT SCHEDULE\n# WASTE MANAGEMENT\n# CONTINGENCY PLANS\n# HEALTH AND SAFETY PLAN\n# LIST OF FIGURES AND TABLES\n# LIST OF ATTACHMENTS","[{\"question\":\"What types of content does the manual include for day-to-day operations and compliance?\",\"answer\":\"It provides operational permits and reporting requirements, defines operational responsibilities, details normal startup and shutdown procedures, lists scheduled maintenance tasks, and includes troubleshooting, repairs, supplies, and replacement schedules. It also covers waste management, contingency plans, and a health and safety plan.\"}]","SPARTON TECHNOLOGY,INC. COORS ROAD FACILITY - FINAL - SOURCE CONTAINMENT SYSTEM OPERATION AND MAINTENANCE MANUAL - Prepared for Sparton Technology,Inc., Rio Rancho, New Mexico - February 2003 | PDF",1792745667,653]