[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-650130-105":3,"detail-sidebar-cat-0-en-105":81,"doc-detail-650130-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","somerset-solar-project-345345kv-substation-general-plan-preliminary-drawings","SOMERSET SOLAR PROJECT - 345/34.5kV SUBSTATION General Plan - Preliminary Drawings","","Preliminary drawing set for the Somerset Solar Project covering a 345/34.5kV electrical substation. The attachment includes facility substation drawing elements such as switching one-line diagrams, grounding plans, control building layouts, and elevation views. It defines construction notes (tubular extruded seamless bus pipe material, leveling nuts, equipment mounting on pads), provides legend items, and states minimum clearance requirements for 345kV and 34.5kV systems. Drawing revisions indicate permitting issuance under 94-C permit.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/somerset-solar-project-345345kv-substation-general-plan-preliminary-drawings/650130/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/somerset-solar-project-345345kv-substation-general-plan-preliminary-drawings/650130.png","ImageObject",300,407,{"name":42,"@type":43},"Đào","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-30","2026-10-24",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",6,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What project and facility are these drawings for?","Question",{"text":63,"@type":64},"They are for the Somerset Solar Project and its 345/34.5kV substation facility, including general plan and related elevation and plan views.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"What construction and design notes are specified?",{"text":68,"@type":64},"The drawings specify preliminary design status, confirmation of phasing based on transmission line design, use of leveling nuts on steel structures, equipment mounted directly on pads, and ratings subject to study results.",{"name":70,"@type":61,"acceptedAnswer":71},"What minimum clearance requirements are listed?",{"text":72,"@type":64},"Minimum clearance values are provided for 345kV and 34.5kV systems, including live part to grade and live part to live part clearance distances with specified assumptions (e.g., BIL conditions).","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},650130,1792898083,{"code":4,"msg":82,"data":83},"success",[84,88,92,96,101,105,110,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":89,"show_sort_weight":90,"slug":91},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":93,"show_sort_weight":94,"slug":95},"Exam",70,"exam",{"id":97,"doc_module":4,"doc_module_name":25,"category_name":98,"show_sort_weight":99,"slug":100},5,"Comic",60,"comic",{"id":55,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":107,"show_sort_weight":108,"slug":109},7,"Healthcare",40,"healthcare",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":112,"slug":113},8,30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":97,"slug":129},19,"General","general",{"code":4,"msg":82,"data":131},{"doc_id":79,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":111,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":106,"language":139,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":12,"update_tm":143,"read_time":144},1374402968488,"https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","Attachment 9: Facility Substation Drawings  \n\n| | 345kV OH CONNECTION TOKINTIGH SUBSTATION\u003Cbr>(APPROX. 159 FT)\u003Cbr>|  | NOTES |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- |\n|  |  |  | 1. TUBULAR BUS SHALL BE EXTRUDED, SEAMLESS BUS PIPE MADE OF 6063-T6 ALLOY, SCHEDULE 40.\u003Cbr>2. PHASING ARRANGEMENT TO BE CONFIRMED BASED ON THE TRANSMISSION LINE DESIGN.\u003Cbr>3. LEVELING NUTS SHALL BE USED ON ALL STEEL STRUCTURES.\u003Cbr>4. EQUIPMENT SHALL BE MOUNTED DIRECTLY ON PADS.\u003Cbr>5. EQUIPMENT RATINGS SUBJECT TO CHANGE BASED ON STUDIES RESULTS.\u003Cbr>6. DESIGN IS PRELIMINARY AND SHALL BE FINALIZED AT DETAILED DESIGN PHASE. |  |  |  |\n|  |  |  | LEGEND |  |  |  |\n|  |  |  | | LIGHT (STRUCTURE)\u003Cbr>SWITCH OPERATOR-MOTOR\u003Cbr>SWITCH OPERATOR-WORM GEAR\u003Cbr>FENCE\u003Cbr>4'-0\" x 6'-0\" SWITCH GROUNDING MAT\u003Cbr>BURIED CABLE |  |  |\n|  |  |  | MINIMUM CLEARANCE REQUIREMENT |  |  |  |\n|  |  |  | 345kV MINIMUM CLEARANCE (1300kV BIL):\u003Cbr>LIVE PARTS: Ø-G=106\"\u003Cbr>Ø-Ø=119\"\u003Cbr>TO GRADE: 18'-0\" (BUS)\u003Cbr>30'-0\" (DRIVEWAY)\u003Cbr>34.5kV MINIMUM CLEARANCE (200kV BIL):\u003Cbr>LIVE PARTS: Ø-G=13\"\u003Cbr>Ø-Ø=18\"\u003Cbr>TO GRADE: 10'-0\" (BUS)\u003Cbr>22'-0\" (DRIVEWAY) |  |  |  |\n|  |  |  | DRAWING NUMBER |  | DRAWING DESCRIPTION |  |\n|  |  |  | HV-E.02.01 |  | 345/34 .5kV SUBSTATION SWITCHING\u003Cbr>ONE-LINE DIAGRAM |  |\n|  |  |  | HV-P.08.01 |  | 345/34 .5kV SUBSTATION GROUNDING PLAN |  |\n|  |  |  | HV-P.14.01 |  | 345/34 .5kV SUBSTATION CONTROL BUILDING\u003Cbr>LAYOUT |  |\n|  |  |  | HV-P.02.01 |  | 345/34 .5kV SUBSTATION 345kV ELEVATION\u003Cbr>VIEW |  |\n|  |  |  | HV-P.02.02 |  | 345/34 .5kV SUBSTATION 34.5kV ELEVATION\u003Cbr>VIEW |  |\n|  |  |  | HV-P.15.01 |  | 345/34 .5kV SUBSTATION CONTROL BUILDING\u003Cbr>ELEVATION |  |\n|  |  |  |  |  |  |  |\n|  |  | \u003Cbr>ISSU TF-INONLY |  |  |  |  |\n\nAES Titleblock 22X34 v210319  \n\n|  | |  |  |  |\n| --- | --- | --- | --- | --- |\n| \u003Cbr>IT IS A VIOLATION OF THE NEW YORK STATE EDUCATION LAW, ARTICLE 145, FOR ANY PERSON, UNLESS UNDER THE DIRECTION OF A NEW YORK STATE LICENSED PROFESSIONAL ENGINEER, TO ALTER AN ITEM ON THIS DOCUMENT IN ANYWAY. |  |  |  |  |\n|  |  |  |  |  |\n|  |  |  |  |  |\n| KEY PLAN: |  |  |  |  |\n|  |  |  |  |  |\n| REVISIONS: |  |  |  |  |\n| NO. | DATE | DESCRIPTION |  |  |\n| 0 | 03/08/2023 | ISSUED FOR 94-C PERMIT |  |  |\n|  |  |  |  |  |\n|  |  |  |  |  |\n|  |  |  |  |  |\n|  |  |  |  |  |\n|  |  |  |  |  |\n|  |  |  |  |  |\n|  |  |  |  |  |\n| PROJECT TITLE: |  |  |  |  |\n| SOMERSET SOLAR PROJECT |  |  |  |  |\n| PROJECT LOCATION: |  |  |  |  |\n| LAKE ROAD, SOMERSET NY |  |  |  |  |\n| SHEET TITLE & DESCRIPTION: |  |  |  |  |\n| 345/34 .5kV SUBSTATION |  |  |  |  |\n| GENERAL PLAN |  |  |  |  |\n| PROJ\u003Cbr>NUM: |  | SU20.0012 |  |  |\n| DES: MIKE MAILLE |  |  |  |  |\n| DWN: MIKE MAILLE/KRINA GANDHI |  |  |  |  |\n| CHK: AZIN SHAHAB |  |  |  |  |\n| APV: ZHONG BING SHEN, P. E. |  |  |  |  |\n| DATE: 02/17/2023 |  |  |  |  |\n| SCALE AT 22\" x 34\":\u003Cbr>0 8' 16' 24' 32'\u003Cbr>\u003Cbr>1/16\" = 1'-0\" |  |  |  |  |\n| SHEET NO:\u003Cbr>HV-P.01.01 |  |  | REV:\u003Cbr>0 |  |\n|  |  |  |  |  |\n\n\n| v210319 |  | \u003Cbr>13'-112\"\u003Cbr>38'-10\"\u003Cbr>28'\u003Cbr>1\"\u003Cbr>25'-8\u003Cbr>2\u003Cbr>18'-1 112\"\u003Cbr>1\" 25'-4\u003Cbr>2\u003Cbr>19'-8\"\u003Cbr>X\u003Cbr>8'-6\"\u003Cbr>5'-7\"\u003Cbr>X X X\u003Cbr>℄ TRANSFORMER\u003Cbr>345kV BUS SUPPORT ℄\u003Cbr>345kV BREAKER ℄\u003Cbr>345kV CCVT ℄\u003Cbr>345kV SWITCH ℄\u003Cbr>ARREST ERS\u003Cbr>℄\u003Cbr>345kV DEAD END ℄ |  | NOTES |  |  |\n| --- | --- | --- | --- | --- | --- | --- |\n| AES Tit leblock 22X34 |  |  |  | 1. THIS IS A PRELIMINARY ELEVATION VIEW AND IS FOR PERMITTING PURPOSES ONLY.\u003Cbr>2. DESIGN IS PRELIMINARY AND SHALL BE FINALIZED AT DETAILED DESIGN PHASE.\u003Cbr>3. REFER TO DETAIL 7 ON SHEET C.10.05 |  |  |\n|  |  |  |  | LEGEND |  |  |\n|  |  |  |  | \u003Cbr>LIGHT (MAST/DEADEND)\u003Cbr>MATERIAL ITEM OR SUB ITEM NUMBER\u003Cbr>|  |  |\n|  |  |  |  | MINIMUM CLEARANCE REQUIREMENT |  |  |\n|  |  |  |  | 345kV MINIMUM CLEARANCE (1300kV BIL):\u003Cbr>LIVE PARTS: Ø-G=106\"\u003Cbr>Ø-Ø=119\"\u003Cbr>TO GRADE: 18'-0\" (BUS)\u003Cbr>30'-0\" (DRIVEWAY)\u003Cbr>34.5kV MINIMUM CLEARANCE (200kV BIL):\u003Cbr>LIVE PARTS: Ø-G=13\"\u003Cbr>Ø-Ø=18\"\u003Cbr>TO GRADE: 10'-0\" (BUS)\u003Cbr>22'-0\" (DRIVEWAY) |  |  |\n|  |  |  |  | DRAWING NU","cbCaiey30RPvOcdX","https://ap.wps.com/l/cbCaiey30RPvOcdX","pdf",16847295,"English","# Preliminary facility substation drawings\n## Notes and construction requirements\n## Legend and equipment elements\n## Minimum clearance requirements\n## Drawing index and sheet descriptions\n## Permit/issuance and revision information","[{\"question\":\"What project and facility are these drawings for?\",\"answer\":\"They are for the Somerset Solar Project and its 345/34.5kV substation facility, including general plan and related elevation and plan views.\"},{\"question\":\"What construction and design notes are specified?\",\"answer\":\"The drawings specify preliminary design status, confirmation of phasing based on transmission line design, use of leveling nuts on steel structures, equipment mounted directly on pads, and ratings subject to study results.\"},{\"question\":\"What minimum clearance requirements are listed?\",\"answer\":\"Minimum clearance values are provided for 345kV and 34.5kV systems, including live part to grade and live part to live part clearance distances with specified assumptions (e.g., BIL conditions).\"}]","SOMERSET SOLAR PROJECT - 345/34.5kV SUBSTATION General Plan - Preliminary Drawings | PDF",1792817955,18]