[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-detail-111445-en":3,"doc-seo-111445-105":28,"detail-sidebar-cat-0-en-105":93},{"code":4,"msg":5,"data":6},0,"success",{"doc_id":7,"user_id":8,"nickname":9,"user_avatar":10,"doc_module":4,"category_id":11,"category_name":12,"doc_title":13,"doc_description":14,"doc_content":15,"file_id":16,"file_url":17,"file_type":18,"file_size":19,"view_count":20,"is_deleted":4,"is_public":20,"is_downloadable":20,"audit_status":20,"page_count":20,"language":21,"language_code":22,"site_id":23,"html_lang":22,"table_of_contents":24,"faqs":25,"seo_title":13,"seo_description":14,"update_tm":26,"read_time":27},111445,5909877438554,"Maeve","https://ap-avatar.wpscdn.com/avatar/5600025385ad2bf12a7?_k=1778553567797529272",8,"Research & Report","Somalia Infrastructure Development for Access and Jobs Project - Absence-of-Objection Approval - May 5, 2026","Financing has been approved on an absence-of-objection basis on Tuesday, May 5, 2026 for the Federal Republic of Somalia under Phase 1 of the multi-phase programmatic approach (MPA). The Executive Directors approved a financing envelope of US$500 million and a grant of SDR 56.1 million (US$76.1 million equivalent) for the Somalia Infrastructure Development for Access and Jobs Project. The approval is granted on the terms and conditions stated in the President’s Memorandum (IDA/R2026-0093, dated April 16, 2026), with Lailee Jane Moghtader recorded as abstaining.","Public Disclosure Authorized Public Disclosure Authorized  \nThe following item has been approved on an Absence-of-Objection Basis  \non Tuesday, May 5, 2026  \nFederal Republic of Somalia-Somalia Infrastructure Development for Access and Jobs Project as Phase 1 of the Multi-Phase Programmatic Approach (MPA)  \nThe Executive Directors approved on May 5, 2026 a financing envelope of US$500 million and a grant in the amount of SDR 56.1 million (US$76.1 million equivalent) to Federal Republic of Somalia for a Somalia Infrastructure Development for Access and Jobs Project as Phase 1 of the Multi-Phase Programmatic Approach (MPA) on the terms and conditions set out in the President’s Memorandum (IDA/R2026-0093, dated April 16, 2026) . Lailee Jane Moghtader wished to be recorded as abstaining.","cbCaibpU2YVZIXGR","https://ap.wps.com/l/cbCaibpU2YVZIXGR","pdf",105218,1,"English","en",105,"# Approval on Absence-of-Objection Basis\n## Approval Date and Scope\n## Financing Envelope and Grant Details\n## Reference Terms and Stated Memorandum","[{\"question\":\"What project was approved for Somalia on the absence-of-objection basis?\",\"answer\":\"The Somalia Infrastructure Development for Access and Jobs Project as Phase 1 of the Multi-Phase Programmatic Approach (MPA).\"},{\"question\":\"When was the approval issued?\",\"answer\":\"The approval was issued on Tuesday, May 5, 2026.\"},{\"question\":\"What financial amounts were approved?\",\"answer\":\"A financing envelope of US$500 million and a grant of SDR 56.1 million (US$76.1 million equivalent) were approved.\"},{\"question\":\"Who was recorded as abstaining and what document sets the terms?\",\"answer\":\"Lailee Jane Moghtader was recorded as abstaining. The terms are set out in the President’s Memorandum (IDA/R2026-0093, dated April 16, 2026).\"}]",1784490168,3,{"code":4,"msg":29,"data":30},"ok",{"site_id":23,"language":22,"slug":31,"title":13,"keywords":32,"description":14,"schema_data":33,"social_meta":88,"head_meta":90,"extra_data":92,"updated_unix":26},"somalia-infrastructure-development-for-access-and-jobs-project-absence-of-objection-approval-may-5-2026","",{"@graph":34,"@context":87},[35,51,66],{"@type":36,"itemListElement":37},"BreadcrumbList",[38,42,46,48],{"item":39,"name":40,"@type":41,"position":20},"https://docshare.wps.com","Home","ListItem",{"item":43,"name":44,"@type":41,"position":45},"https://docshare.wps.com/document/","Document",2,{"item":47,"name":12,"@type":41,"position":27},"https://docshare.wps.com/document/research-report/",{"item":49,"name":13,"@type":41,"position":50},"https://docshare.wps.com/document/somalia-infrastructure-development-for-access-and-jobs-project-absence-of-objection-approval-may-5-2026/111445/",4,{"url":49,"name":13,"@type":52,"author":53,"headline":13,"publisher":55,"fileFormat":58,"inLanguage":22,"description":14,"dateModified":59,"datePublished":60,"encodingFormat":58,"isAccessibleForFree":61,"interactionStatistic":62},"DigitalDocument",{"name":9,"@type":54},"Person",{"url":39,"name":56,"@type":57},"DocShare","Organization","application/pdf","2026-07-22","2026-07-19",true,{"@type":63,"interactionType":64,"userInteractionCount":20},"InteractionCounter",{"@type":65},"ViewAction",{"@type":67,"mainEntity":68},"FAQPage",[69,75,79,83],{"name":70,"@type":71,"acceptedAnswer":72},"What project was approved for Somalia on the absence-of-objection basis?","Question",{"text":73,"@type":74},"The Somalia Infrastructure Development for Access and Jobs Project as Phase 1 of the Multi-Phase Programmatic Approach (MPA).","Answer",{"name":76,"@type":71,"acceptedAnswer":77},"When was the approval issued?",{"text":78,"@type":74},"The approval was issued on Tuesday, May 5, 2026.",{"name":80,"@type":71,"acceptedAnswer":81},"What financial amounts were approved?",{"text":82,"@type":74},"A financing envelope of US$500 million and a grant of SDR 56.1 million (US$76.1 million equivalent) were approved.",{"name":84,"@type":71,"acceptedAnswer":85},"Who was recorded as abstaining and what document sets the terms?",{"text":86,"@type":74},"Lailee Jane Moghtader was recorded as abstaining. The terms are set out in the President’s Memorandum (IDA/R2026-0093, dated April 16, 2026).","https://schema.org",{"og:url":49,"og:type":89,"og:title":13,"og:site_name":56,"og:description":14},"article",{"robots":91,"canonical":49},"index,follow",{"doc_id":7,"site_id":23},{"code":4,"msg":5,"data":94},[95,99,103,107,112,117,122,125,130,133,137],{"id":20,"doc_module":4,"doc_module_name":44,"category_name":96,"show_sort_weight":97,"slug":98},"Story & Novel",90,"story-novel",{"id":45,"doc_module":4,"doc_module_name":44,"category_name":100,"show_sort_weight":101,"slug":102},"Literature",80,"literature",{"id":50,"doc_module":4,"doc_module_name":44,"category_name":104,"show_sort_weight":105,"slug":106},"Exam",70,"exam",{"id":108,"doc_module":4,"doc_module_name":44,"category_name":109,"show_sort_weight":110,"slug":111},5,"Comic",60,"comic",{"id":113,"doc_module":4,"doc_module_name":44,"category_name":114,"show_sort_weight":115,"slug":116},6,"Technology",50,"technology",{"id":118,"doc_module":4,"doc_module_name":44,"category_name":119,"show_sort_weight":120,"slug":121},7,"Healthcare",40,"healthcare",{"id":11,"doc_module":4,"doc_module_name":44,"category_name":12,"show_sort_weight":123,"slug":124},30,"research-report",{"id":126,"doc_module":4,"doc_module_name":44,"category_name":127,"show_sort_weight":128,"slug":129},9,"Religion & Spirituality",20,"religion-spirituality",{"id":128,"doc_module":4,"doc_module_name":44,"category_name":131,"show_sort_weight":128,"slug":132},"World Cup","world-cup",{"id":134,"doc_module":4,"doc_module_name":44,"category_name":135,"show_sort_weight":134,"slug":136},10,"Lifestyle","lifestyle",{"id":138,"doc_module":4,"doc_module_name":44,"category_name":139,"show_sort_weight":108,"slug":140},19,"General","general"]