[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-400006-105":3,"detail-sidebar-cat-0-en-105":81,"doc-detail-400006-en":131},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","smrt-group-review-202425-from-strength-to-strength-building-a-resilient-future","SMRT GROUP REVIEW 2024/25 - From Strength to Strength - Building a Resilient Future","","SMRT Group Review 2024/25 presents a year of major milestones and continuous improvement across transport expansion, operational launches, and organizational resilience. It highlights the opening of the Thomson-East Coast Line Stage 4, the start of the Jurong West bus package, and the launch of the Sentosa Express, alongside the Johor Bahru RTSO office and the RTS Link initiative. The report also covers September 2024 East-West Line disruption recovery, safety culture through the Rail Safety Experiential Centre, and the “A Happier Workplace” programme.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/smrt-group-review-202425-from-strength-to-strength-building-a-resilient-future/400006/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/smrt-group-review-202425-from-strength-to-strength-building-a-resilient-future/400006.png","ImageObject",300,407,{"name":42,"@type":43},"Aran","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-11-27","2026-09-27",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",12,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What major projects and service launches are highlighted in the review?","Question",{"text":63,"@type":64},"The review features the opening of the ThomsonEast Coast Line Stage 4, the first bus from Soon Lee Depot and the start of the Jurong West bus package, and the beginning of SMRT’s operation of the Sentosa Express.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"How does the report describe SMRT’s response to the September 2024 East-West Line disruption?",{"text":68,"@type":64},"It describes a six-day disruption as a test of resilience, with engineering teams repairing tracks and staff supporting passengers through alternative routes and mutual assistance.",{"name":70,"@type":61,"acceptedAnswer":71},"What initiatives are used to reinforce SMRT’s safety culture and workplace wellbeing?",{"text":72,"@type":64},"Safety is reinforced through the tagline and through the SMRT Rail Safety Experiential Centre opened on 25 June 2024. Workplace wellbeing is addressed with the launch of “A Happier Workplace” on 13 November 2024.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},400006,1791140321,{"code":4,"msg":82,"data":83},"success",[84,88,92,96,101,106,111,115,120,123,127],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":89,"show_sort_weight":90,"slug":91},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":93,"show_sort_weight":94,"slug":95},"Exam",70,"exam",{"id":97,"doc_module":4,"doc_module_name":25,"category_name":98,"show_sort_weight":99,"slug":100},5,"Comic",60,"comic",{"id":102,"doc_module":4,"doc_module_name":25,"category_name":103,"show_sort_weight":104,"slug":105},6,"Technology",50,"technology",{"id":107,"doc_module":4,"doc_module_name":25,"category_name":108,"show_sort_weight":109,"slug":110},7,"Healthcare",40,"healthcare",{"id":112,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":113,"slug":114},8,30,"research-report",{"id":116,"doc_module":4,"doc_module_name":25,"category_name":117,"show_sort_weight":118,"slug":119},9,"Religion & Spirituality",20,"religion-spirituality",{"id":118,"doc_module":4,"doc_module_name":25,"category_name":121,"show_sort_weight":118,"slug":122},"World Cup","world-cup",{"id":124,"doc_module":4,"doc_module_name":25,"category_name":125,"show_sort_weight":124,"slug":126},10,"Lifestyle","lifestyle",{"id":128,"doc_module":4,"doc_module_name":25,"category_name":129,"show_sort_weight":97,"slug":130},19,"General","general",{"code":4,"msg":82,"data":132},{"doc_id":79,"user_id":133,"nickname":42,"user_avatar":134,"doc_module":4,"category_id":112,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":135,"file_id":136,"file_url":137,"file_type":138,"file_size":139,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":140,"language":141,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":142,"faqs":143,"seo_title":144,"seo_description":12,"update_tm":145,"read_time":146,"preview_page_count":147,"preview_urls":148},137455076865,"https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","From Strength to Strength: Building a Resilient Future  \nSMRT Corporation Ltd Group Review 2024/25  \nA YEAR IN REVIEW  \nThe year was packed with moments to remember. On 21 June 2024, Prime Minister Lawrence Wong launched the opening of the ThomsonEast Coast Line Stage 4 (TEL4). This was a project that took more than a decade to realise, disrupted as it was by a pandemic. In his speech, PM Wong reminisced about growing up in Marine Parade and wishing there was the MRT to take him places. He also reminded us how the MRT now makes school journeys that much shorter, and a trip from east to west that much faster. And in true Singapore spirit, we don't just look back or stay in the present. We are already looking forward to TEL5, eventually linking up to Terminal 5 and connecting to the rest of the world.  \nCONNECTIONS  \nA YEAR IN REVIEW  \nIt was a year of many firsts.  \nA very special memory this year was the flag-off of the first bus from Soon Lee Depot at 05:00 hours. This marked the start of SMRT’s operation of the Jurong West bus package from 1 September 2024, covering 26 bus services in the west. We’re psyched that many loyal bus enthusiasts could join us on these first rides, and we are all set to create many new memories for all our commuters.  \nBEGINNINGS  \nA YEAR IN REVIEW  \nOur transport footprint expanded to Sentosa on  \n1 September 2024. On this day, STRIDES Engineering President, Lee Ling Wee, and Assistant Chief Executive of Sentosa Development Corporation (SDC), Heah Soon Poh, hopped on a ride from VivoCity station to Beach station together, to mark the start of SMRT’s operation of the Sentosa Express.  \nThis opens a new chapter in the history of island transport on Sentosa, where we hope to deliver our travellers to more stops for fun, sun and adventure.  \nEXPANSION  \nA YEAR IN REVIEW  \nAnother new chapter was initiated with the opening of the RTSO office in Johor Bahru. The RTS Link—or the Rapid Transit System Link—is the new line that will connect Bukit Chagar in Johor Bahru to Woodlands North in Singapore. When completed, it will connect the peoples of Johor Bahru and Singapore with greater speed. The ambitions and hopes are not just in the flow of people, but in the flow of investments and ideas, alongside the development of the Johor-Singapore Special Economic Zone.  \nMOMENTUM  \nA YEAR IN REVIEW  \nThe six-day disruption on the East-West Line in September 2024 was undoubtedly a test of SMRT’s resilience. But every trial has a silver lining. As our engineering teams raced to repair the tracks, we witnessed a massive organic effort by all our staff, coming together to help passengers navigate alternative routes, and to support one another.  \nThis was teamwork and corporate grit in motion.  \nRESILIENCE  \nA YEAR IN REVIEW  \nSafety is a constant refrain at SMRT. It’s captured in the tagline“Think Safety, Work Safely, Go Home Safe”. It’s written into a pledge and recited at safety forums. And now, it’s showcased at a space we call the SMRT Rail Safety Experiential Centre. Opened on 25 June 2024, it takes a bold, honest look at past incidents, and inspires visitors to reflect on safety lapses—and turn a refrain into consistent action.  \nSAFETY  \nA YEAR IN REVIEW  \nOn 13 November 2024, we took a moment to launch what we call “A Happier Workplace”. This is many things all at once—a starting place, an extended journey, and a clear destination. A Happier Workplace is a work-in-progress, and a goal worth working towards. We are reminded of the values we hold dear, and of carrying the banners of safety, service excellence and Kaizen together, to create the desired energy and fuel, and a sense of deep inner joy.  \nHAPPINESS  \nCONTENT  \n09-17 18-19 20-21 22-33 34-42 43-63 64-71 72-80 81-86 87-91 92-96  \n97-110  \n111-125  \n126-128  \nThis report outlines  \nOur Story  \nMessage from Chairman and Group CEO Board of Directors and Senior Management Chapter 1: SMRT Trains  \nChapter 2: SMRT Buses  \nChapter 3: STRIDES  \nChapter 4: Stell","cbCaiaLiX6uJpK0s","https://ap.wps.com/l/cbCaiaLiX6uJpK0s","pdf",12423405,130,"English","# Our Story\n## Chairman and Group CEO Message\n## Board of Directors and Senior Management\n# Chapter 1: SMRT Trains\n# Chapter 2: SMRT Buses\n# Chapter 3: STRIDES\n# Chapter 4: Stellar Lifestyle\n# Chapter 5: Human Capital\n# Chapter 6: Safety & Security\n# Chapter 7: Kaizen\n# Chapter 8: Sustainability\n# Chapter 9: Commuters and Community\n# Chapter 10: Corporate Governance\n# Chapter 11: Awards and Accolades","[{\"question\":\"What major projects and service launches are highlighted in the review?\",\"answer\":\"The review features the opening of the ThomsonEast Coast Line Stage 4, the first bus from Soon Lee Depot and the start of the Jurong West bus package, and the beginning of SMRT’s operation of the Sentosa Express.\"},{\"question\":\"How does the report describe SMRT’s response to the September 2024 East-West Line disruption?\",\"answer\":\"It describes a six-day disruption as a test of resilience, with engineering teams repairing tracks and staff supporting passengers through alternative routes and mutual assistance.\"},{\"question\":\"What initiatives are used to reinforce SMRT’s safety culture and workplace wellbeing?\",\"answer\":\"Safety is reinforced through the tagline and through the SMRT Rail Safety Experiential Centre opened on 25 June 2024. Workplace wellbeing is addressed with the launch of “A Happier Workplace” on 13 November 2024.\"}]","SMRT GROUP REVIEW 2024/25 - From Strength to Strength - Building a Resilient Future | PDF",1790506380,328,13,[149,153,156,160,163,167,171,174,178,181,185,189,193],{"page_no":22,"url":150,"width":151,"height":152},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/ef199a26ef25c166f2146b9c1b6750c0.webp",983,552,{"page_no":26,"url":154,"width":155,"height":152},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/91f9cbfe41c01198491b767ef2bcd8af.webp",982,{"page_no":30,"url":157,"width":158,"height":159},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/de42d9ffe49d5e29844685680a000f88.webp",981,551,{"page_no":33,"url":161,"width":162,"height":159},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/6af0ef32e171dccde24268c104ee796b.webp",980,{"page_no":97,"url":164,"width":165,"height":166},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/1975a2caccc1cf5dfa23d79b1d3bf7e4.webp",979,550,{"page_no":102,"url":168,"width":169,"height":170},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/22a1d72c6607d31c898da94d68406ca7.webp",978,549,{"page_no":107,"url":172,"width":173,"height":170},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/29f10fc33beeca2e1a9d925a7c225b6e.webp",977,{"page_no":112,"url":175,"width":176,"height":177},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/a174661011b4132c4ec13b28a99e1271.webp",976,548,{"page_no":116,"url":179,"width":180,"height":177},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/6e9f2ce7897acbc300b25feaa51d3557.webp",975,{"page_no":124,"url":182,"width":183,"height":184},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/69ea108eee68a4b5887ffd139963019c.webp",974,547,{"page_no":186,"url":187,"width":188,"height":184},11,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/aedbcb9b160cb34ebc3d116b65987f0a.webp",973,{"page_no":55,"url":190,"width":191,"height":192},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/1b4823e291b6cc6999a280a2855f5c33.webp",972,546,{"page_no":147,"url":194,"width":195,"height":196},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/f32008f63b963be86fbc199c8be53ebe.webp",971,545]