[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-641286-105":59,"doc-detail-641286-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","smeg-ecoline-undercounter-user-guide-operation-and-cleaning","Smeg Ecoline Undercounter - User Guide - Operation and Cleaning","","Smeg Ecoline undercounter user guidance covering daily operation, program selection, and on-screen status messages. It explains how to start the machine from standby, interpret L1/L2/L3 indicator lights, load and unload cycles, and run the P0 wash-tank water exchange during a shift for continued performance. The guide also details end-of-shift draining, inspection and cleaning of filters and wash/rinse arms, nozzle and spindle checks, and critical safety notes such as keeping the door closed during key phases and avoiding operation while filters are removed.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":30,"@type":76,"position":81},"https://docshare.wps.com/document/technology/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/smeg-ecoline-undercounter-user-guide-operation-and-cleaning/641286/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/smeg-ecoline-undercounter-user-guide-operation-and-cleaning/641286.png","ImageObject",300,407,{"name":92,"@type":93},"4398046744996","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-26","2026-10-22",true,{"@type":102,"interactionType":103,"userInteractionCount":8},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"How do you turn on the Smeg Ecoline undercounter machine and verify it is ready?","Question",{"text":112,"@type":113},"Press and hold the on/off button with the door closed to switch on; L1 turns green and the display shows the software version, temperatures, and then FILL. After heating, the display rotates between END and the last used program with L3 lit solid, indicating the machine is ready.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What does the P0 program do during a shift and how is it activated?",{"text":117,"@type":113},"P0 exchanges the wash tank water during the shift. To activate it, press and hold the first two program buttons until four dashes (----) appear and the progress bars start, then the display flashes FILL when the wash tank is empty to allow opening and cleaning.",{"name":119,"@type":110,"acceptedAnswer":120},"Which parts must be cleaned during P0 or end-of-shift maintenance?",{"text":121,"@type":113},"Remove and clean all filters plus the upper and lower wash and rinse arms. Inspect wash/rinse arm nozzles and arm hubs for blockages, ensure filters are free of dirt or grime, and clean the stainless steel upper and lower spindles that the arms attach to.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},641286,1793051447,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":66,"doc_module":4,"category_id":29,"category_name":30,"doc_title":65,"doc_description":67,"doc_content":133,"file_id":134,"file_url":135,"file_type":136,"file_size":137,"view_count":8,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":19,"language":138,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":139,"faqs":140,"seo_title":141,"seo_description":67,"update_tm":142,"read_time":52},4398046744996,"Smeg Ecoline Undercounter-User Guide  \nL1 L2 L3  \n\n| Symbol | Description | Symbol | Description |\n| --- | --- | --- | --- |\n| | On / Off Button | | Low Salt Warning Light\u003Cbr>(On Models With Water Softeners) |\n| | Drain Button | L1  | Mains Power Off |\n| | Program 1 (1min 30secs) | L1  | Mains Power On |\n| | Program 2 (2mins 30secs) | L2  | Drain Cycle In Progress |\n| | Program 3 (4mins) | L3  | Solid Light Indicates Program SelectedFlashing Light Indicates Program\u003Cbr>Selected In Operation (keep door closed) |\n\n\n| On Screen Message | Message Description |\n| --- | --- |\n| | Machine in standby mode (press and hold on/off button to turn machine on) |\n| | Software version uploaded on the machine (shown briefly when the machine is turned on) *this could be different to the one pictured |\n| | Close the door of the machine to allow it to fill, allow it to wash or allow it to drain |\n| | Machine filling and heating, keep door closed |\n| | Selected program progress bars (bars progress from left to right across the screen) |\n| | Last selected program has finished (or machine has finished filling from being empty) *for example could display P1 END, P2 END or P3 END |\n| | Machine draining down (keep the door closed) |\n| | Machines rinse boiler (°b) and wash tank (°t) temperatures shown one after the other |\n\nBefore you start any shift, it is your responsibility to CHECK:  \n| Check the levels in the detergent and rinse aid containers, if either of them are low replace them now to prevent them running out during your shift | (if applicable) Check to see if the low salt warning light is on, if it is, remove the cap and top up the salt with granular salt. If the machine is already full of water, perform a P0 |  | Check that all the machines filters are clean, free from debris and blockages. Check they are all located correctly in position. If the machine is already full, perform a P0 program before removing the main large filter to clean | Check the upper and lower wash and rinse arms are clean, free from debris and blockages. Check they are all located correctly in position and spin freely to ensure best wash results during your shift |\n| --- | --- | --- | --- | --- |\n|  | program to replace the wash water afterwards | |  |  |\n| | |  | | |\n\nStart of the shift and daily use of the machine:  \n\n| 1 | | With the door closed: Press and hold the on/off button for a few seconds. The L1 light will turn green and the display shows the scrolling software version uploaded on the machine.\u003Cbr>This is followed by the rinse boiler and wash tank temperatures, then by the word FILL. Once heated, the water will empty and part fill the wash tank. This process repeats several times until the wash tank is full (approx. 10-20mins) |\n| --- | --- | --- |\n| 2\u003Cbr>|  | Once ready for use the machine will rotate on the display between the word END and the program last used with the L3 light lit solid above the program button. The machine is now ready for use |\n| 3\u003Cbr>|  | Open the door and load the basket, close the door and press and hold the required program button to start the cycle, the L3 light will start to flash to indicate the cycle has started |\n| 4 | | At the end of the program the machine will display the word END and the L3 light will stop flashing and become solid again, open the door and remove the basket, then repeat process 3 |\n| 5 | | Every 20 or 30 cycles, inspect the top filters inside the machine for food debris, if heavily soiled perform a P0 program and then remove carefully and clean as required.\u003Cbr>IMPORTANT-Do not operate the machine whilst this filter is removed |\n\nP0 Program / wash tank water exchange during the shift:  \n\n| 1\u003Cbr>|  | To active P0, press and hold the first two program buttons for a few seconds until the four dashes (----) appear on the screen and then the first of the progress bars appear |\n| --- | --- | --- |\n| 2 | | The bars will progress across the screen and once the wash tank is empty the display will show the continuousl","cbCaij9KjEfsSaT0","https://ap.wps.com/l/cbCaij9KjEfsSaT0","pdf",1075106,"English","# Start of the shift and daily use of the machine\n## Step-by-step startup and ready state\n## Loading a program cycle\n## End-of-program steps\n## Routine filter inspection every 20 or 30 cycles\n\n# P0 program / wash tank water exchange during the shift\n## Activating P0\n## Opening for emptying and cleaning\n## Cleaning filters and wash/rinse arms\n## Reassembly and refilling\n\n# End of the shift, drain and clean down of the machine\n## Activating drain cycle\n## Post-drain shutdown and standby\n## Cleaning filters and wash/rinse components","[{\"question\":\"How do you turn on the Smeg Ecoline undercounter machine and verify it is ready?\",\"answer\":\"Press and hold the on/off button with the door closed to switch on; L1 turns green and the display shows the software version, temperatures, and then FILL. After heating, the display rotates between END and the last used program with L3 lit solid, indicating the machine is ready.\"},{\"question\":\"What does the P0 program do during a shift and how is it activated?\",\"answer\":\"P0 exchanges the wash tank water during the shift. To activate it, press and hold the first two program buttons until four dashes (----) appear and the progress bars start, then the display flashes FILL when the wash tank is empty to allow opening and cleaning.\"},{\"question\":\"Which parts must be cleaned during P0 or end-of-shift maintenance?\",\"answer\":\"Remove and clean all filters plus the upper and lower wash and rinse arms. Inspect wash/rinse arm nozzles and arm hubs for blockages, ensure filters are free of dirt or grime, and clean the stainless steel upper and lower spindles that the arms attach to.\"}]","Smeg Ecoline Undercounter - User Guide - Operation and Cleaning | PDF",1792713431]