[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-649074-105":59,"doc-detail-649074-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","sioux-falls-regional-airport-terminal-parking-access-improvements-as-built-plans","Sioux Falls Regional Airport Terminal Parking - Access Improvements - As-Built Plans","","As-built construction plans for the Sioux Falls Regional Airport terminal parking and access improvements project in Minnehaha County, South Dakota. Prepared under direct supervision of the engineer, with certification of compliance to FAA advisory circulars and federal standards. Includes location/vicinity maps, index of plan sheets, general notes, and detailed drawings covering grading, curb & gutter, pavement layout, surfacing, drainage, erosion control, utilities, and landscaping/irrigation. A bid schedule lists pavement markings, signs, lighting, and sitework quantities and units.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/sioux-falls-regional-airport-terminal-parking-access-improvements-as-built-plans/649074/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/sioux-falls-regional-airport-terminal-parking-access-improvements-as-built-plans/649074.png","ImageObject",300,407,{"name":92,"@type":93},"Terk","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-25","2026-10-23",true,{"@type":102,"interactionType":103,"userInteractionCount":81},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What project does the as-built plans cover?","Question",{"text":112,"@type":113},"The plans cover reconstruction of terminal parking, access improvements, and miscellaneous items for the Sioux Falls Regional Airport.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"Which standards are the plans certified against?",{"text":117,"@type":113},"The plans state compliance with FAA advisory circulars and federal aviation standards, with no required deviations beyond previously approved items.",{"name":119,"@type":110,"acceptedAnswer":120},"What major plan sheet areas are included?",{"text":121,"@type":113},"Included areas span traffic control and construction sequencing, erosion and sediment control, existing conditions and demolition, utilities, grading, curb and gutter/pavement layout, surfacing, pavement markings, lighting and power, landscaping and irrigation, and details/standard plates.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},649074,1792919192,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":81,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":144,"read_time":145},1099525198933,"https://ap-avatar.wpscdn.com/davatar_155a257f0dc6eb9ab79c44ca47cae57d","# CONSTRUCTION PLANSFOR\n\nSIOUX FALLSREGIONAL AIRPORT  \nSIOUX FALLS,MINNEHAHA COUNTY,SOUTH DAKOTA  \nLOCATION MAP  \nMarch 2011AIP NO.3-46-0050-042-2011  \nAS-BUILT DRAWINGSPREPARED BY:GOLDSMITH HECK ENGINEERS,INC.GENERAL CONTRACTOR:ASPHALT SURFACING COMPANYCONSTRUCTED:APRIL-NOVEMBER 2011  \nRECONSTRUCT TERMINAL PARKING,ACCESS IMPROVEMENTS&MISCELLANEOUS ITEMS  \nPLANS AND SPECIFICATIONS WERE DEVELOPED UNDER MY DIRECT SUPERVISIONINACCORDANCF WITH AII APPI ICARIF FFDFRAI STANDARDS ANDREQUIREMENTS,AND THAT NO DEVIATION FROM OR MODIFICATIONS TOSTANDARDS AS SETFORTH IN THE FEDERALAVIATION ADMINISTRATIONADVISORY CIRCULARS WILL BE NECESSARY OTHER THAN THOSE PREVIOUSLYAPPROVED BY THE FAAMARK D.WIEDERRICH,PE/LSS.D.NO.5168DATESPONSOR APPROVALIHEREBYAPPROVE THESE PROJECT PLANS AND SPECIFICATIONS,CERTIFIED BYALICENSED PROFESSIONAL ENGINEER THAT THEY HAVE BEEN DEVELOPED TOTHE BEST OF HIS PROFESSIONALABILITY INACCORDANCE WITHFEDERALSTANDARDSAS SET FORTH IN THE FAAADVISORY CIRCULARS ANDTHATNO DEVIATIONS WILL BE NECESSARYOTHERTHAN THOSE PREVIOUSLYAPPROVEDBY THE FAA.SIOUX FALL REGIONALAIRPORT AUTHORITYDANLETELLIER EXECLITIVE DIRECTORDATEACCEPTEDSOUTH DAKOTA DEPARTMENT OF TRANSPORTATIONBRUCE LINDHOLM,PE.DATEPROGRAMMANAGEROFFICE OF AERONAUTICS  \nNOTE:ALL SHEETS IN THIS AS-BUILT PLAN SET HAVE NOT BEENUPDATED.ONLY SHEETS WITH THE AS-BUILT STAMP HAVE BEEN  \nUPDATED TO REFLECT SIGNIFICANT CHANGES DURING CONSTRUCTION.  \nVICINITY MAP  \nINDEX OF SHEETS  \nSHEET NO.A1 THRU A3  \nTITLE SHEET,LEGEND OF SYMBOLS,  \nORIENTATION/CONTROL DATA/ALIGNMENTS  \nSHEET NO.B1 THRU B4  \nESTIMATE OF QUANTITIES,TABLE OF STORM SEWER PIPE,  \nTABLE OF DROP INLETS &JUNCTION BOXES  \nSHEET NO.C1 THRU C1  \nTYPICAL SECTIONS  \nSHEET NO.D1 THRU D6  \nGENERAL NOTES  \nSHEET NO.E1 THRU E9  \nSEQUENCE OF OPERATIONS/TRAFFIC CONTROL  \nSHEET NO.F1 THRU F17  \nEROSION&SEDIMENT CONTROL PLAN  \nSHEET NO.G1 THRU G5  \nEXISTING CONDITIONS &DEMOLITION PLAN  \nSHEET NO.H1 THRU H8  \nUTILITIES  \nSHEET NO.I1 THRU 15  \nGRADING  \nSHEET NO.J1 THRU J8  \nCURB &GUTTER AND PAVEMENT LAYOUT  \nSHEET NO.K1 THRU K2  \nSURFACING  \nSHEET NO.L1 THRU L5  \nPAVEMENT MARKINGS  \nSHEET NO.M1 THRU M9  \nSIGNS  \nSHEET NO.N1 THRU N13  \nLIGHTING &POWER  \nSHEET NO 01THRU Q21  \nLANDSCAPING &IRRIGATION  \nSHEET NO.P1 THRU P15  \nARCHITECTURAL SIGNS &STRUCTURES  \nSHEET NO.Q1 THRU Q31  \nDETAILS/STANDARD PLATES  \nPlans By:  \n524N.Sycamore Ave.,Suite 1-Sioux Falls,SD 57110-Ph:605.332.9685  \nTERMINAL PARKING& ACCESSIMPROVEMENTS  \nBID SCHEDULE1(AIRPORT FUNDED)  \n\n| ITEM  \u003Cbr>NO.   | STD  \u003Cbr>BIDITEM   | ITEM DESCRIPTION   | UNIT   | APPROX.  \u003Cbr>QUANT.   |\n| --- | --- | --- | --- | --- |\n| PAVEMENT   |  |  MARKINGS&PERMANENT SIGNS   |  |  |\n| 130   | 633.1400   | Pavement Marking Paint,4\"White   | Ft   | 137   |\n| 131   | 633.1405   | Pavement Marking Paint,4\"Yellow   | Ft   | 44,087   |\n| 132   | 633.1430   | Pavement Marking Paint,24\"White   | Ft   | 77   |\n| 133   | Special   | Wheelchair Symbol,White Paint   | Each   | 29   |\n| 134   | Special   | Remove Traffic Sign   | Each   | 120   |\n| 135   | 110.5021   | Salvage Traffic Sign for Reset   | Each   | 4   |\n| 136   | 632.1320   | 2.0\"x2.0\"Perforated Tube Post   | Ft   | 307   |\n| 137   | 632.1330   | 2.25”x2.25\"Perforated Tube Post   | Ft   | 140   |\n| 138   | 632.1340   | 2.5\"x2.5\"Perforated Tube Post   | Ft   | 60   |\n| 139   | Special   | Furnish Sheet Aluminum Sign w ith Reflective Sheeting   | SqFt   | 93   |\n| 140   | 632.3060   | Install Traffic Sign on Post   | Each   | 86.0   |\n| 141   | 632.3065   | Install Traffic Sign on Street Light   | Each   | 4.0   |\n| 142   | Special   | Cantilever Sign Structure   | LS   | 1.0   |\n| MEDIANLA   |  | NDSCAPING &IRRIGATION   |  |  |\n| 143   | 120.6300   | Water For Vegetation(shrubs and spaded trees)   | MGal   | 50   |\n| 144   | Special   | Soil Preparation,Tll &Fine Grade for Law n and Landscape   | MSf   | 295   |\n| 145   | 730.0251   | Special Permanent Seed Mixture   | LB   | 1,970   |\n| 146   | 731.0100   | Fertilizing   | LB   | 1,468   |","cbCaipF9Lh9g3Tsa","https://ap.wps.com/l/cbCaipF9Lh9g3Tsa","pdf",61100406,171,"English","# Location Map\n## Index of Sheets\n## Bid Schedule (Airport Funded)","[{\"question\":\"What project does the as-built plans cover?\",\"answer\":\"The plans cover reconstruction of terminal parking, access improvements, and miscellaneous items for the Sioux Falls Regional Airport.\"},{\"question\":\"Which standards are the plans certified against?\",\"answer\":\"The plans state compliance with FAA advisory circulars and federal aviation standards, with no required deviations beyond previously approved items.\"},{\"question\":\"What major plan sheet areas are included?\",\"answer\":\"Included areas span traffic control and construction sequencing, erosion and sediment control, existing conditions and demolition, utilities, grading, curb and gutter/pavement layout, surfacing, pavement markings, lighting and power, landscaping and irrigation, and details/standard plates.\"}]","Sioux Falls Regional Airport Terminal Parking - Access Improvements - As-Built Plans | PDF",1792797185,431]