[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-664239-105":59,"doc-detail-664239-en":129},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":122,"head_meta":124,"extra_data":126,"updated_unix":128},105,"en","singapore-bim-guide-version-2-technical-reference-and-delivery-guidance","Singapore BIM Guide - Version 2 - Technical reference and delivery guidance","","Singapore BIM Guide Version 2 provides guidance for Building Information Modelling in Singapore, acknowledging the roles of the BIM Steering Committee and BIM Guide Workgroup. The guide outlines BIM deliverables, key BIM processes for modelling and collaboration, and identifies BIM professionals such as BIM Manager and BIM Coordinator. It also covers execution planning, BIM elements and attributes, model progression, BIM vs 2D practices, and expectations around responsibilities and value-added services.",{"@graph":69,"@context":121},[70,84,104],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/singapore-bim-guide-version-2-technical-reference-and-delivery-guidance/664239/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":98,"encodingFormat":97,"isAccessibleForFree":99,"interactionStatistic":100},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/singapore-bim-guide-version-2-technical-reference-and-delivery-guidance/664239.png","ImageObject",300,407,{"name":92,"@type":93},"วิน","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-29",true,{"@type":101,"interactionType":102,"userInteractionCount":29},"InteractionCounter",{"@type":103},"ViewAction",{"@type":105,"mainEntity":106},"FAQPage",[107,113,117],{"name":108,"@type":109,"acceptedAnswer":110},"What does the Singapore BIM Guide Version 2 cover?","Question",{"text":111,"@type":112},"It covers BIM deliverables and processes for modelling and collaboration, execution planning, BIM elements and their attributes, and the responsibilities and expectations for BIM professionals.","Answer",{"name":114,"@type":109,"acceptedAnswer":115},"How does the guide distinguish BIM elements and their attributes?",{"text":116,"@type":112},"It presents BIM elements and then details attributes such as model progression, along with comparisons like BIM versus 2D practices.",{"name":118,"@type":109,"acceptedAnswer":119},"What collaboration and production topics are included in the BIM modelling and collaboration procedures?",{"text":120,"@type":112},"The guide includes individual discipline modelling, cross-disciplinary model coordination, documentation production (including publishing 2D drawings and exchange formats), data security and saving, and quality assurance/quality control.","https://schema.org",{"og:url":83,"og:type":123,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":125,"canonical":83},"index,follow",{"doc_id":127,"site_id":62},664239,1793246746,{"code":4,"msg":5,"data":130},{"doc_id":127,"user_id":131,"nickname":92,"user_avatar":132,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":133,"file_id":134,"file_url":135,"file_type":136,"file_size":137,"view_count":29,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":21,"language":138,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":139,"faqs":140,"seo_title":141,"seo_description":67,"update_tm":128,"read_time":142},2336475104736,"https://ap-avatar.wpscdn.com/avatar/22000c4c5e0e5b17e70?x-image-process=image/resize,m_fixed,w_180,h_180&k=1786591360781797222","Singapore BIM Guide Version 2  \nBCA acknowledges the leadership provided by the BIM Steering Committee in support of the production of the Singapore BIM Guide.  \nThe Singapore BIM Guide has been drafted by the BIM Guide Workgroup on behalf of BCA and the BIM Steering Committee.  \n©Building and Construction Authority 2013  \nBuilding and Construction Authority  \n5 Maxwell Road  \n\\#16-00 Tower Block MND Complex Singapore 059110  \n[www.bca.gov.sg](www.bca.gov.sg)  \nFirst published May 2012  \n2nd Version August 2013  \nWhile every effort has been made to ensure the accuracy and quality of information contained in this publication, the Building and Construction Authority, its employees, agents or industry partners can take no responsibility for the subsequent use of this information, nor for any errors or omissions that it may contain.  \nCover image and design courtesy of RSP Architects Planners & Engineers (Pte) Ltd and the BCA Academy of the Built Environment.  \nContents  \nCEO’s Message___________________________________________________________________iii  \nBIM STEERING COMMITTEE ________________________________________________________ iv  \nBIM GUIDE WORKGROUP __________________________________________________________vi  \n1 INTRODUCTION ______________________________________________________________ 1  \nBIM Deliverables _________________________________________________________________________1  \nBIM Processes (Modelling and Collaboration Procedures) ________________________________________1  \nBIM Professionals (BIM Manager and BIM Coordinator) __________________________________________2  \n2 BIM EXECUTION PLAN _________________________________________________________ 3  \n3 BIM DELIVERABLES ___________________________________________________________ 5  \n3.1 BIM Elements_______________________________________________________________________5  \n3.2 Attributes of BIM Elements____________________________________________________________6  \n3.2.1 Model Progression_______________________________________________________________6  \n3.2.2 BIM vs 2D Practices ______________________________________________________________8  \n3.3 BIM Objective & Responsibility Matrix__________________________________________________11  \n3.3.1 Model Author _________________________________________________________________12  \n3.3.2 Model Users___________________________________________________________________12  \n3.4 Compensation Expectations __________________________________________________________13  \n3.5 Other Additional Value-added BIM Services _____________________________________________14  \n4. BIM Modelling and Collaboration Procedures______________________________________ 15  \n4.1 Individual Discipline Modelling________________________________________________________16  \n4.1.1 Modelling Guidelines for BIM Elements_____________________________________________16  \n4.1.2 Modelling Guidelines for Regulatory Submission______________________________________16  \n4.1.3 Model Orientation______________________________________________________________16  \n4.1.4 Model Division and Structure _____________________________________________________17  \n4.1.5 Revision Management___________________________________________________________17  \n4.2 Cross-disciplinary Model Coordination__________________________________________________17  \n4.2.1 Types of Model Coordination _____________________________________________________20  \n4.3 Model & Documentation Production ___________________________________________________21  \n4.3.1 Publishing 2D Drawings__________________________________________________________21  \n4.3.2 BIM Exchange Formats __________________________________________________________22  \n4.3.3 Documentation after Coordination_________________________________________________22  \n4.4 Data Security & Saving ______________________________________________________________22  \n4.5 Quality Assurance and Quality Control__________________________________________________23  \n4.6 W","cbCaic6aIdKL5etX","https://ap.wps.com/l/cbCaic6aIdKL5etX","pdf",1907641,"English","# CEO’s Message\n# BIM STEERING COMMITTEE\n# BIM GUIDE WORKGROUP\n# 1 INTRODUCTION\n## BIM Deliverables\n## BIM Processes (Modelling and Collaboration Procedures)\n## BIM Professionals (BIM Manager and BIM Coordinator)\n# 2 BIM EXECUTION PLAN\n# 3 BIM DELIVERABLES\n## BIM Elements\n## Attributes of BIM Elements\n## BIM Objective & Responsibility Matrix\n## Compensation Expectations\n## Other Additional Value-added BIM Services\n# 4 BIM Modelling and Collaboration Procedures\n## Individual Discipline Modelling\n## Cross-disciplinary Model Coordination\n## Model & Documentation Production\n## Data Security & Saving\n## Quality Assurance and Quality Control\n## Workflow of Design-Build Projects\n## Workflow of Design-Bid-Build Projects\n# 5 BIM Professionals\n# References\n# Appendix A – Typical BIM Elements by Discipline\n# Appendix B – BIM Objective & Responsibility Matrix (Basic)\n# Appendix C – BIM Modelling Guidelines","[{\"question\":\"What does the Singapore BIM Guide Version 2 cover?\",\"answer\":\"It covers BIM deliverables and processes for modelling and collaboration, execution planning, BIM elements and their attributes, and the responsibilities and expectations for BIM professionals.\"},{\"question\":\"How does the guide distinguish BIM elements and their attributes?\",\"answer\":\"It presents BIM elements and then details attributes such as model progression, along with comparisons like BIM versus 2D practices.\"},{\"question\":\"What collaboration and production topics are included in the BIM modelling and collaboration procedures?\",\"answer\":\"The guide includes individual discipline modelling, cross-disciplinary model coordination, documentation production (including publishing 2D drawings and exchange formats), data security and saving, and quality assurance/quality control.\"}]","Singapore BIM Guide - Version 2 - Technical reference and delivery guidance | PDF",176]