[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-665022-105":59,"doc-detail-665022-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","simple-office-fitout-common-requirements-execution","Simple Office Fitout - Common Requirements - Execution","","Office fitout specification outlining compliance and execution requirements for construction works. It covers additional work quality expectations, authority approvals, and base building obligations including site possession permissions, contractor checks, protection of base building fabric, and ownership rules for removed items. It specifies services installation methods for penetrations, fixing to non-structural elements, maintaining structural/fire/acoustic properties, and completion deliverables such as record drawings, product data, warranties, and maintenance instructions.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/simple-office-fitout-common-requirements-execution/665022/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/simple-office-fitout-common-requirements-execution/665022.png","ImageObject",300,407,{"name":92,"@type":93},"ahduag","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-29",true,{"@type":102,"interactionType":103,"userInteractionCount":8},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What approvals and compliance requirements must the fitout contractor follow?","Question",{"text":112,"@type":113},"The work must comply with the National Construction Code, building approvals, and local/state government authority requirements. A building fitout guide must be followed if required by the lease.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"How should electrical and hydraulic work personnel be handled?",{"text":117,"@type":113},"Electrical and plumbing works must use only state or territory licensed personnel.",{"name":119,"@type":110,"acceptedAnswer":120},"What must be provided in the project folder at completion?",{"text":121,"@type":113},"A project folder must include record drawings (as built), product data with maintenance/cleaning instructions, product warranties with specified durations, an air-conditioning record drawing showing adjusted measured quantities, and maintenance requirements for fire extinguishers and fire blankets to AS 1851.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},665022,1793286472,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":8,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":14,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":24},3985747870414,"https://ap-avatar.wpscdn.com/davatar_9964176cb1d06d4a9deccf72a44ae3dc","0180 COMMON REQUIREMENTS  \n1 GENERAL  \n1.1 ADDITIONAL WORK  \nQuality  \nWorks beyond the scope of this specification: To the general quality of this fitout specification.  \n1.2 AUTHORITIES  \nCompliance  \nConform to the following:  \n- The National Construction Code.  \n- Any building approvals.  \n- The requirements of local and state or territory government authorities.  \n- A building fitout guide, if required by the lease.  \nElectrical and hydraulic services  \nElectrical and plumbing works: Use only state or territory licensed personnel.  \n1.3 BASE BUILDING  \nPossession of site  \nPermission: Obtain permission and conditions of work required by the building owner or their representative.  \nContractor to check  \nGeneral: Review the following and recommend remedial actions if required:  \n- Base building fabric: Inspect the base building and notify the tenant of any shortcomings that would affect the fitout works.  \n- Floor loads: Check adequacy for a compactus or other heavy items.  \n- Air conditioning: Review drawings and other documents describing the existing (base building) air conditioning system and its design basis such as the temperatures, number of people and equipment heat loads allowed for. Make sure these are adequate for the intended use. Make sure every space has both a supply air and a return air path. Allow for door grilles if required to provide a return air path.  \nProtection  \nGeneral: Protect base building fabric to the tenancy and to all public spaces including lifts and loading facilities. Make good all damaged areas.  \nOwnership  \nGeneral: If any base building items are removed by the tenant, they remain the property of the building owner. Arrange storage for future reinstallation.  \n2 EXECUTION   \n2.1 SERVICES INSTALLATION  \nPenetrations and fixing  \nFixing: If equipment is not suitable for fixing to nonstructural building elements, fix directly to structure and trim around holes or penetrations in non-structural elements.  \nGeneral: If it is proposed to penetrate or fix to the following, submit details of the methods proposed to maintain the required structural, fire and other properties:  \n- Structural building elements including external walls, fire walls, fire doors and access panels, other tested and rated assemblies or elements, floor slabs and beams.  \n- Membrane elements including damp-proof courses, waterproofing membranes and roof coverings. If penetrating membranes, provide a waterproof seal between the membrane and the penetrating component.  \nFire rated building elements: Seal penetrations with a system conforming to AS 4072.1.  \nNon-fire rated building elements: Seal penetrations around conduits and sleeves. Seal around cables within sleeves. If the building element is acoustically rated, maintain the rating.  \nPipe sleeves: If piping or conduit penetrates building elements, provide metal or PVC-U sleeves formed from oversize pipe sections.  \n2.2 COMPLETION  \nProject folder  \nProvide a project folder containing the following:  \n- Record drawings of works as built.  \n- Product data with maintenance and cleaning instructions.  \n- Product warranties to the following terms:  \n. Plasterboard: 5 years.  \n. Doors and door frames: 5 years.  \n. Glass and glazing: 10 years.  \n. Suspended ceilings: 10 years.  \n- Air conditioning record drawing of the existing system and the system as installed showing the adjusted air quantities as measured.  \n- Maintenance requirements for fire extinguishers and fire blankets to AS 1851.  \n0453 DOORS AND ACCESS PANELS  \n1 PRODUCTS   \n1.1 FRAMES  \nAluminium frames  \nGeneral: Assemble from aluminium sections, including accessories such as buffers, pile strips, strike plates and fixing ties or brackets with provision for fixing documented hardware.  \nSteel frames  \nGeneral: Continuously weld from metallic-coated steel sheet sections, including accessories such as buffers, strike plates, spreaders, switch boxes, fixing ties or brackets, and provision for fixing documented ha","cbCaia0Uxs9LKUng","https://ap.wps.com/l/cbCaia0Uxs9LKUng","pdf",153941,"English","# Common Requirements\n## Additional Work\n## Authorities\n## Base Building\n# Execution\n## Services Installation\n## Completion\n# Doors and Access Panels\n## Products\n## Frames\n## Doors","[{\"question\":\"What approvals and compliance requirements must the fitout contractor follow?\",\"answer\":\"The work must comply with the National Construction Code, building approvals, and local/state government authority requirements. A building fitout guide must be followed if required by the lease.\"},{\"question\":\"How should electrical and hydraulic work personnel be handled?\",\"answer\":\"Electrical and plumbing works must use only state or territory licensed personnel.\"},{\"question\":\"What must be provided in the project folder at completion?\",\"answer\":\"A project folder must include record drawings (as built), product data with maintenance/cleaning instructions, product warranties with specified durations, an air-conditioning record drawing showing adjusted measured quantities, and maintenance requirements for fire extinguishers and fire blankets to AS 1851.\"}]","Simple Office Fitout - Common Requirements - Execution | PDF"]