[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-403523-105":59,"doc-detail-403523-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","sigen-ev-ac-charger-installation-guide-version-03-release-date-2024-06-20","Sigen EV AC Charger Installation Guide - Version 03 - Release date 2024-06-20","","Sigen EV AC Charger Installation Guide provides installation and safety guidance for Sigen EVAC 7/11/22 4G T2 WH and Sigen EVAC 7/11/22 4G T2SH WH chargers. It specifies requirements for trained electrical personnel, operator familiarity with regulations, and mandatory pre-operation notices. The guide covers cable routing options, component checks from the packing list, personal protective equipment, recommended MCB (IEC/EN 60898) specifications by model, supported grid power modes (TT/TN-S/TN-C-S/IT), and recommended outdoor cable types and parameters for AC input and communication connections. It also outlines site selection requirements and environmental restrictions.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":30,"@type":76,"position":81},"https://docshare.wps.com/document/technology/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/sigen-ev-ac-charger-installation-guide-version-03-release-date-2024-06-20/403523/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/sigen-ev-ac-charger-installation-guide-version-03-release-date-2024-06-20/403523.png","ImageObject",300,407,{"name":92,"@type":93},"nayy☆","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-21","2026-09-27",true,{"@type":102,"interactionType":103,"userInteractionCount":19},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What personnel requirements apply before operating the Sigen EV AC chargers?","Question",{"text":112,"@type":113},"Operation must be handled by trained or experienced electrical personnel. Operators should be familiar with relevant national/regional laws, regulations, and the system structure and working principles.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"How should cables be routed to avoid water ingress?",{"text":117,"@type":113},"The guide advises routing cables through the bottom routing holes (holes 3 and 5). If top routing holes (holes 1 and 2) are used, install the equipment in a sheltered location to prevent water ingress after prolonged top water accumulation.",{"name":119,"@type":110,"acceptedAnswer":120},"Which MCB specifications are recommended for Sigen EVAC models?",{"text":121,"@type":113},"Users should prepare a type B MCB compliant with IEC/EN 60898 with recommended specifications shown below: Sigen EVAC 7: 1P+N, 40 A; Sigen EVAC 11: 3P+N, 20 A; Sigen EVAC 22: 3P+N, 40 A. The requirement can be omitted if compliant AC switches are already installed.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},403523,1791363846,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":29,"category_name":30,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":19,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":144,"read_time":145},962090893153,"https://ap-avatar.wpscdn.com/davatar_9964176cb1d06d4a9deccf72a44ae3dc","Sigen EV AC Charger Installation Guide  \nSigen EVAC (7, 11, 22) 4G T2 WH  \nSigen EVAC (7, 11, 22) 4G T2SH WH  \nVersion: 03  \nRelease date: 2024-06-20  \n• Trained or experienced electrical personnel are required to operate the equipment.  \n• Operators should be familiar with national/regional laws, regulations and standards, the structure and working principle of relevant systems.  \n• Please read carefully the operating requirements and precautions in this document and Important Notice before operating. Failure to do so may result in damage to the equipment that is not covered by the warranty.  \n1 Introduction  \nSigen EVAC 7/11/22 4G T2 WH  \n• You are advised to connect cables through bottom routing holes (holes 3 and 5) .  \n• If cables are connected through top routing holes (holes 1 and 2), please install the equipment in a sheltered location to prevent water ingress after prolonged water accumulation on the top.  \n\n| No. | Description | No. | Description |\n| --- | --- | --- | --- |\n| 1 | Top routing hole for communication cable | 2 | Top routing hole for AC input cable |\n| 3 | Bottom routing hole for AC input cable | 4 | Bottom routing hole for charging cable |\n| 5 | Bottom routing hole for communication cable | 6 | Type 2 charging connector holder |\n| 7 | Indicator | 8 | Sigen RFID card reading area |\n| 9 | Charging connector | - | - |\n\nSigen EVAC 7/11/22 4G T2SH WH  \n• You are advised to connect cables through bottom routing holes (holes 3 and 5) .  \n• If cables are connected through top routing holes (holes 1 and 2), please install the equipment in a sheltered location to prevent water ingress after prolonged water accumulation on the top.  \n\n| No. | Description | No. | Description |\n| --- | --- | --- | --- |\n| 1 | Top routing hole for communication cable | 2 | Top routing hole for AC input cable |\n| 3 | Bottom routing hole for AC input cable | 4 | (Reserved) Bottom routing hole |\n| 5 | Bottom routing hole for communication cable | 6 | Type 2 charger socket with protective door |\n| 7 | Indicator | 8 | Sigen RFID card reading area |\n\n• According to the packing list, check whether the components are complete and in good appearance. If any abnormality occurs, contact your sales agent in time.  \n• Check personal protective equipment and installation tools to ensure that they are complete; If not, please make them up.  \n• Check the customer-provided cable to ensure that the quantity and specifications are correct; if not, prepare again.  \n Protective equipment   \nSafety hat Safety glasses Dust mask Protective gloves Insulating gloves Insulating shoes  \nSelf-supplied pre-AC switch  \nHeat shrinkable  \nsleeve  \nUsers should prepare type B MCB compliant with IEC/EN 60898 with recommended specifications shown below. Users can omit this requirement if they have installed compliant AC switches.  \n\n| Model | Number of Poles, MCB | Rated Current, MCB |\n| --- | --- | --- |\n| Sigen EVAC 7 4G T2 WH, Sigen EVAC 7 4G T2SH WH | 1P+N | 40 A |\n| Sigen EVAC 11 4G T2 WH, Sigen EVAC 11 4G T2SH WH | 3P+N | 20 A |\n| Sigen EVAC 22 4G T2 WH, Sigen EVAC 22 4G T2SH WH | 3P+N | 40 A |\n\nSelf-supplied Cables  \nThe grid power options include TT, TN-S, TN-C-S, and IT. Users can prepare cables according to their local grid power mode.  \n\n| No. | Cable Name |  | Recommended Specification |  |  |\n| --- | --- | --- | --- | --- | --- |\n|  |  |  | Sigen EVAC 7 4G T2 WH\u003Cbr>Sigen EVAC 7 4G T2SH WH | Sigen EVAC 11 4G T2 WH\u003Cbr>Sigen EVAC 11 4G T2SH WH | Sigen EVAC 22 4G T2 WH\u003Cbr>Sigen EVAC 22 4G T2SH WH |\n| 1 | AC input cable | Three-phase five-wire system\u003Cbr>(L1/L2/L3/N/PE) | - | Five-core/four-core copper core cables for outdoor use\u003Cbr>• Cable temperature resistance: ≥ 90°C\u003Cbr>• Outer diameter: 13 mm to 20 mm\u003Cbr>• Current: 16 A\u003Cbr>• Cross-sectional area of conductor: 2.5 mm² to 4 mm² | Five-core/four-core copper core cables for outdoor use\u003Cbr>• Cable temperature resistance: ≥ 90°C\u003Cbr>• Outer diameter: 13 mm to 20 mm\u003Cbr>• Current: 32 A\u003Cbr>• Cross-sectional area of c","cbCaiaI3crbivfSA","https://ap.wps.com/l/cbCaiaI3crbivfSA","pdf",9211384,29,"English","# 1 Introduction\n## Sigen EVAC 7/11/22 4G T2 WH - Cable routing and parts overview\n## Sigen EVAC 7/11/22 4G T2SH WH - Cable routing and parts overview\n# Protective equipment and required components\n## Self-supplied pre-AC switch and heat-shrinkable sleeve\n## Recommended type B MCB (IEC/EN 60898)\n# Self-supplied cables\n## Grid power modes (TT/TN-S/TN-C-S/IT)\n## Recommended cable specifications for AC input and signals\n# 3 Site Selection Requirements\n## Installation environment restrictions and distance considerations","[{\"question\":\"What personnel requirements apply before operating the Sigen EV AC chargers?\",\"answer\":\"Operation must be handled by trained or experienced electrical personnel. Operators should be familiar with relevant national/regional laws, regulations, and the system structure and working principles.\"},{\"question\":\"How should cables be routed to avoid water ingress?\",\"answer\":\"The guide advises routing cables through the bottom routing holes (holes 3 and 5). If top routing holes (holes 1 and 2) are used, install the equipment in a sheltered location to prevent water ingress after prolonged top water accumulation.\"},{\"question\":\"Which MCB specifications are recommended for Sigen EVAC models?\",\"answer\":\"Users should prepare a type B MCB compliant with IEC/EN 60898 with recommended specifications shown below: Sigen EVAC 7: 1P+N, 40 A; Sigen EVAC 11: 3P+N, 20 A; Sigen EVAC 22: 3P+N, 40 A. The requirement can be omitted if compliant AC switches are already installed.\"}]","Sigen EV AC Charger Installation Guide - Version 03 - Release date 2024-06-20 | PDF",1790541195,73]