[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-608510-105":59,"doc-detail-608510-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","shuttle-brewer-airpot-operation-and-instruction-manual-for-models-p300e-p400e-p400eshp-rap300e-rap400e-raps300e-raps400e","Shuttle Brewer & Airpot - Operation and Instruction Manual - For Models P300E, P400E, P400ESHP, RAP300E, RAP400E, RAPS300E, RAPS400E","","Operation and instruction manual for Shuttle Brewers & Airpots covering installation, start-up, operation, adjustments, care and cleaning, service, and troubleshooting. Provides warning labels and safety guidance for electric shock hazards, plus detailed setup steps including positioning, leveling, and access to electrical and water connection points. Includes water hook-up requirements (line type, pressure range, temperature options, shut-off and filtering considerations) and electric hook-up procedures such as circuit sizing, nameplate-based ratings, wiring connections, grounding, and neutral rules. Also includes references to parts illustrations and rough-in and wiring diagrams for multiple models.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":30,"@type":76,"position":81},"https://docshare.wps.com/document/technology/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/shuttle-brewer-airpot-operation-and-instruction-manual-for-models-p300e-p400e-p400eshp-rap300e-rap400e-raps300e-raps400e/608510/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/shuttle-brewer-airpot-operation-and-instruction-manual-for-models-p300e-p400e-p400eshp-rap300e-rap400e-raps300e-raps400e/608510.png","ImageObject",300,407,{"name":92,"@type":93},"Kurz","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-24","2026-10-17",true,{"@type":102,"interactionType":103,"userInteractionCount":14},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What safety warning does the manual emphasize during installation?","Question",{"text":112,"@type":113},"It warns about electric shock hazard and states installation should be performed by qualified service personnel only. It also highlights that electric and water hook-up locations are behind the front panel.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What are the water hook-up requirements for the brewer?",{"text":117,"@type":113},"The manual specifies using a 3/8\" copper or flexible water line, with fill valve connection as a 3/8\" flare. Water pressure must be 30 to 70 psi, and hot water (up to 160°F) can provide faster recovery between brews.",{"name":119,"@type":110,"acceptedAnswer":120},"How should the brewer be connected electrically?",{"text":121,"@type":113},"Connect the brewer to its own circuit using a fused disconnect switch or circuit breaker near the brewer, using ratings from the nameplate. Standard wiring is 1 phase 3 wire with connections to L1 and L2, and the body must be grounded; never use the ground conductor as a neutral.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},608510,1792865324,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":29,"category_name":30,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":14,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":144,"read_time":145},2336478945635,"https://ap-avatar.wpscdn.com/davatar_6f874abed73319feea01a86fa6f0fab8","Shuttle Brewer & Airpot/Shuttle Brewers  \nOperation and Instruction Manual  \nFor Models P300E, P400E, P400ESHP, RAP300E, RAP400E, RAPS300E, RAPS400E  \nTable of Contents  \nInstallation and Start-up ....................................... 1-2  \nWarning Labels ...........................................................3  \nOperation .......................................................... 4  \nAdjustments ........................................................ 5-8  \nCare and Cleaning ............................................... 9-10  \nService ............................................................... 10-11  \nTroubleshooting  \nFilling Problems ....................................... 12  \nHeating Problems ................................. 13  \nBrewing Problems ................................ 14  \nParts Illustrations Models P300E & P400E ....................... 15  \nModel P400ESHP .....................................16  \nModel RAP400E ..................................... 17  \nModel RAPS400E ................................... 18  \nVSB-400 ................................................ 19  \nShuttle CS-LL .......................................... 20  \nRough-In Drawings Model P300........................................................... 21  \nModel P400 & P400ESHP ...................... 22  \nModel RAP300 ......................................... 23  \nModel RAP400 ........................................ 24  \nModel RAPS300 ....................................... 25  \nModel RAPS400 ..................................... 26  \nVSB-300 .................................................. 27  \nVSB-400 ................................................ 28  \nWiring Diagrams P300E/P400E with 1 Batch Timer ......... 29  \nP300E/P400E with 2 Batch Timer........ 30  \nRAP300E/RAP400E................................31  \nRAPS300E/RAPS400E........................32  \nP400ESHP ...........................................33  \nDrawing \\#091-548 .................................34  \nDrawing \\#091-182 .....................................35  \nInstallation:  \n\n| 􀀂 | WARNING |\n| --- | --- |\n| ELECTRIC SHOCK HAZARD!\u003Cbr>Installation of this appliance should be performed by qualified service personnel only. Improper installation could result in electrocution. |  |\n\nSee rough-in drawings in this manual for dimensions and locations of electric and water input.  \nSet-Up/Position  \n1) Remove the brewer from the packing material and attach its legs.  \n2) Position the brewer on a strong, stable table or counter. Check the level front to back and side to side. Adjust the legs to the correct level.  \nIMPORTANT:  \nTHE PERSON INSTALLING THIS APPLIANCE IS RESPONSIBLE FOR ENSURING THAT ELECTRIC AND WATER CONNECTIONS MEET THE REQUIREMENTS OF THE NATIONAL ELECTRIC CODE, NATIONAL PLUMBING CODE, AND ANY LOCAL ORDINANCES.  \nThe electric and water hook-up locations are behind the front panel. Remove the four screws fastening this panel for access to these connections.  \nWater Hook-up  \n1) The water line may enter through holes on the rear or the bottom of the brewer. Use the right hand opening for water.  \n2) Use 3/8\" copper or flexible water line to prevent strain. Do not use low temperature plastic tubing. The connection to the fill valve is 3/8\" flare.  \n3) Water line pressure must be from 30 to 70 psi.  \n4) Hot (up to 160°F) or cold water may be used. Hot water offers faster recovery between brews.  \n5) Install a shut-off valve near the brewer.  \n6) Installing a filtering system can improve the taste of brewed coffee and extend the life of the brewer. If your water has high calcium (lime), chlorine, or iron content, this is especially important. The filter should be the lime inhibiting type if cold water is used. Contact your local water treatment professional regarding the type of filter you should use based on water quality and volume of water used.  \nPrior authorization must be obtained from Grindmaster Corporation for all warranty claims.  \n© Grindmaster Corpora","cbCaipyxDNUN8yBx","https://ap.wps.com/l/cbCaipyxDNUN8yBx","pdf",2270947,36,"English","# Installation and Start-up\n# Warning Labels\n# Operation\n# Adjustments\n# Care and Cleaning\n# Service\n# Troubleshooting\n## Filling Problems\n## Heating Problems\n## Brewing Problems\n# Parts Illustrations Models P300E & P400E\n# Model P400ESHP\n# Model RAP400E\n# Model RAPS400E\n# VSB-400\n# Shuttle CS-LL\n# Rough-In Drawings\n## Model P300\n## Model P400 & P400ESHP\n## Model RAP300\n## Model RAP400\n## Model RAPS300\n## Model RAPS400\n## VSB-300\n## VSB-400\n# Wiring Diagrams\n## P300E/P400E with 1 Batch Timer\n## P300E/P400E with 2 Batch Timer\n## RAP300E/RAP400E\n## RAPS300E/RAPS400E\n## P400ESHP","[{\"question\":\"What safety warning does the manual emphasize during installation?\",\"answer\":\"It warns about electric shock hazard and states installation should be performed by qualified service personnel only. It also highlights that electric and water hook-up locations are behind the front panel.\"},{\"question\":\"What are the water hook-up requirements for the brewer?\",\"answer\":\"The manual specifies using a 3/8\\\" copper or flexible water line, with fill valve connection as a 3/8\\\" flare. Water pressure must be 30 to 70 psi, and hot water (up to 160°F) can provide faster recovery between brews.\"},{\"question\":\"How should the brewer be connected electrically?\",\"answer\":\"Connect the brewer to its own circuit using a fused disconnect switch or circuit breaker near the brewer, using ratings from the nameplate. Standard wiring is 1 phase 3 wire with connections to L1 and L2, and the body must be grounded; never use the ground conductor as a neutral.\"}]","Shuttle Brewer & Airpot - Operation and Instruction Manual - For Models P300E, P400E, P400ESHP, RAP300E, RAP400E, RAPS300E, RAPS400E | PDF",1792266117,91]