[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-648799-105":59,"doc-detail-648799-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","shop-drawing-requirements-pp-2012-14","Shop Drawing Requirements - PP# 2012-14","","Policy memorandum outlining mandatory shop drawing submission and review procedures for Code Administration in Virginia. Specifies required drawing types, including pre-engineered wood floor/roof truss systems and structural steel trusses, joists, beams, columns, anchor bolts, and plates. Assigns responsibilities to registered design professionals for compatibility and certification, details applicant submission deliverables, and defines staff steps for verification, stamping, logging received and plan review activities, and final processing consistent with SOP2012-11.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/shop-drawing-requirements-pp-2012-14/648799/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/shop-drawing-requirements-pp-2012-14/648799.png","ImageObject",300,407,{"name":92,"@type":93},"Logic","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-23",true,{"@type":102,"interactionType":103,"userInteractionCount":81},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What shop drawing types does the policy require applicants to submit?","Question",{"text":112,"@type":113},"Applicants must submit shop drawings covering pre-engineered wood floor and roof truss systems, along with structural steel roof trusses, joists, beams, columns, anchor bolts, and plates.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What responsibilities are assigned to the Virginia registered design professional building designer?",{"text":117,"@type":113},"The building designer must perform detailed review to ensure compatibility with structural design and loads and certify the shop drawings are acceptable based on the framing layout.",{"name":119,"@type":110,"acceptedAnswer":120},"What steps must staff perform after receiving and reviewing shop drawings?",{"text":121,"@type":113},"Staff must verify submissions meet applicant requirements, apply the ‘Shop Drawing Submission’ stamp on the cover page, record ‘Shop Drawing Received’ and ‘Shop Drawing Plan Review’ activity lines within the permit case, and assign review to the building plans examiner before processing approved submittals per SOP2012-11.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},648799,1792795350,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":81,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":14,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":24},1099513958762,"https://ap-avatar.wpscdn.com/avatar/1000023916a998db790?x-image-process=image/resize,m_fixed,w_180,h_180&k=1784791008015729253","| Gregg Fields, CBO, CBMO Director | DEPARTMENT OF\u003Cbr>CODE ADMINISTRATION\u003Cbr>301 King Street\u003Cbr>Room 4200\u003Cbr>Alexandria, Virginia 22314 | Phone (703) 746-4200 Fax (703) 549-4589 [alexandriava.gov](alexandriava.gov) |\n| --- | --- | --- |\n\nDATE: December 1, 2012 (December 2017)  \nTO: Code Administration Staff  \nFROM: Gregg Fields, Director  \nSUBJECT: Shop Drawing Requirements  \nPP \\#: 2012-14  \nThis policy provides guidance to assist those submitting required shop drawings as listed below:  \n• Pre-engineered wood floor and roof truss systems, girders and beams; and  \n• Structural steel roof trusses, joists, beams, columns, anchor bolts and plates.  \nIt is the responsibility of the Commonwealth of Virginia registered design professional (RDP) building designer to perform a detailed review of the prepared shop drawings to ensure compatibility with the building’structural design and loads and certify the shop drawings are acceptable based on the building designer’s structural framing layout.  \nIt is the responsibility of the Commonwealth of Virginia (RDP) fabrication designer to generate detailed shop drawings specifying those structural elements that will transfer the specified loads or perform specified functions based on the building designer’s structural framing layout.  \nApplicant Submission Requirements  \n• Two copies of the shop drawings, each sheet signed and sealed by a Commonwealth of Virginia RDP, shall be submitted to Code Administration for review and approval prior to the installation of the components with the following:  \n• Shop drawing sheets shall bear the building designer’s certification stamp or an index page references all submittal sheets;  \n• All applicable loads and;  \n• Project address and permit number  \nStaff Processing Requirements  \n• Verify shop drawings meet the above “Applicant Submission Requirements”  \n• Staff shall apply the ‘Shop Drawing Submission’ stamp on the cover page of each plan set  \n• Staff shall add – within the permit case – a ‘Shop Drawing Received’ activity line  \n• Staff shall also add-within the permit case – a ‘Shop Drawing Plan Review’ activity line and assign it to the previously assigned building plans examiner.  \n• Once the shop drawing plan review is approved, staff shall process and prepare submitted shop drawings as outlined in SOP2012-11 “When a Plan Review is Complete” Note: approved shop drawings are required on the project job site during City inspection and installation.","cbCaip4e0Kg58Fsz","https://ap.wps.com/l/cbCaip4e0Kg58Fsz","pdf",53054,"English","# Applicant Submission Requirements\n# Staff Processing Requirements","[{\"question\":\"What shop drawing types does the policy require applicants to submit?\",\"answer\":\"Applicants must submit shop drawings covering pre-engineered wood floor and roof truss systems, along with structural steel roof trusses, joists, beams, columns, anchor bolts, and plates.\"},{\"question\":\"What responsibilities are assigned to the Virginia registered design professional building designer?\",\"answer\":\"The building designer must perform detailed review to ensure compatibility with structural design and loads and certify the shop drawings are acceptable based on the framing layout.\"},{\"question\":\"What steps must staff perform after receiving and reviewing shop drawings?\",\"answer\":\"Staff must verify submissions meet applicant requirements, apply the ‘Shop Drawing Submission’ stamp on the cover page, record ‘Shop Drawing Received’ and ‘Shop Drawing Plan Review’ activity lines within the permit case, and assign review to the building plans examiner before processing approved submittals per SOP2012-11.\"}]","Shop Drawing Requirements - PP# 2012-14 | PDF"]