[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-640008-105":59,"doc-detail-640008-en":129},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":122,"head_meta":124,"extra_data":126,"updated_unix":128},105,"en","services-to-be-provided-by-the-engineer-exhibit-b-general-requirements","SERVICES TO BE PROVIDED BY THE ENGINEER - Exhibit B - General Requirements","","Exhibit B outlines the engineering services required for preparing one set of PS&E (plans, specifications, and estimates) and related documents for a Texas highway project. It specifies design criteria and manuals to follow, processes for design exceptions and waivers, and requirements for right-of-entry and coordination with property owners, the State, and adjacent engineers. It also covers progress reporting and invoicing, including monthly reports, invoice formats, and contract schedules using Primavera software with defined milestones and deliverables.",{"@graph":69,"@context":121},[70,84,104],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/services-to-be-provided-by-the-engineer-exhibit-b-general-requirements/640008/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":98,"encodingFormat":97,"isAccessibleForFree":99,"interactionStatistic":100},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/services-to-be-provided-by-the-engineer-exhibit-b-general-requirements/640008.png","ImageObject",300,407,{"name":92,"@type":93},"CatatanPagi","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-22",true,{"@type":101,"interactionType":102,"userInteractionCount":4},"InteractionCounter",{"@type":103},"ViewAction",{"@type":105,"mainEntity":106},"FAQPage",[107,113,117],{"name":108,"@type":109,"acceptedAnswer":110},"What PS&E deliverables does the exhibit require the engineer to prepare?","Question",{"text":111,"@type":112},"The engineer must provide engineering services to prepare one set of plans, specifications, and estimates (PS&E) and related documents for the CSJ listed. The PS&E package must be suitable for the State’s construction contract bidding and awarding process.","Answer",{"name":114,"@type":109,"acceptedAnswer":115},"Which design references and manuals must the engineer follow?",{"text":116,"@type":112},"The engineer must work in accordance with the latest applicable State procedures, specifications, manuals, guidelines, standard drawings, and standard specifications, including items such as the PS&E Preparation Manual and the Texas Manual on Uniform Traffic Control Devices (TMUTCD). If State manuals do not identify criteria, the engineer must notify the State and refer to AASHTO’s Policy on Geometric Design of Highways and Streets (latest edition).",{"name":118,"@type":109,"acceptedAnswer":119},"How are design exceptions, waivers, and invoice reporting handled?",{"text":120,"@type":112},"The engineer must identify and complete necessary forms for each design exception and waiver required within project limits prior to the 30% project completion submittal, submitting them to the State for coordination and approval. For invoicing, invoices follow Function Code breakdowns referenced in Attachment “C” and include a Projected vs. Actual Contract Invoices form, along with monthly written progress reports describing completed and planned activities, issues, remedies, meetings, and percent complete by task.","https://schema.org",{"og:url":83,"og:type":123,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":125,"canonical":83},"index,follow",{"doc_id":127,"site_id":62},640008,1792706863,{"code":4,"msg":5,"data":130},{"doc_id":127,"user_id":131,"nickname":92,"user_avatar":132,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":133,"file_id":134,"file_url":135,"file_type":136,"file_size":137,"view_count":4,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":138,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":128,"read_time":143},962090894170,"https://ap-avatar.wpscdn.com/davatar_6f874abed73319feea01a86fa6f0fab8","Prime Provider: LOCKWOOD, ANDREWS & NEWNAM, INC.  \nContract No. 36-8IDP5093  \nPS No. 8293  \nWork Authorization No. 4 PO No. XXXX  \nEXHIBIT B  \nSERVICES TO BE PROVIDED BY THE ENGINEER  \nCounty: Brazos  \nHighway: BS 6-R  \nCSJ: 0049-09-092, etc.  \nPS&E & Survey:  \nFrom SH 21 to FM 60.  \nThe work to be performed by the Engineer shall consist of providing engineering services required for the preparation of one set of plans, specifications, and estimates (PS&E) and related documents for the CSJ listed above.  \nThis set of (PS&E) will incorporate placement of sidewalk (west) and share use paths (SUP) (east) . These improvements including two (2) pedestrian bridges, and replacement of eight (8) traffic signals. These services include, but are not limited to Drainage coordination, bridge design, traffic control design, driveway, illumination, signing and pavement markings design, traffic signal design, erosion control, SW3P design and, geotechnical data collection.  \nGENERAL REQUIREMENTS  \n1.1. Design Criteria. The Engineer shall prepare work in accordance with the latest version of applicable State’s procedures, specifications, manuals, guidelines, standard drawings, standard specifications or previously approved special provisions and special specifications to include, but not limited to: the PS&E Preparation Manual, Roadway Design Manual, Hydraulic Design Manual, the Texas Manual on Uniform Traffic Control Devises (TMUTCD), Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges, 2014, and other State approved manuals. When design criteria are not identified in State manuals, the Engineer shall notify the State and refer to the American Association of State Highway and Transportation Officials (AASHTO), A Policy on Geometric Design of Highways and Street, (latest Edition) . In addition, the Engineer shall follow the guidelines shown in Developing PS&E for a particular District which the Engineer may download from the State’s website. The Engineer shall prepare each (PS&E) package in a form suitable for letting through the State’s construction contract bidding and awarding process.  \nThe Engineer shall identify, prepare exhibits, and complete necessary forms for each Design Exception and Waiver required within project limits prior to the 30% project completion submittal. The Engineer shall submit each exception and waiver to the State  \nPage 1 of 33 Exhibit B  \nPrime Provider: LOCKWOOD, ANDREWS & NEWNAM, INC.  \nContract No. 36-8IDP5093  \nPS No. 8293  \nWork Authorization No. 4 PO No. XXXX  \nfor coordination and processing of approvals. If subsequent changes require additional exceptions, the Engineer shall notify the State in writing as soon as possible after identification of each condition that may warrant a design exception or waiver.  \n1.2. Right-of-Entry and Coordination. The Engineer shall notify the State and secure permission to enter private property to perform any surveying, environmental, engineering or geotechnical activities needed off State right-of-way. In pursuance of the State’s policy with the general public, the Engineer shall not commit acts which would result in damages to private property, and the Engineer shall make every effort to comply with the wishes and address the concerns of affected private property owners. The Engineer shall contact each property owner prior to any entry onto the owner’s property and shall request concurrence from the State prior to each entry.  \nThe Engineer shall notify the State and coordinate with adjacent engineers on all controls at project interfaces. The Engineer shall document the coordination effort, and each engineer shall provide written concurrence regarding the agreed project controls and interfaces. In the event the Engineer and the other adjacent engineers are unable to agree, the Engineer and each adjacent engineer shall meet jointly with the State for resolution. The State shall have authority over the Engineer’s disagreements and the","cbCaibYWC54pmx0z","https://ap.wps.com/l/cbCaibYWC54pmx0z","pdf",479021,33,"English","# SERVICES TO BE PROVIDED BY THE ENGINEER\n## General Requirements\n## 1.1 Design Criteria\n## 1.2 Right-of-Entry and Coordination\n## 1.3 Progress Reporting and Invoicing","[{\"question\":\"What PS\\u0026E deliverables does the exhibit require the engineer to prepare?\",\"answer\":\"The engineer must provide engineering services to prepare one set of plans, specifications, and estimates (PS\\u0026E) and related documents for the CSJ listed. The PS\\u0026E package must be suitable for the State’s construction contract bidding and awarding process.\"},{\"question\":\"Which design references and manuals must the engineer follow?\",\"answer\":\"The engineer must work in accordance with the latest applicable State procedures, specifications, manuals, guidelines, standard drawings, and standard specifications, including items such as the PS\\u0026E Preparation Manual and the Texas Manual on Uniform Traffic Control Devices (TMUTCD). If State manuals do not identify criteria, the engineer must notify the State and refer to AASHTO’s Policy on Geometric Design of Highways and Streets (latest edition).\"},{\"question\":\"How are design exceptions, waivers, and invoice reporting handled?\",\"answer\":\"The engineer must identify and complete necessary forms for each design exception and waiver required within project limits prior to the 30% project completion submittal, submitting them to the State for coordination and approval. For invoicing, invoices follow Function Code breakdowns referenced in Attachment “C” and include a Projected vs. Actual Contract Invoices form, along with monthly written progress reports describing completed and planned activities, issues, remedies, meetings, and percent complete by task.\"}]","SERVICES TO BE PROVIDED BY THE ENGINEER - Exhibit B - General Requirements | PDF",83]