[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-detail-110023-en":3,"doc-seo-110023-105":31,"detail-sidebar-cat-0-en-105":93},{"code":4,"msg":5,"data":6},0,"success",{"doc_id":7,"user_id":8,"nickname":9,"user_avatar":10,"doc_module":4,"category_id":11,"category_name":12,"doc_title":13,"doc_description":14,"doc_content":15,"file_id":16,"file_url":17,"file_type":18,"file_size":19,"view_count":20,"is_deleted":4,"is_public":21,"is_downloadable":21,"audit_status":21,"page_count":22,"language":23,"language_code":24,"site_id":25,"html_lang":24,"table_of_contents":26,"faqs":27,"seo_title":28,"seo_description":14,"update_tm":29,"read_time":30},110023,13056703020460,"Valentina","https://ap-avatar.wpscdn.com/avatar/be000253dac470eee5d?_k=1778207105932848923",8,"Research & Report","SENEGAL MUNICIPAL SOLID WASTE MANAGEMENT PROJECT - Executive Summary of the Environmental and Social Impact Assessment (ESIA) for the Rehabilitation of the Mbeubeuss Dumpsite","Executive Summary of the Environmental and Social Impact Assessment for rehabilitating the Mbeubeuss dumpsite under Senegal’s Municipal Solid Waste Management Project (PROMOGED). The project aims to strengthen sector governance and improve waste-management services across targeted agglomerations, while supporting contextual and sustainable disposal systems and private-sector participation. It details the rehabilitation approach through a transfer and sorting station and a composting platform, outlines technical works and staged operations, and presents the study methodology linking project elements to impacts on environmental components.","Public Disc losure Authorized  \nSENEGAL MUNICIPAL SOLID WASTE MANAGEMENT PROJECT  \n(P161477)  \nEXECUTIVE SUMMARY OF THE ENVIRONMENTAL AND SOCIAL ASSESSMENT (ESIA) FOR THE REHABILITATION OF THE MBEUBEUSS DUMPSITE  \nPub lic Disc losure Authorized  \n1. INTRODUCTION  \nSenegal is currently preparing a Senegal Solid Waste Management Project (PROMOGED) . The project will be funded by French Development Agency (AFD), the Spanish Agency for Cooperation and Development (AECID) and the World Bank IDA. The project will be implemented by the “Unite de Coordination et de Gestion (UCG) at the Ministry of Urbanism , Housing and Living Environment. The project will benefit the following agglomerations: Dakar; Thiès; North (including the regions of Saint-Louis and Matam); and the Casamance (comprising of the regions of Ziguinchor, Sedhiou, and Kolda) .  \nProject Development objectives :  \nThe project development objective is to strengthen the governance of solid waste management in Senegal and improve solid waste management services in selected municipalities.  \nSpecifically, the project will:  \n• propose a series of reforms and targeted policy actions designed to improve institutional, regulatory and financial governance in the sector;  \n• improve domestic solid waste management all along the chain, while promoting integrated waste management in target communities, by reinforcing inter-communal planning and execution;  \n• To create contextualized and sustainable management systems, with maximum feasible implication of the private sector.  \n• improve the socio-economic performance of the sector by making profitable use of waste;  \nThe project is structured around the following components:  \n• Component 1: Strengthening Sector Governance and Institutional Capacity: This component aims to strengthen the institutional framework governing the sector, ensure the effectiveness of investments, and create a favorable environment for private sector investments in the solid waste sector.  \n• Component 2. Improving Solid Waste Infrastructure and Service in Selected Agglomerations: To improve solid waste services for citizens in targeted municipalities especially women, this component will finance waste management facilities and equipment needed to establish or improve (where it already exists) the delivery of waste management services in Greater Dakar and three secondary agglomerations, namely, Thiès (Thiès, Mbour and Tivaouane), North (Saint Louis and Matam), Casamance (Ziguinchor, Kolda and Sedhiou) .  \n• Component 3: Project management, coordination, communication, monitoring and evaluation. As part of this project, the Mbeubeus dumpsite in Dakar will be rehabilitated.  \n2. CONTEXT AND OBJECTIVES OF MBEUBEUSS’S DUMPSITE REHABILITATION  \nRehabilitation of the dumpsite is a means of reducing the current impacts noted within and around the dumpsite. This environmental and social impact study of the Mbeubeuss dumpsite rehabilitation project isan essential step in the rehabilitation of the site under sustainable ecological and social conditions.  \nThe installation of a transfer and sorting station (CTT ) and a composting platform is part of the rehabilitation of the dumpsite, which aims to stop the process of environmental degradation and the reintegration of the dumpsite in the natural environment.  \nThe Mbeubeuss dumpsite is still in operation and will remain so until the new treatment infrastructures are built and operational. The approach of the project provides for a gradual rehabilitation of the Mbeubeuss dumpsite linked to the setting up of sorting and composting infrastructures. The purpose of the Mbeubeuss dumpsite disposal operation is to:  \n-restore the site;  \n-store in environmental and sanitary safety non-recoverable waste during the rehabilitation phase;  \n-sort and valorize in matter and in compost of the reusable materials  \nThe waste that will transit through the Sorting and Transfer Center (CTT) at Mbeubeuss will come mainly from the depa","cbCaifhA2oM9sL1F","https://ap.wps.com/l/cbCaifhA2oM9sL1F","pdf",467901,5,1,26,"English","en",105,"# Introduction\n## Project development objectives\n## Project components\n# Context and objectives of Mbeubeuss dumpsite rehabilitation\n## Transfer and sorting station and composting platform\n# Technical options of the resorption\n## Sorting and transfer center (CTT)\n## Composting platform and site redevelopment\n# Methodology of the study\n## Documentary review, stakeholder meetings, field visits\n## Impact prediction criteria","[{\"question\":\"What is the purpose of the ESIA executive summary for the Mbeubeuss dumpsite rehabilitation?\",\"answer\":\"It explains the rationale and approach for rehabilitating the Mbeubeuss dumpsite to reduce current environmental and social impacts under sustainable conditions, including staged measures linked to new sorting and composting infrastructures.\"},{\"question\":\"Which project components support improved solid waste management in Senegal?\",\"answer\":\"The project includes strengthening sector governance and capacity, improving waste infrastructure and services in selected agglomerations, and project management activities, including rehabilitation of the Mbeubeuss dumpsite in Dakar.\"},{\"question\":\"How does the project technically rehabilitate the Mbeubeuss dumpsite?\",\"answer\":\"It sets up a Sorting and Transfer Center (CTT) to sort incoming waste and channel sorted outputs to recovery, while disposal of sorting residues occurs at the dumpsite during rehabilitation; it also builds a composting platform for selective-collection waste and redevelops slopes, domes, and surrounding areas with final cover, drainage, and landscaping.\"}]","SENEGAL MUNICIPAL SOLID WASTE MANAGEMENT PROJECT - Executive Summary of the Environmental and Social Impact Assessment (ESIA) for the Rehabilitation of the Mbeubeuss Dumpsite | PDF",1784483515,66,{"code":4,"msg":32,"data":33},"ok",{"site_id":25,"language":24,"slug":34,"title":13,"keywords":35,"description":14,"schema_data":36,"social_meta":88,"head_meta":90,"extra_data":92,"updated_unix":29},"senegal-municipal-solid-waste-management-project-executive-summary-of-the-environmental-and-social-impact-assessment-esia-for-the-rehabilitation-of-the-mbeubeuss-dumpsite","",{"@graph":37,"@context":87},[38,55,70],{"@type":39,"itemListElement":40},"BreadcrumbList",[41,45,49,52],{"item":42,"name":43,"@type":44,"position":21},"https://docshare.wps.com","Home","ListItem",{"item":46,"name":47,"@type":44,"position":48},"https://docshare.wps.com/document/","Document",2,{"item":50,"name":12,"@type":44,"position":51},"https://docshare.wps.com/document/research-report/",3,{"item":53,"name":13,"@type":44,"position":54},"https://docshare.wps.com/document/senegal-municipal-solid-waste-management-project-executive-summary-of-the-environmental-and-social-impact-assessment-esia-for-the-rehabilitation-of-the-mbeubeuss-dumpsite/110023/",4,{"url":53,"name":13,"@type":56,"author":57,"headline":13,"publisher":59,"fileFormat":62,"inLanguage":24,"description":14,"dateModified":63,"datePublished":64,"encodingFormat":62,"isAccessibleForFree":65,"interactionStatistic":66},"DigitalDocument",{"name":9,"@type":58},"Person",{"url":42,"name":60,"@type":61},"DocShare","Organization","application/pdf","2026-07-30","2026-07-19",true,{"@type":67,"interactionType":68,"userInteractionCount":20},"InteractionCounter",{"@type":69},"ViewAction",{"@type":71,"mainEntity":72},"FAQPage",[73,79,83],{"name":74,"@type":75,"acceptedAnswer":76},"What is the purpose of the ESIA executive summary for the Mbeubeuss dumpsite rehabilitation?","Question",{"text":77,"@type":78},"It explains the rationale and approach for rehabilitating the Mbeubeuss dumpsite to reduce current environmental and social impacts under sustainable conditions, including staged measures linked to new sorting and composting infrastructures.","Answer",{"name":80,"@type":75,"acceptedAnswer":81},"Which project components support improved solid waste management in Senegal?",{"text":82,"@type":78},"The project includes strengthening sector governance and capacity, improving waste infrastructure and services in selected agglomerations, and project management activities, including rehabilitation of the Mbeubeuss dumpsite in Dakar.",{"name":84,"@type":75,"acceptedAnswer":85},"How does the project technically rehabilitate the Mbeubeuss dumpsite?",{"text":86,"@type":78},"It sets up a Sorting and Transfer Center (CTT) to sort incoming waste and channel sorted outputs to recovery, while disposal of sorting residues occurs at the dumpsite during rehabilitation; it also builds a composting platform for selective-collection waste and redevelops slopes, domes, and surrounding areas with final cover, drainage, and landscaping.","https://schema.org",{"og:url":53,"og:type":89,"og:title":13,"og:site_name":60,"og:description":14},"article",{"robots":91,"canonical":53},"index,follow",{"doc_id":7,"site_id":25},{"code":4,"msg":5,"data":94},[95,99,103,107,111,116,121,124,129,132,136],{"id":21,"doc_module":4,"doc_module_name":47,"category_name":96,"show_sort_weight":97,"slug":98},"Story & Novel",90,"story-novel",{"id":48,"doc_module":4,"doc_module_name":47,"category_name":100,"show_sort_weight":101,"slug":102},"Literature",80,"literature",{"id":54,"doc_module":4,"doc_module_name":47,"category_name":104,"show_sort_weight":105,"slug":106},"Exam",70,"exam",{"id":20,"doc_module":4,"doc_module_name":47,"category_name":108,"show_sort_weight":109,"slug":110},"Comic",60,"comic",{"id":112,"doc_module":4,"doc_module_name":47,"category_name":113,"show_sort_weight":114,"slug":115},6,"Technology",50,"technology",{"id":117,"doc_module":4,"doc_module_name":47,"category_name":118,"show_sort_weight":119,"slug":120},7,"Healthcare",40,"healthcare",{"id":11,"doc_module":4,"doc_module_name":47,"category_name":12,"show_sort_weight":122,"slug":123},30,"research-report",{"id":125,"doc_module":4,"doc_module_name":47,"category_name":126,"show_sort_weight":127,"slug":128},9,"Religion & Spirituality",20,"religion-spirituality",{"id":127,"doc_module":4,"doc_module_name":47,"category_name":130,"show_sort_weight":127,"slug":131},"World Cup","world-cup",{"id":133,"doc_module":4,"doc_module_name":47,"category_name":134,"show_sort_weight":133,"slug":135},10,"Lifestyle","lifestyle",{"id":137,"doc_module":4,"doc_module_name":47,"category_name":138,"show_sort_weight":20,"slug":139},19,"General","general"]