[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-496815-105":59,"doc-detail-496815-en":131},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":124,"head_meta":126,"extra_data":128,"updated_unix":130},105,"en","section-9-approval-and-ase-examples-alternative-to-specific-approval","Section 9 Approval and ASE Examples - Alternative to Specific Approval","","Section 9 introduces an alternative approach to specific RVSM operational approval by leveraging changes in aircraft design, improved RVSM procedures, and greater ADS-B Out usage for altitude-keeping performance monitoring. The regulation is based on 14 CFR part 91, Appendix G, including an added Section 9 provision for aircraft equipped with qualified ADS-B Out systems. It outlines access and oversight for US operators, contrasts Section 9 with remaining requirements under Section 3 approvals, and describes ASE monitoring, containment, and large ASE detection through NAARMO Watch List processes.",{"@graph":69,"@context":123},[70,84,106],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/section-9-approval-and-ase-examples-alternative-to-specific-approval/496815/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/section-9-approval-and-ase-examples-alternative-to-specific-approval/496815.png","ImageObject",300,407,{"name":92,"@type":93},"Ezra","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-11-22","2026-10-02",true,{"@type":102,"interactionType":103,"userInteractionCount":105},"InteractionCounter",{"@type":104},"ViewAction",11,{"@type":107,"mainEntity":108},"FAQPage",[109,115,119],{"name":110,"@type":111,"acceptedAnswer":112},"What is the purpose of Section 9 as an alternative to specific approval?","Question",{"text":113,"@type":114},"Section 9 provides an alternative to specific RVSM operational approval by using regulatory opportunities from improved aircraft maturity and wider mandatory ADS-B usage to support altitude-keeping performance verification tools.","Answer",{"name":116,"@type":111,"acceptedAnswer":117},"What requirement must an aircraft meet to use the Section 9 provision?",{"text":118,"@type":114},"The aircraft must be equipped with a qualified ADS-B Out system, and the FAA considers the system qualified when it meets the requirements of 14 CFR § 91.227.",{"name":120,"@type":111,"acceptedAnswer":121},"How does NAARMO detect large or unusual ASE events under the Watch List process?",{"text":122,"@type":114},"Processed ASE is added to a database where NAARMO scans for large or unusual events, then operators or responsible RMAs are notified when aircraft exceed thresholds, identified using mean plus standard deviation greater than 200 ft over a 6-month period.","https://schema.org",{"og:url":83,"og:type":125,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":127,"canonical":83},"index,follow",{"doc_id":129,"site_id":62},496815,1791260858,{"code":4,"msg":5,"data":132},{"doc_id":129,"user_id":133,"nickname":92,"user_avatar":134,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":135,"file_id":136,"file_url":137,"file_type":138,"file_size":139,"view_count":105,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":140,"language":141,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":142,"faqs":143,"seo_title":144,"seo_description":67,"update_tm":145,"read_time":146,"preview_page_count":19,"preview_urls":147},1099514068035,"https://ap-avatar.wpscdn.com/davatar_276721f389ce27ea32af1340a28f341c","Section 9 Approval and ASE  \nExamples  \nSeptember 2023  \nAlternative to Specific Approval  \n• The requirement for specific RVSM operational approval was developed in 1997  \n• At that time, aircraft were not being manufactured to comply with RVSM requirements, and many needed significant modification to meet the standard  \n• Since then there have been improvements in aircraft RVSM design, stability in RVSM operating procedures, and an overall increase in the maturity of RVSM standards  \n• In addition, wider mandatory use of Automatic Dependent Surveillance-Broadcast (ADS-B) provided the opportunity to improve altitude-keeping performance monitoring programs, increasing the availability of RVSM performance verification tools.  \n• In an effort to efficiently use regulatory resources has implemented an alternative to RVSM specific approval identified as Section 9.  \nSection 9 Regulation  \n• Title 14 of the Code of Federal Regulations (14 CFR) part 91, Appendix G contain the RVSM requirements  \n• There were no proposed changes to RVSM altitude-keeping equipment standards for RVSM aircraft,  \n• An alternative provision was added to Appendix G of part 91 under Section 9 – “Aircraft Equipped with Automatic Dependent Surveillance-Broadcast Out”  \n• In order to take advantage of the ofADS-B Out aircraft position data, the aircraft must be equipped with a qualified ADS-B Out system.  \n• The FAA would consider a qualified ADS-B Out system to be one that meets the requirements of  \n14 CFR § 91.227, Automatic Dependent Surveillance-Broadcast (ADS-B) Out equipment performance requirements .  \n• The amendments to Appendix G provide more emphasis on the operator's and pilot’s responsibilities. Operators/pilots continue to be responsible for knowing the requirements, policies and procedures sufficient for the conduct of operations in RVSM airspace, including all areas where they intend to operate  \nAccess and Oversight  \n• Operators of US registered aircraft who intend to operate solely within US ADS-B rule airspace can take advantage of this provision and gain access to RVSM airspace without a specific approval.  \n• Experienced RVSM aircrews can also gain immediate access to the applicable airspace in new RVSM-capable aircraft while their specific approval authorizations are being processed.  \n• Section 9 approvals are not posted to the RMA KSN as these aircraft without a specific approval should not be operating in RVSM airspace outside the US.  \nSection 3 Approvals  \n• Currently, US operators must continue to apply for a specific approval under Operations Specification (OpSpec), Management Specification (MSpec) or Letters of Authorization (LOA) B046 Operations in RVSM Airspace when:  \n• the aircraft is not equipped with qualified ADS-B Out systems;  \n• the operator does not operate in RVSM airspace where the FAA can successfully monitor the aircraft’s height-keeping performance; or  \n• the operator intends to conduct RVSM operations in foreign airspace where the State authority requires a specific RVSM operational approval.  \nASE Monitoring and Containment  \n• Section 9, the FAA regulation provides a single ASE containment requirement for aircraft equipped with ADS-B Out.  \n• The operator is authorized to conduct flight in airspace in with RVSM is applied provided:…(b) theASE of the aircraft does not exceed 200ft.  \n• This requirement corresponds to limits forASE containment when RVSM was first established and is consistent with RVSM performance criteria used for aircraft approval in Section 2 of Appendix G.  \n• It allows performance monitoring to be applied to each aircraft without relying on aggregated data collected from many aircraft of the same RVSM monitoring group.  \n• For these operations, the FAA can rapidly detect when individual aircraft performance has deteriorated outside the proposed ASE tolerance .  \n• The regulation stipulates aircraft continually meet this requirement to be eligible for RVSM operations under the provisions o","cbCaiuoKoKZKIuXF","https://ap.wps.com/l/cbCaiuoKoKZKIuXF","pdf",1733444,29,"English","# Section 9 Approval and ASE Examples\n## Alternative to Specific Approval\n## Section 9 Regulation\n## Access and Oversight\n## Section 3 Approvals\n## ASE Monitoring and Containment\n## Monitoring Support for Section 9\n## Detection of Large ASE Cases\n## ASE Examples","[{\"question\":\"What is the purpose of Section 9 as an alternative to specific approval?\",\"answer\":\"Section 9 provides an alternative to specific RVSM operational approval by using regulatory opportunities from improved aircraft maturity and wider mandatory ADS-B usage to support altitude-keeping performance verification tools.\"},{\"question\":\"What requirement must an aircraft meet to use the Section 9 provision?\",\"answer\":\"The aircraft must be equipped with a qualified ADS-B Out system, and the FAA considers the system qualified when it meets the requirements of 14 CFR § 91.227.\"},{\"question\":\"How does NAARMO detect large or unusual ASE events under the Watch List process?\",\"answer\":\"Processed ASE is added to a database where NAARMO scans for large or unusual events, then operators or responsible RMAs are notified when aircraft exceed thresholds, identified using mean plus standard deviation greater than 200 ft over a 6-month period.\"}]","Section 9 Approval and ASE Examples - Alternative to Specific Approval | PDF",1790940531,73,[148,152,155,159],{"page_no":8,"url":149,"width":150,"height":151},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/1581fc6d06a952c8fa90243bca41999c.webp",983,552,{"page_no":14,"url":153,"width":154,"height":151},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/01b6d059bd2ad05f0c86a42023851f58.webp",982,{"page_no":81,"url":156,"width":157,"height":158},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/8f63533f2c5d5286a92a9858088b62a5.webp",981,551,{"page_no":19,"url":160,"width":161,"height":158},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/30c6ed3b638b96de377c63595f654c62.webp",980]