[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-650880-105":59,"doc-detail-650880-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","section-01-33-00-submittal-procedures","SECTION 01 33 00 - SUBMITTAL PROCEDURES","","Submittal Procedures specify how contractors submit shop drawings, product data, samples, and other required submittals for architectural review and approval. The section defines action submittals versus informational submittals, outlines responsibilities and schedule requirements, and describes formats and content for the submittal schedule. It also addresses administrative requirements for electronic digital data files, including use of architect-provided contract drawing files, licensing expectations, and limitations on accuracy or completeness.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/section-01-33-00-submittal-procedures/650880/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/section-01-33-00-submittal-procedures/650880.png","ImageObject",300,407,{"name":92,"@type":93},"moss~","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-29","2026-10-24",true,{"@type":102,"interactionType":103,"userInteractionCount":19},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What is the purpose of the Submittal Procedures section?","Question",{"text":112,"@type":113},"It sets requirements for the submittal schedule and administrative/procedural steps for submitting shop drawings, product data, samples, and other submittals for review and approval.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"How are action submittals different from informational submittals?",{"text":117,"@type":113},"Action submittals require the architect’s responsive action, while informational submittals do not. Informational submittals may be rejected if they do not comply with requirements.",{"name":119,"@type":110,"acceptedAnswer":120},"What must be included in the submittal schedule?",{"text":121,"@type":113},"The schedule must be arranged in chronological order by required dates, include time needed for review, ordering, manufacturing, fabrication, delivery, and corrections, and be coordinated with related schedules and the schedule of values.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},650880,1793111668,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":19,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":144,"read_time":145},962090895452,"https://ap-avatar.wpscdn.com/davatar_a8503ba1806abce46bf441b54a3ca4cd","SECTION 01 33 00-SUBMITTAL PROCEDURES  \nPART 1-GENERAL  \n1.1 RELATED DOCUMENTS  \nA. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.  \nB. The Contractor's attention is specifically directed, but not limited, to the following documents for additional requirements:  \n1. Uniform General Conditions for Construction Contracts, State of Texas, 2010 (UGC) .  \n2. The University of Houston’s Supplemental General Conditions and Special Conditions for Construction.  \n1.2 SUMMARY  \nA. Section includes requirements for the submittal schedule and administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other submittals.  \nB. Related Requirements:  \n1. Section 01 29 00 \"Payment Procedures\" for submitting Applications for Payment and the schedule of values.  \n2. Section 01 78 39 \"Project Record Documents\" for submitting record Drawings, record Specifications, and record Product Data.  \n3. Section 01 79 00 \"Demonstration and Training\" for submitting video recordings of demonstration of equipment and training of Owner's personnel.  \n1.3 DEFINITIONS  \nA. Action Submittals: Written and graphic information and physical samples that require Architect's responsive action. Action submittals are those submittals indicated in individual Specification Sections as \"action submittals. \"  \nB. Informational Submittals: Written and graphic information and physical samples that do not require Architect's responsive action. Submittals may be rejected for not complying with requirements. Informational submittals are those submittals indicated in individual Specification Sections as \"informational submittals. \"  \nC. File Transfer Protocol (FTP): Communications protocol that enables transfer of files to and from another computer over a network and that serves as the basis for standard Internet protocols. An FTP site is a portion of a network located outside of network firewalls within which internal and external users are able to access files.  \nD. Portable Document Format (PDF): An open standard file format licensed by Adobe Systems used for representing documents in a device-independent and display resolution-independent fixed-layout document format.  \n1.4 ACTION SUBMITTALS  \nRevise \"Submittal Schedule\" Paragraph below to suit Project. If there is an office submittal review sequence policy, insert specific requirements. See Evaluations for discussion on submittal review sequence policies.  \nA. Submittal Schedule: Submit a schedule of submittals, arranged in chronological order by dates required by construction schedule. Include time required for review, ordering, manufacturing, fabrication, and delivery when establishing dates. Include additional time required for making corrections or revisions to submittals noted by Architect and additional time for handling and reviewing submittals required by those corrections.  \n1. Coordinate submittal schedule with list of subcontracts, the schedule of values, and Contractor's construction schedule.  \nIf a startup construction schedule is not required, delete \"Initial Submittal\" Subparagraph below or revise to require initial submittal within 14 days of date established for commencement of the Work.  \n2. Initial Submittal: Submit concurrently with startup construction schedule. Include submittals required during the first 60 days of construction. List those submittals required to maintain orderly progress of the Work and those required early because of long lead time for manufacture or fabrication.  \n3. Final Submittal: Submit concurrently with the first complete submittal of Contractor's construction schedule.  \na. Submit revised submittal schedule to reflect changes in current status and timing for submittals.  \n4. Format: Arrange the following information in a tabular format:  \nAdd information, such as scheduled dates for purchasing and installation and the activ","cbCaibF0qPzZE9Gz","https://ap.wps.com/l/cbCaibF0qPzZE9Gz","pdf",173799,14,"English","# PART 1-GENERAL\n## 1.1 RELATED DOCUMENTS\n## 1.2 SUMMARY\n## 1.3 DEFINITIONS\n## 1.4 ACTION SUBMITTALS\n## 1.5 SUBMITTAL ADMINISTRATIVE REQUIREMENTS","[{\"question\":\"What is the purpose of the Submittal Procedures section?\",\"answer\":\"It sets requirements for the submittal schedule and administrative/procedural steps for submitting shop drawings, product data, samples, and other submittals for review and approval.\"},{\"question\":\"How are action submittals different from informational submittals?\",\"answer\":\"Action submittals require the architect’s responsive action, while informational submittals do not. Informational submittals may be rejected if they do not comply with requirements.\"},{\"question\":\"What must be included in the submittal schedule?\",\"answer\":\"The schedule must be arranged in chronological order by required dates, include time needed for review, ordering, manufacturing, fabrication, delivery, and corrections, and be coordinated with related schedules and the schedule of values.\"}]","SECTION 01 33 00 - SUBMITTAL PROCEDURES | PDF",1792849650,35]