[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-639970-105":59,"doc-detail-639970-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","secretariat-technical-updates-to-the-coe-manual-secretariat-issue-paper-48-other-cross-cutting","Secretariat Technical Updates to the COE Manual - Secretariat Issue Paper # 48 - Issue Paper Theme Other / Cross-cutting - Technical amendment recommendations","","Secretariat Issue Paper #48 documents technical updates proposed to improve the COE Manual, targeting wording and drafting issues that may create unintended anomalies between COE Working Groups. The paper explains the background of anomaly monitoring and routine language refinements, then lists detailed, chapter- and annex-specific amendments for the 2026 COE Manual, including revised inspection timelines, operational readiness scheduling, generator metering requirements, and corrections to annex and paragraph references. It also clarifies reimbursement application processes and equipment capacity ranges for temporary deployments.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/secretariat-technical-updates-to-the-coe-manual-secretariat-issue-paper-48-other-cross-cutting/639970/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/secretariat-technical-updates-to-the-coe-manual-secretariat-issue-paper-48-other-cross-cutting/639970.png","ImageObject",300,407,{"name":92,"@type":93},"Aldword","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-11-04","2026-10-22",true,{"@type":102,"interactionType":103,"userInteractionCount":24},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What problem does Secretariat Issue Paper #48 address?","Question",{"text":112,"@type":113},"It identifies unintended anomalies and transcription-related drafting errors found between COE Working Group cycles, and proposes amendments to improve future COE Manual iterations.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What change is proposed for Chapter 3 regarding inspection reporting?",{"text":117,"@type":113},"It specifies that inspections occur quarterly, that a quarterly verification report is prepared after each inspection, and that the report is examined with the unit and signed by the contingent representative before next-location inspections and reimbursement processing.",{"name":119,"@type":110,"acceptedAnswer":120},"What clarification is proposed for Secretariat offices involved in revising Special Cases?",{"text":121,"@type":113},"When UN requests specialized equipment without authorized reimbursement rates, the troop/police contributor must submit an annex application for review and approval by the Uniformed Capabilities Support Division, which then advises an acceptable reimbursement rate using the annex elements.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},639970,1792832947,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":24,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":19,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":143,"read_time":52},2336478940917,"https://ap-avatar.wpscdn.com/davatar_6f874abed73319feea01a86fa6f0fab8","SECRETARIAT  \nTECHNICAL UPDATES TO THE COE MANUAL  \nSecretariat Issue Paper \\# 48  \n1. ISSUE PAPER THEME: Other / Cross-cutting  \n2. SUMMARY / BACKGROUND / PREVIOUS HISTORY  \nAfter the formal publishing of the COE manual following the tri-annual COE Working Group, Uniform Capabilities Support Division monitor and record any unintended anomalies that are identified during the intervening period between COE Working Groups. These anomalies often occur due to transcription errors when drafting the new COE Manual. This paper seeks to identify those errors and recommend amendments to improve future iterations of the COE Manual.  \nIt is routine that technical amendments are submitted to the COE Working Group to refine and improve the language of the COE Manual.  \n3. DETAILED PROPOSAL  \nThe following technical amendments have been identified in the 2023 COE manual for inclusion in the 2026 COE Manual (struck out text to be deleted; text in bold to be added):  \n• Chapter 3, page 26, para 13 to be revised as follows:  \nInspections are conducted on a quarterly basis to assess the status of the major equipment and self-sustainment categories. An inspection report, i.e. a quarterly verification report, is prepared by the United Nations inspection team after each inspection of a unit. The report describes the result of the inspection. ~~The report~~ It is examined together with the unit and signed by the contingent representative. If a unit has to fully or partially redeploy within a mission area, the next quarterly inspection in the new location will be carried out on a date to be jointly determined by the mission and the unit authorities. The quarterly verification reports are the basis for processing reimbursement for major equipment and self-sustainment to the Member States.  \n• Chapter 3, page 26, para 15 to be revised as follows:  \nOperational readiness inspections must be conducted at least once every six months on dates tobe determined in advance (feasible for all stakeholders) . Wherever feasible, the mission is requested to consult the contingent or unit when scheduling the operational readiness inspections and take into account ongoing operations or relocations as ordered by the Force Commander or the Police Commissioner. In cases where the inspection is scheduled during a period that the contingent or unit is conducting an operation ordered by the Force Commander or the Police Commissioner, or during the relocation of the unit as ordered by the Force Commander or the Police Commissioner, the contingent or unit may request the Inspection Team to reschedule the inspection with the approval of the Force Commander or the Police Commissioner to a date not to exceed 30 days.  \n• Chapter 3, Annex A, page 31, para 11 to be revised as follows:  \nGenerators introduced in 2017 based on the International Organization for Standardization (ISO) 8528 standard, which are detailed in appendix 3 to the present annex, supplement, rather than replace, the existing categories of generators. Troop/police contributors may opt to continue to deploy generators under the previous arrangements. A troop/police contributor may, at its own convenience and subject to its own priorities, shift to the new contingent owned equipment energy transition plan, which is not binding but is incentive-based. If it chooses to be reimbursed at the new rates for prime power, limited time running power or emergency standby power, the troop/police contributor must adhere to the auditable site energy plan. The energy transition plan is not predicated on new types/capabilities of generators. Rather, it is focused on a methodology for using existing generators in a more efficient and environmentally friendly manner.11 At a minimum, all generators must be fitted with ~~afunctional~~ a functional hour meter, and all generator sets must befitted with a functional kWh meter.  \n• Chapter 3, Annex B page 66, para 38 tobe revised as follows to correcta reference toa wrong Annex and pa","cbCaiiOAPqgAOG3H","https://ap.wps.com/l/cbCaiiOAPqgAOG3H","pdf",192518,"English","# Issue Paper Theme\n## Summary / Background / Previous History\n## Detailed Proposal\n## Chapter 3 Amendments\n## Chapter 5 Amendment\n## Chapter 8 Annex A Amendment\n## Chapter 9 Amendment","[{\"question\":\"What problem does Secretariat Issue Paper #48 address?\",\"answer\":\"It identifies unintended anomalies and transcription-related drafting errors found between COE Working Group cycles, and proposes amendments to improve future COE Manual iterations.\"},{\"question\":\"What change is proposed for Chapter 3 regarding inspection reporting?\",\"answer\":\"It specifies that inspections occur quarterly, that a quarterly verification report is prepared after each inspection, and that the report is examined with the unit and signed by the contingent representative before next-location inspections and reimbursement processing.\"},{\"question\":\"What clarification is proposed for Secretariat offices involved in revising Special Cases?\",\"answer\":\"When UN requests specialized equipment without authorized reimbursement rates, the troop/police contributor must submit an annex application for review and approval by the Uniformed Capabilities Support Division, which then advises an acceptable reimbursement rate using the annex elements.\"}]","Secretariat Technical Updates to the COE Manual - Secretariat Issue Paper # 48 - Issue Paper Theme Other / Cross-cutting - Technical amendment recommendations | PDF",1792706651]