[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-651018-105":59,"doc-detail-651018-en":124},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":117,"head_meta":119,"extra_data":121,"updated_unix":123},105,"en","schwartzle-mixed-use-building-permit-part-20-90","Schwartzle Mixed-Use Building Permit - Part 20-90","","Staff report to TEA City Council recommending approval of a Schwartzle mixed-use building permit. The board reviewed a site plan to construct a 13,000 sf commercial building on the corner of Main Avenue and Gateway Blvd, with commercial space on the lower level and eight apartments above. Parking and utilities are outlined, including a 6-inch sprinkler main and access routes. Attachments reference a site plan, permit, and redline building plans on file at City Hall.",{"@graph":69,"@context":116},[70,84,99],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/schwartzle-mixed-use-building-permit-part-20-90/651018/",{"url":83,"name":65,"@type":85,"author":86,"headline":65,"publisher":89,"fileFormat":92,"inLanguage":63,"description":67,"dateModified":93,"datePublished":93,"encodingFormat":92,"isAccessibleForFree":94,"interactionStatistic":95},"DigitalDocument",{"name":87,"@type":88},"supergirl","Person",{"url":74,"name":90,"@type":91},"DocShare","Organization","application/pdf","2026-10-24",true,{"@type":96,"interactionType":97,"userInteractionCount":4},"InteractionCounter",{"@type":98},"ViewAction",{"@type":100,"mainEntity":101},"FAQPage",[102,108,112],{"name":103,"@type":104,"acceptedAnswer":105},"What does the Schwartzle mixed-use building permit include?","Question",{"text":106,"@type":107},"It covers a site plan to construct a 13,000 sf mixed-use commercial building with commercial space on the lower level and eight apartments above.","Answer",{"name":109,"@type":104,"acceptedAnswer":110},"Where is the proposed project located?",{"text":111,"@type":107},"The location is Lot 1 & 4D, Block 1, Carl Soukup Addition, on the corner of Main Avenue and Gateway Blvd.",{"name":113,"@type":104,"acceptedAnswer":114},"What is the board’s recommendation?",{"text":115,"@type":107},"The staff recommendation is to approve the permit, based on review of the site plan and related requirements.","https://schema.org",{"og:url":83,"og:type":118,"og:title":65,"og:site_name":90,"og:description":67},"article",{"robots":120,"canonical":83},"index,follow",{"doc_id":122,"site_id":62},651018,1792857387,{"code":4,"msg":5,"data":125},{"doc_id":122,"user_id":126,"nickname":87,"user_avatar":127,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":128,"file_id":129,"file_url":130,"file_type":131,"file_size":132,"view_count":4,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":39,"language":133,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":134,"faqs":135,"seo_title":136,"seo_description":67,"update_tm":123,"read_time":46},962088121634,"https://ap-avatar.wpscdn.com/davatar_9964176cb1d06d4a9deccf72a44ae3dc","|  |  | STAFF REPORT   |\n| --- | --- | --- |\n| TO:   | TEA CITY COUNCIL   |  |\n| FROM:   | Kevin Nissen,Planning &Zoning Administrator   |  |\n| AGENDA DATE:   |    June 15,2020   |  |\n\nSchwartzle Mixed-Use Building Permit \\#20-90  \nOwner/Contractor:John Schwartzle  \nLocation:Lot 1&4D,Block 1,Carl Soukup Addition  \nEngineer:JSA Engineering  \nZoning:GB-General Business Commercial  \nThe Board reviewed the site plan to construct a mix-use commercial building on the corner of Main Avenue andGateway Blvd.The 13,000sf building will have commercial on the lower level and 8 apartments above.Theparking is setup for retail and restaurant occupancies.Utilities willcome of Main Avenue and will require a 6”sprinkler main.Access will be off Main and a shared access off Gateway Blvd.Landscape plan does includestreet trees and dumpster screening.Architect stamped building plans will be submitted later.Therecommendation is to approve.  \nAttach:Site Plan and Building Permit $20-90,Redline Building Plans on file at City Hall.  \nUse Ball Point Pen/Press FirmlyDate Received_                   我8-02  \n\n| PROPERTY INFORMATION   |  |  |  |  |  |  |  |  |  | SITE PLAN   |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n| Building Address  \u003Cbr>S00 N. MAiN AVe   |  |  |  |  |  |  |  |  |  | Attached  \u003Cbr>我   |  |\n| Owner or Business Name   |  |  |  |  |  |  |  |  |  |  |  |\n| Lot/Section  \u003Cbr>七40   |  |  |  |  |  | Block/Township   |  |  |  |  |  |\n| Addition/Range  \u003Cbr>ARL W Soukyps AD   |  |  |  |  |  |  |  |  |  |  |  |\n| Zoning District  \u003Cbr>GB   |  | Conditional Use  \u003Cbr>\\#   |  |  |  |  | Board B or Z  \u003Cbr>\\#   |  |  |  |  |\n| Overlay District   |  | Required Parking   |  |  | Flood Plain Development Permit  \u003Cbr>□No  \u003Cbr>□ Yes   |  |  |  |  |  |  |\n| TYPE OF IMPROVEMENT2   |  |  |  |  |  |  |  |  |  |  |  |\n| □ Remodel  \u003Cbr>Foundation Only  \u003Cbr>Raze DU\\#__  \u003Cbr>Historic Preservation  \u003Cbr>□Addition  \u003Cbr>□Change in Use/OC  \u003Cbr>区New Bldg.B.R._  \u003Cbr>□ Other_____  \u003Cbr>Moved On/Relocated  \u003Cbr>Historic Preservation  \u003Cbr>□Repair/Replace  \u003Cbr>Non-conforming certi-  \u003Cbr>initial  \u003Cbr>ficate of occupancy  \u003Cbr>□  \u003Cbr>区  \u003Cbr>5-105   |  |  |  |  |  |  |  |  |  |  |  |\n| Use  \u003Cbr>kes   |  |  |  |  |  |  |  | Land Use Code   |  |  |  |\n| Occ.Class   | Const Rqrd   |  | SIdPlans   |  |  | Plan-\\#   |  |  | Sidewalk Rqrd  \u003Cbr>□ Yes □ No   |  |  |\n| Water Service/Meter    |  | Sewer Cap\\#   |  | Smoke Detectors   |  |  |  |  Waste Water Permit\\#   |  |  |  |\n| Will the public R.O.W.be used to store material or park equipment?□Yes □No   |  |  |  |  |  |  |  |  |  | CONTRACTORS/DESIGNERS   |  |\n| APPLICANT(PRINT)   |  |  |  |  |  |  |  |  |  |  |  |\n| Name  \u003Cbr>c+ Coust   |  |  |  |  |  |  |  | 28-1159   |  | General  \u003Cbr>SAWe   | Sidewalk   |\n| Address  \u003Cbr>0787   |  |  |  |  |  |  |  |  |  | Electrical   | Plumbing   |\n| City  \u003Cbr>比,s   |  |  |  |  |  |  |  | Zi570GC/   |  | Architect   | HVAC   |\n| PERM I T  \u003Cbr>B UIL DIN G  \u003Cbr>NO.  \u003Cbr>THIS IS YOUR PERMIT AND RECEIPT WHEN PROPERLY.VALIDATED.  \u003Cbr>20-96   |  |  |  |  |  |  |  |  |  |  |  |\n| DESCRIPTION OF WORK AND USE:  \u003Cbr>Dui  i小  PLAN  \u003Cbr>WATELNETE凡  \u003Cbr>ADMW FEE  \u003Cbr>PERMIT VALUE  \u003Cbr>PERMIT FEE  \u003Cbr>L.THE UNDERSIGNED.DO HEREBY AFFIRM:THE ABOVE STATEMENTS ARE TRUE AND  \u003Cbr>COBBECT AND AGREE TO COMPLY WITH THE PROVISIONS OF THE ORDINANCES OF THE  \u003Cbr>PENALY FEE  \u003Cbr>CITY OF TEA AND THE APPROVED PLANS AND SPECIFICATIONS ACCOMPANYING THIS  \u003Cbr>APPLICATION.THE PROPOSED WORK IS AUTHORIZED BY THE OWNER AND AUTHORIZA-  \u003Cbr>TOTAL FEE  \u003Cbr>TION TO FNTER THE PROPERTY FOR INSPECTION PURPOSES IS HEREBY GIVEN TO AU  \u003Cbr>THORIZFD REPRESENTATIVES OF THE CITY OF TEA.I ALSO UNDERSTAND THAT I MUST  \u003Cbr>Cash Check Money Order  \u003Cbr>OBTAIN SEPARATE ELECTRICALAND PLUMBING HOMEOWNERS PERMITS OR CONTRACT  \u003Cbr>WITHALICENSEDCONTRACTOR FOR ALLELECTRICALAND PLUMBING WORK.IHEREBY  \u003Cbr>ACCEPT RESPONSIBILITY FOR THE WORK AND REQUIRED INSPECTIONS  \u003Cbr>FOR INSPECTIONS PLEASE CALL:____  \u003Cbr>ZONING OFFICER  \u003Cbr>ZONI","cbCaiiNIVVUSD6kx","https://ap.wps.com/l/cbCaiiNIVVUSD6kx","pdf",2823063,"English","# Staff Report\n## Permit Summary\n## Site Plan and Access\n## Utilities and Fire Protection\n## Recommendation and Attachments","[{\"question\":\"What does the Schwartzle mixed-use building permit include?\",\"answer\":\"It covers a site plan to construct a 13,000 sf mixed-use commercial building with commercial space on the lower level and eight apartments above.\"},{\"question\":\"Where is the proposed project located?\",\"answer\":\"The location is Lot 1 \\u0026 4D, Block 1, Carl Soukup Addition, on the corner of Main Avenue and Gateway Blvd.\"},{\"question\":\"What is the board’s recommendation?\",\"answer\":\"The staff recommendation is to approve the permit, based on review of the site plan and related requirements.\"}]","Schwartzle Mixed-Use Building Permit - Part 20-90 | PDF"]