[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-662896-105":59,"doc-detail-662896-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","schematic-design-drawings-on-1st-phase-figure-4-4","Schematic Design Drawings on 1st Phase - Figure 4-4","","Schematic design drawings for each facility are presented for a phased construction approach. The 1st phase corresponds to constructing UMRT Line 1 first, while the 2nd phase represents completion of the project facilities. For phased construction, station structures of UMRT Line 2 are assumed to be constructed simultaneously with Line 1, but the drawings focus on Line 2 space comprehension without including architectural works or E&M for Line 2 stations. The section includes a drawing list and multiple ground and basement level plans plus sections for the 1st phase.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/schematic-design-drawings-on-1st-phase-figure-4-4/662896/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/schematic-design-drawings-on-1st-phase-figure-4-4/662896.png","ImageObject",300,407,{"name":92,"@type":93},"SundayMiles","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-28",true,{"@type":102,"interactionType":103,"userInteractionCount":19},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What does the 1st phase mean in the schematic design drawings?","Question",{"text":112,"@type":113},"The 1st phase means UMRT Line 1 is constructed first. The section focuses on schematic drawings for facilities corresponding to that initial construction stage.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"How are UMRT Line 2 station structures treated in the 1st-phase drawings?",{"text":117,"@type":113},"Line 2 station structure is supposed to be constructed simultaneously with Line 1, but the drawings include only the Line 2 station structure for space comprehension and do not include architectural works or E&M works for Line 2.",{"name":119,"@type":110,"acceptedAnswer":120},"What kinds of drawings are listed for the 1st phase?",{"text":121,"@type":113},"The document provides a drawing list including multiple figure-based ground level and basement plan drawings and at least two sections (e.g., Section 1 and Section 2) with specified scales.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},662896,1793223143,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":19,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":129,"read_time":144},1099529839202,"https://ap-avatar.wpscdn.com/davatar_a8503ba1806abce46bf441b54a3ca4cd","4.4 SCHEMATIC DESIGN DRAWINGS  \nThe drawings for the schematic designs of each facility are shown in this section. The 1st phase means that UMRT Line 1 is constructed first, and the 2nd phase means that the whole facilities of this project are constructed finally. Both drawings of the 1st phase and the 2nd phase are shown as following.  \n4.4.1 Schematic Design Drawings on 1st Phase  \nIn case of the phased construction, the schematic design drawings on the 1st phase when UMRT Line1 is constructed first are shown in the following pages. The station structure of UMRT Line2 is supposed to be constructed simultaneously with the Line 1 construction. However, the construction is only station structure of Line 2 and does not include the architectural works and E & M works for the station. In these drawings the facility layout of the Line 2 station is shown for the comprehension of the necessary space as Line 2 station structure.  \nThe list of the schematic design drawings is as below.  \nTable 4.26 Drawing List of 1st Phase  \n\n| Drawing No. | Drawing Title | Scale |  |\n| --- | --- | --- | --- |\n| Figure 4.36 | 1st Phase Ground Level Whole Plan | 1/2500 |  |\n| Figure 4.37 | Ground Level Plan 1 | 1/1000 |  |\n| Figure 4.38 | Ground Level Plan 2 | 1/1000 |  |\n| Figure 4.39 | Ground Level Plan 3 | 1/1000 |  |\n| Figure 4.40 | B1 Whole Plan | 1/2500 |  |\n| Figure 4.41 | B1 Plan (Concourse Level) | 1/1000 |  |\n| Figure 4.42 | B2 Plan (Line1 Platform Level) | 1/1000 |  |\n| Figure 4.43 | B3 Plan (Line4 Platform Level) | 1/1000 |  |\n| Figure 4.44 | B4 Plan (Line2 Platform Level) | 1/1000 |  |\n| Figure 4.45 | Section 1 | 1/600 |  |\n| Figure 4.46 | Section 2 |  | 1/600 |\n\n\n| \u003Cbr>BEN THANH MARKET\u003Cbr>\u003Cbr>\u003Cbr>0 50 100 200 m |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- |\n|  |  | Figure4 .36 Glound Level Whole Plan | | | |\n|  |  |  |  |  |  |\n|  |  |  |  |  |  |\n|  |  |  |  | | |\n\n| VT\u003Cbr>VT\u003Cbr>VT\u003Cbr>VT\u003Cbr>VT\u003Cbr>Cooling Tower\u003Cbr>VT\u003Cbr>0 20 50 100 m |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- |\n|  |  | *VT : Ventilation Tower\u003Cbr>Figure4 .37 Glound Level Plan 1 | | | \u003Cbr>|\n|  |  |  |  |  | |\n|  |  |  |  |  |  |\n|  |  |  |  | | |\n|  |  |  |  |  |  |\n\n4-105  \n| 0 20 50 100 m |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- |\n|  |  | Figure4 .38 Glound Level Plan 2\u003Cbr>4-106 | | | |\n|  |  |  |  |  |  |\n|  |  |  |  | | |\n\n| 0 20 50 100 m |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- |\n|  |  | Figure4 .39 Glound Level Plan 3\u003Cbr>4-107 | | | |\n|  |  |  |  |  |  |\n|  |  |  |  | | |\n\n| BEN THANH MARKET\u003Cbr>BEN THANH STATION\u003Cbr>OPERA HOUSE STATION\u003Cbr>Line1\u003Cbr>UNDERGROUND SHOPPING MALL\u003Cbr>(FUTURE)\u003Cbr>0 50 100 200 m\u003Cbr>\u003Cbr>|  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n|  |  | Figure4 .40 B1 Whole Plan | |  |  | |  |  | \u003Cbr>|  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  | | |  | | | |\n|  |  |  |  | | |  |  | | |  |  |  |  |  |\n|  |  |  |  |  | | |  |  |  |  |  |  |  |  |\n\n| VS\u003Cbr>VS |  |  |  |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n| VS\u003Cbr>Air Handling Unit Room |  |  |  | Automatic Fare Automatic Fare\u003Cbr>Collection Collection\u003Cbr>Ticket Machine\u003Cbr>Signal Box\u003Cbr>etc.(300m2)\u003Cbr>Ticket Machine\u003Cbr>Season Ticket Counter (150m2)\u003Cbr>Opening\u003Cbr>Opening\u003Cbr>BEN THANH STATION\u003Cbr>Paied Concourse\u003Cbr>Station Office and WC\u003Cbr>Free Concourse\u003Cbr>Ticket Machine\u003Cbr>Automatic Fare Collection\u003Cbr>(660m2) |  |  |  |  |  |\n| of Line1 (1,280m2) |  |  | MH |  |  |  |  |  |  |\n| MH\u003Cbr>Electric Supply Room, Signalling/Telecomunication Roon, etc of Line1\u003Cbr>(1,280m2) |  |  |  |  |  |  |  |  |  |\n| Ticket Machine\u003Cbr>Station Office\u003Cbr>(190m2)\u003Cbr>0 20 50 100 m |  |  |  |  |  | VS\u003Cbr>VS | | |  |\n|  |  | *VS : Ventilation Shaft\u003Cbr>*MH : Machine Hatch\u003Cbr>Figure4 .41 B1 Plan (Concourse Level) |  |  | |  | |  | \u003Cbr>|\n|  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  | |\n|  |  |  |  |  |  |  |  |  |","cbCaifJbCIY3geNV","https://ap.wps.com/l/cbCaifJbCIY3geNV","pdf",3215844,32,"English","# 4.4 Schematic Design Drawings\n## 4.4.1 Schematic Design Drawings on 1st Phase\n## Drawing List of 1st Phase","[{\"question\":\"What does the 1st phase mean in the schematic design drawings?\",\"answer\":\"The 1st phase means UMRT Line 1 is constructed first. The section focuses on schematic drawings for facilities corresponding to that initial construction stage.\"},{\"question\":\"How are UMRT Line 2 station structures treated in the 1st-phase drawings?\",\"answer\":\"Line 2 station structure is supposed to be constructed simultaneously with Line 1, but the drawings include only the Line 2 station structure for space comprehension and do not include architectural works or E\\u0026M works for Line 2.\"},{\"question\":\"What kinds of drawings are listed for the 1st phase?\",\"answer\":\"The document provides a drawing list including multiple figure-based ground level and basement plan drawings and at least two sections (e.g., Section 1 and Section 2) with specified scales.\"}]","Schematic Design Drawings on 1st Phase - Figure 4-4 | PDF",81]