[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-648264-105":3,"detail-sidebar-cat-0-en-105":81,"doc-detail-648264-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","schematic-design-and-design-development-submission-requirements","Schematic Design and Design Development - Submission Requirements","","Schematic Design and Design Development submission requirements outline the minimum information and drawing package needed for review. The content specifies required uploaded PDF schedules and notarized certifications (including A/E Certification and, when applicable, a physicist’s report). It enumerates drawing categories such as site plan, life safety plans, architectural plans, elevations, vertical circulation, reflected ceiling plans, and multiple M/E/P/FP sets, plus narrative updates and basic project identifiers.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/schematic-design-and-design-development-submission-requirements/648264/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/schematic-design-and-design-development-submission-requirements/648264.png","ImageObject",300,407,{"name":42,"@type":43},"Rhys","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-30","2026-10-23",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",6,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What is required for the Schematic Design and Design Development submission package?","Question",{"text":63,"@type":64},"The submission must include required uploaded PDF schedules and notarized certifications, along with categorized drawings such as site plan, life safety plans, and architectural and engineering sets.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"Are scanned drawings accepted for the submission?",{"text":68,"@type":64},"No. The document states that scanned drawings are not accepted; PDFs must be produced by saving files electronically.",{"name":70,"@type":61,"acceptedAnswer":71},"When is a physicist’s report required?",{"text":72,"@type":64},"A physicist’s report is required if the project contains energy-producing equipment, and it must be notarized.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},648264,1792792883,{"code":4,"msg":82,"data":83},"success",[84,88,92,96,101,105,110,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":89,"show_sort_weight":90,"slug":91},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":93,"show_sort_weight":94,"slug":95},"Exam",70,"exam",{"id":97,"doc_module":4,"doc_module_name":25,"category_name":98,"show_sort_weight":99,"slug":100},5,"Comic",60,"comic",{"id":55,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":107,"show_sort_weight":108,"slug":109},7,"Healthcare",40,"healthcare",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":112,"slug":113},8,30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":97,"slug":129},19,"General","general",{"code":4,"msg":82,"data":131},{"doc_id":79,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":111,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":139,"language":140,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":12,"update_tm":80,"read_time":112},687207024643,"https://ap-avatar.wpscdn.com/davatar_3d24733baf745e90a7e4bdd5f77d97b2","| REQUIRED INFORMATION AND DRAWINGS |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- |\n| Schematic Design and Design Development |  |  |  |  |  |\n| Phase |  | Drawing Type, Format and Minimum Information Required | Complies |  | Comments |\n| Schematic | Design\u003Cbr>Development |  | Schematic | Design\u003Cbr>Development |  |\n| ● | ● | Required Information to be included part of the Submission |  |  |  |\n| ● | ● | Schedule 6 uploaded asa PDF in NSYECON | - | - |  |\n| ● | ● | Architecture and Engineering Certification (A/E Cert Form) Notarized | - | - |  |\n|  | ● | Physicist's Report (If project contains energy producing equipment. ) Notarized | N/R | - |  |\n| ● | ● | Functional Space Program: A record of the key environment of care considerationsand facility functional and operational parameters that drive the space program fora project. Note: The governing body or its delegate develops the functional program, which is intended to inform the designers of record, authority having jurisdiction, and users of the facility. The size and complexity of the project will determine the length and complexity of the functional program. | - | - |  |\n| ● |  | FEMA Certification (FEMA BFE Certification) If project site is located in a flood plain or subject to flooding. | - | - |  |\n|  |  | Drawings separated and labeled per\"NYSDOHAND DASNY ELECTRONIC DRAWINGS SUBMISSION GUIDANCE FOR CON REVIEWS\" |  |  |  |\n| ● | ● | Size limit does not exceed 100 MB. | - | - |  |\n| ● | ● | PDF that is produced by saving files electronically. Scanned drawings are not accepted. | - | - |  |\n| ● | ● | Site Plan (SP100) | - | - |  |\n| ● | ● | Life Safety Plans (LSC 100) | - | - |  |\n|  | ● | Schedules (A000) | N/R | - |  |\n| ● | ● | Architectural Plans and Roof Plans (A100) | - | - |  |\n| ● | ● | Ex terior Elevations and Sections (A200) | - | - |  |\n| ● | ● | Vertical Circulation (A300) | - | - |  |\n| ● | ● | Reflected Ceiling Plans (A400) | - | - |  |\n|  | ● | Wall Sections and Details (A500) | N/R | - |  |\n|  | ● | Interior Elevations, Enlarged Plans and Details (A600) | N/R | - |  |\n|  | ● | Fire Protection (FP100) | N/R | - |  |\n|  | ● | Mechanical Systems (M100) | N/R | - |  |\n|  | ● | Electrical Systems (E100) | N/R | - |  |\n|  | ● | Plumbing Systems (P100) | N/R | - |  |\n| ● |  | Narrative (A/E Narrative) (If the scope of work has been modified from the SD submission, provide updated narrative.) |  |  |  |\n| ● |  | Intent /purpose | - | N/R |  |\n| ● |  | Site Location | - | N/R |  |\n\n\n| ● |  | Description of existing facility, w hat type of facility is this? |  | - | N/R |  |\n| --- | --- | --- | --- | --- | --- | --- |\n| ● |  | Description of proposed facility, w hat type of facility is this? |  | - | N/R |  |\n| ● |  | Addition, alteration and/or renovation |  | - | N/R |  |\n| ● |  | Square footages of existing floor and building |  | - | N/R |  |\n| ● |  | Square footagesof proposed floor and building. |  | - | N/R |  |\n| ● |  | Does the work exceed 50% of the floor or building area? |  | - | N/R |  |\n| ● |  | Is the building sprinklered throughout? |  | - | N/R |  |\n| ● |  | Construction type per NFPA 220 Table 4.1.1 |  | - | N/R |  |\n| ● |  | W hat is the building height? |  | - | N/R |  |\n| ● |  | Indicate the number of stories |  | - | N/R |  |\n| ● |  | Indicate story where the work located. |  | - | N/R |  |\n| ● |  | Is the building a High-Rise Building? |  | - | N/R |  |\n| ● |  | Is the space located ina Basement , Underground or Window less Building? |  | - | N/R |  |\n| ● |  | Is the building a Mixed Occupancy? Ifso, indicate the other occupancies. |  | - | N/R |  |\n| ● |  | Non-Article28 Mixed Occupancies |  | - | N/R |  |\n| ● |  | W ill the project be phased? |  | - | N/R |  |\n| ● |  | Is the temporary space involvedwith this project? |  | - | N/R |  |\n| ● |  | Does the project include shell space? If so, please indicate. |  | - | N/R |  |\n| ● |  | Are there any changes to the existing bed count? |  | - | N/R |  |\n| ● |  | Will there be a change to ","cbCaihCh1IOf1i4a","https://ap.wps.com/l/cbCaihCh1IOf1i4a","pdf",259528,12,"English","# Required Information and Drawings\n## Schematic Design and Design Development\n## Required Submission Items\n## Drawing Categories and Basic Project Information","[{\"question\":\"What is required for the Schematic Design and Design Development submission package?\",\"answer\":\"The submission must include required uploaded PDF schedules and notarized certifications, along with categorized drawings such as site plan, life safety plans, and architectural and engineering sets.\"},{\"question\":\"Are scanned drawings accepted for the submission?\",\"answer\":\"No. The document states that scanned drawings are not accepted; PDFs must be produced by saving files electronically.\"},{\"question\":\"When is a physicist’s report required?\",\"answer\":\"A physicist’s report is required if the project contains energy-producing equipment, and it must be notarized.\"}]","Schematic Design and Design Development - Submission Requirements | PDF"]