[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-649553-105":59,"doc-detail-649553-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","scdot-pipe-installation-and-acceptance-sc-m-714-std-drawings","SCDOT PIPE INSTALLATION AND ACCEPTANCE - SC-M-714 & STD. DRAWINGS","","SCDOT pipe installation and acceptance training material covering SC-M-714 and related standard drawings. It explains the historical background of the SC-M-714 pipe review committee, recommended changes to improve installation procedures and acceptance requirements, and the role of material validation plus post-installation inspection. The content emphasizes inspector responsibilities, safety considerations, and critical inspection steps upon pipe arrival, during construction, and after installation, including proper classes, diameters, gaskets, markings, damage checks, and proper backfill compaction.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":30,"@type":76,"position":81},"https://docshare.wps.com/document/technology/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/scdot-pipe-installation-and-acceptance-sc-m-714-std-drawings/649553/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/scdot-pipe-installation-and-acceptance-sc-m-714-std-drawings/649553.png","ImageObject",300,407,{"name":92,"@type":93},"Jiven","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-27","2026-10-24",true,{"@type":102,"interactionType":103,"userInteractionCount":14},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What is the purpose of the training for permanent pipe culverts?","Question",{"text":112,"@type":113},"The training introduces inspectors to concepts in the Standard Specifications, Special Provisions, Standard Drawings, and other sources related to permanent pipe culverts. It is not a substitute for official SCDOT documents, and field questions should be directed to the RCE using project plans and specifications.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What should be checked when the pipe arrives?",{"text":117,"@type":113},"Upon arrival, check for proper class and diameter (or gage), gasket material, SCDOT markings, certification, and any damage. The material also highlights ensuring joints are fully assembled and that backfill is properly compacted as specified.",{"name":119,"@type":110,"acceptedAnswer":120},"Why is inspection critical after installation?",{"text":121,"@type":113},"Inspection matters because many issues stem from installation, and SC-M-714 is performance based. Proper installation and communication of the pipe location to other crews reduce expensive pipe rehabilitation, repair, and replacement problems.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},649553,1793084884,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":29,"category_name":30,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":14,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":144,"read_time":145},1099513958607,"https://ap-avatar.wpscdn.com/avatar/100002390cf8733938c?x-image-process=image/resize,m_fixed,w_180,h_180&k=1778829742770036399","2/22/2021  \nSCDOT PIPE INSTALLATION AND ACCEPTANCE  \nSC-M-714 & STD. DRAWINGS 01/01/2021  \n| ASKING A LOT OF QUESTIONS UNLOCKS LEARNING AND IMPROVES INTERPERSONAL BONDING. |  |  |  |\n| --- | --- | --- | --- |\n| | | | |\n\n2/22/2021  \n\n| STANDARD’S HISTORIC BACKGROUND |  |\n| --- | --- |\n| | 􀁦 SCDOT Pipe Review Committee and Dr. Sarah Gassman, University of South Carolina\u003Cbr>􀁦 Recommended:\u003Cbr>􀁦 Improving installation procedures and acceptance requirements\u003Cbr>􀁦 Create Competition by allowing:\u003Cbr>􀁦 Aluminum Alloy (Not Coated Steel)\u003Cbr>􀁦 High Density Polyethylene\u003Cbr>􀁦 Reinforced Concrete\u003Cbr>􀁦 Created SC-M-714\u003Cbr>􀁦 Created 714 Standard Drawings with Fill Height Charts\u003Cbr>􀁦 Required third party material validation and post installation inspection\u003Cbr>􀁦 Updated January 1, 2021 by SCDOT |\n\n\n| SC-M-714 |  |\n| --- | --- |\n| TRI-COUNTY COMMUNITY COLLEGE COURSE ON:\u003Cbr>PERMANENT PIPE CULVERTS | |\n| This training is designed to introduce inspectors to the concepts contained in the Standard Specifications, Special Provisions, Standard Drawings and other related sources related to permanent pipe culverts. It is not a substitute for official SCDOT documents. For project specific information, see project plans and specifications, and consult with the Resident Construction Engineer (RCE) when questions come up in the field.\u003Cbr>\u003Cbr>|  |\n\n2/22/2021  \n\n| A WORD ABOUT SAFETY\u003Cbr>This presentation does not purport to address all the safety concerns associated with the installation of buried pipes. It is the responsibility of the user (e.g. owner, engineer, contractor, technician, etc. ) to establish appropriate safety and health practices and determine the application of regulatory limitations prior to use. This presentation is not affiliated with any training requirement by SC OSHA for Competent Trench Safety Personnel. |  |\n| --- | --- |\n| | |\n\n\n| Inspection is CRITICAL\u003Cbr>“The Best Pipe Maintenance is Correct Pipe Installation”\u003Cbr>Pipe rehabilitation, repair, and replacement is Expensive | |\n| --- | --- |\n\n2/22/2021  \n\n| \u003Cbr>When Pipe arrives check for:\u003Cbr>1) Proper Class & Diameter\u003Cbr>2) Proper Gasket Material\u003Cbr>2) SCDOT Markings\u003Cbr>3) Damage | \u003Cbr>Damaged pipe | |\n| --- | --- | --- |\n|  | | Make sure pipe is Installed well. |\n| Use proper joint material |  |  |\n\n\n| \u003Cbr>Construction damage & Soft foundation | | \u003Cbr>Construction damage Poorly assembled connection & Impact damage |\n| --- | --- | --- |\n| Construction damage. Shallow cover high live load or deep cover on hard foundation |  |  |\n\n4  \n4  \n2/22/2021  \n\n| \u003Cbr>When Pipe arrives check for:\u003Cbr>1) Gage\u003Cbr>2) Certification\u003Cbr>3) Damage | \u003Cbr>After installation ensure other Crews know where the pipe is. |\n| --- | --- |\n\n\n| \u003Cbr>Construction conflictsKnow your plans and highlight Construction conflicts. | \u003Cbr>Inspector who didn’t know where His conflicts were. |\n| --- | --- |\n\n5  \n5  \n2/22/2021  \nWhen pipe arrives check for:  \n1) Proper pipe diameter  \n2) Certification  \n3) Damage to pipe  \nMake sure backfill is properly Compacted as specified  \nEnsure joints are fully assembled  \n\n| \u003Cbr>Construction damage:\u003Cbr>Ensure backfill in compacted Evenly on both sides of the pipe. | \u003Cbr>Construction damage:\u003Cbr>Ensure there is proper cover over Pipe. |\n| --- | --- |\n\n6  \n6  \n2/22/2021  \nWhy Inspect?  \nMost of these problems are related to installation  \nSC M-714 is Performance Based  \nWhy should inspection matter to YOU?  \nBuild a better Future!  \n2/22/2021  \nSCDOT Specification  \nSC-M-714 & Std. Drawings  \nSCDOT Standard Specifications for Highway Construction  \n[2007 Edition]  \n2/22/2021  \n[https://www.scdot.org/business/road-technical-specs.aspx](https://www.scdot.org/business/road-technical-specs.aspx)  \nSC-M-714   \n[https://www.scdot.org/business/standard-drawings.aspx](https://www.scdot.org/business/standard-drawings.aspx)  \n9  \n9  \n2/22/2021  \n􀁦 QUICK-REVIEW HANDOUT OF SUMMARY OF 2021 REVISIONS and UPDATES by SCDOT Pre-Construction  \nWHAT’S NEW SC-M-714 & STANDARD DRAWINGS  \nSCDOT Standard Drawings","cbCaiqAp5V4c6Fql","https://ap.wps.com/l/cbCaiqAp5V4c6Fql","pdf",33594473,58,"English","# SCDOT Pipe Installation and Acceptance\n## Standard’s Historic Background\n## A Word About Safety\n## Inspection Is Critical\n## When Pipe Arrives: Checks and Documentation\n## Construction Damage and Soft Foundation\n## Why Inspect?","[{\"question\":\"What is the purpose of the training for permanent pipe culverts?\",\"answer\":\"The training introduces inspectors to concepts in the Standard Specifications, Special Provisions, Standard Drawings, and other sources related to permanent pipe culverts. It is not a substitute for official SCDOT documents, and field questions should be directed to the RCE using project plans and specifications.\"},{\"question\":\"What should be checked when the pipe arrives?\",\"answer\":\"Upon arrival, check for proper class and diameter (or gage), gasket material, SCDOT markings, certification, and any damage. The material also highlights ensuring joints are fully assembled and that backfill is properly compacted as specified.\"},{\"question\":\"Why is inspection critical after installation?\",\"answer\":\"Inspection matters because many issues stem from installation, and SC-M-714 is performance based. Proper installation and communication of the pipe location to other crews reduce expensive pipe rehabilitation, repair, and replacement problems.\"}]","SCDOT PIPE INSTALLATION AND ACCEPTANCE - SC-M-714 & STD. DRAWINGS | PDF",1792801461,146]