[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-663309-105":3,"detail-sidebar-cat-0-en-105":80,"doc-detail-663309-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","scdot-as-built-manual-2015","SCDOT As-Built Manual - 2015","","SCDOT AS-BUILT MANUAL (2015) provides definitions and step-by-step requirements for producing as-built drawings after construction completion. It explains how as-built plans must reflect all changes from the as-let working drawings, document revisions in red, and maintain accurate dimensions, geometry, and surveyed locations. The manual details plan set delivery timelines, required supporting submittals, required cover sheet formats, indexing rules, scale and size standards, and sign-and-seal expectations by a Professional Engineer.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/scdot-as-built-manual-2015/663309/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/scdot-as-built-manual-2015/663309.png","ImageObject",300,407,{"name":42,"@type":43},"SALUTone","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-29","2026-10-28",true,{"@type":52,"interactionType":53,"userInteractionCount":33},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"What does the manual define as “as-built” drawings?","Question",{"text":62,"@type":63},"“As-built” drawings are revised drawings submitted upon completion that reflect all specification and working-drawing changes made during construction. They document exact dimensions, geometry, and surveyed locations for completed work.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"How should changes be shown in the final as-built plan set?",{"text":67,"@type":63},"All approved revisions must be shown in red on the as-built plans. The plans should mirror the as-let plans closely, with differences limited to revised sheets added during construction and any required end additions.",{"name":69,"@type":60,"acceptedAnswer":70},"What are the required deliverables and signing requirements for as-built plans?",{"text":71,"@type":63},"The Resident Construction Engineer must deliver final as-built plans within 45 days of project acceptance, along with supporting items such as pile logs, drill shaft logs, and utility/shop plans. The final plans must be signed and sealed by a Professional Engineer certifying a true and correct representation of the work as constructed.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},663309,1793226424,{"code":4,"msg":81,"data":82},"success",[83,87,91,95,100,105,110,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":84,"show_sort_weight":85,"slug":86},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":88,"show_sort_weight":89,"slug":90},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":92,"show_sort_weight":93,"slug":94},"Exam",70,"exam",{"id":96,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},5,"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},6,"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":107,"show_sort_weight":108,"slug":109},7,"Healthcare",40,"healthcare",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":112,"slug":113},8,30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":96,"slug":129},19,"General","general",{"code":4,"msg":81,"data":131},{"doc_id":78,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":111,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":33,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":139,"language":140,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":12,"update_tm":79,"read_time":144},5909897206756,"https://ap-avatar.wpscdn.com/avatar/5600152dbe4a7e99502?x-image-process=image/resize,m_fixed,w_180,h_180&k=1792654152478566863","2015  \nSCDOT AS-BUILT MANUAL  \nTABLE OF CONTENTS  \nSection 1: Introduction ................................................................................................................................ 3  \nSection 2: Plan Sets ...................................................................................................................................... 3  \nSection 3: Forms needed for As-builts ......................................................................................................... 4  \nSection 4: General Procedures ..................................................................................................................... 5  \nSection 5: Examples ..................................................................................................................................... 7  \nSection 6 : Sign and Seal Policy ................................................................................................................... 13  \nSection 7 : Submittal ................................................................................................................................... 14  \nAppendix A: Contract Small Format Electronic Process............................................................................. 15  \nSection 1: Introduction  \n“As-built” definition: A revised set of drawings submitted upon completion of a projector a particular job which reflects all changes made in the specification and working drawings during the construction process. The revised drawings show the exact dimensions, geometry, and surveyed location of all elements of the work completed under a contract.  \nAs-built plans are the final product of an accurately red-lined and up to date set of as-let construction plans. The As-built plans represent the work performed in the field by clearly and accurately documenting, in red, any changes to the as-let plan documents. Each office shall have a set of plans specifically for the purpose of recording As-built information. This set of Asbuilt plans is to be kept up to date throughout the entire duration of the construction project. Any modifications, additions, or deletions made during construction shall be documented on the As-built plans as soon as practical. It is imperative that as the project is constructed, so are the As-built plans. Having a comprehensive, all-inclusive As-built set of plans is vital to the success of this process.  \nSection 2: Plan Sets  \nThe Resident Construction Engineer shall produce and deliver to the Plans Storage Office the final As-built plans for each contract within 45 days of project acceptance. All changes to the original as-let plan documents are to be shown in red. The As-built plans shall show all approved revisions to the contract design including but not limited to: revised roadway alignments, profiles and cross sections, revised typical sections, revised drainage installations, any changes to the demolition and removal items, utility locations, and any other changes to the original design. In addition, Pile logs, Drill Shaft logs, Borrow quantity calculations, Right of Way Plats, Utility Plans, and Shop Plans are to be submitted with the As-built plans. The final As-built plans shall be signed and sealed by a Professional Engineer. The As-built plans shall certify a true and correct representation of the work as constructed.  \nAs-built plans are to mirror as-let plans as closely as possible. The only difference shall be limited to any revised sheets added during construction and any other required sheets added at the end of the As-built plans.  \nAs-built plans are to be submitted at the same scale and size as the as-let plans. Full size plans are 22” x 36”. Small format plans are 8.5” x 11”.  \nRequirements for As-built Plans are subject to change as policy and technology improves. Please utilize the web site for all information. All information is found at:  \n[http://www.scdot.org/doing/constructionLetting_AsBuilt.aspx](http:/","cbCaibua0jrdmtAi","https://ap.wps.com/l/cbCaibua0jrdmtAi","pdf",5270104,38,"English","# Introduction\n# Plan Sets\n# Forms needed for As-built plans\n# General Procedures\n# Examples\n# Sign and Seal Policy\n# Submittal\n# Appendix A: Contract Small Format Electronic Process","[{\"question\":\"What does the manual define as “as-built” drawings?\",\"answer\":\"“As-built” drawings are revised drawings submitted upon completion that reflect all specification and working-drawing changes made during construction. They document exact dimensions, geometry, and surveyed locations for completed work.\"},{\"question\":\"How should changes be shown in the final as-built plan set?\",\"answer\":\"All approved revisions must be shown in red on the as-built plans. The plans should mirror the as-let plans closely, with differences limited to revised sheets added during construction and any required end additions.\"},{\"question\":\"What are the required deliverables and signing requirements for as-built plans?\",\"answer\":\"The Resident Construction Engineer must deliver final as-built plans within 45 days of project acceptance, along with supporting items such as pile logs, drill shaft logs, and utility/shop plans. The final plans must be signed and sealed by a Professional Engineer certifying a true and correct representation of the work as constructed.\"}]","SCDOT As-Built Manual - 2015 | PDF",96]